  Status of commissioning, report also here plots are reports., Page 5 of 24  Not logged in ELOG logo
ID Date Authordown Status Type Category Location Title Text Attachments
  184   Wed Feb 8 11:25:50 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementwe have had this new issue (watchdog alarm
switching off the amplifier) for several
days.
 scope.jpg 
  185   Wed Feb 8 14:09:50 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWith Daniele after, we took a readings
of the beam with a lens of 750 mm.

From the observed data, we can
 20230208_error_watchdog.jpeg 
  186   Fri Feb 10 09:54:46 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning,

- with the "Alphanov"
software => Central panel => "system"
  
  187   Tue Feb 14 12:53:09 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Daniele, we did a second
measurement of the beam profile using a different
lens of focal 400 mm.
  
  188   Wed Feb 22 16:11:32 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementOn Monday 20th of February, Daniele and
Viktor took some beam profile measurement
data @ 50% of power amplification.
 Analyse_DonnĂ©es_20_fevrier.pptx 
  189   Thu Feb 23 10:15:30 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurement
Yesterday,
Guillaume Machinet and Vincent Clet from
Alphanov came to fixe some issues with the
  
  190   Mon Feb 27 18:23:13 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementThis morning with Victor we took a reading
of the beam profile using a 400 mm lens
at 70 % and 100 % amplification.
 WhatsApp_Image_2023-02-27_at_6.07.00_PM.jpeg 
  191   Wed Mar 8 14:49:12 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementthis morning with Manar,
we checked the Alphanov amplifier
issue : "The laser has been stopped
 20230308_124313.jpg 
  192   Wed Mar 8 15:11:49 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,

- we installed the Koheras below
 20230308_121713.jpg 
  193   Mon Mar 13 14:02:59 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. 
  
  194   Mon Mar 13 16:10:24 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementWe took reading of the beam profile of
the amplifier without a lens @ 30 cm from
the 2nd wedge for amplification percentages
 Beam_wavefront_30cm_no_Lens.jpg 
  199   Mon Mar 20 09:33:54 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thAll the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th :
  
  200   Mon Mar 20 17:23:09 2023 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayAs the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep
 MCS_Network_Interface_Configuration_Guide-1.pdf20230320_154643[1].jpg 
  201   Mon Mar 20 17:39:28 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thToday, I restarted all the equipements
:

Chiller                                                
  
  202   Mon Mar 20 17:55:25 2023 Ronic ChicheFixedreportlasers and optics | softwareThomX iglooAlphanov amplifier beam profile measurementdue to several "case temperature"
issues, I change the "Max case temperature"
in the "general config" of the
  
  213   Thu Jun 1 10:31:45 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthe last tries to lock the 33MHz + amplifier
to the 30k Finesse FP-cavity were unsuccessful.

during a laser Frep scan using
 120705_Displacement_of_cylindrical_piezo_ceramics.xls 
  214   Thu Jun 1 18:15:04 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockfinding the right modulation/demodulation
PDH phase is very difficult on the main resonance
because the we get non stationnary signals
  
  217   Tue Jun 6 15:52:59 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier locktoday with Daniele, we locked easily (but
with a noisy lock) on the secundary resonance
and we tried to lock on the main resonance
 M250_Video_Amplifier.pdfM250_manual.pdf 
  219   Thu Jun 8 11:12:20 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockAfter removing the 2 generators from the
optical table, the lock is much more stable
and now, it is possible to lock on the main
  
  222   Tue Jun 20 18:45:10 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthis morning, I tested the laser+amplifier
@ 30% lock on the FP cavity with and without
Smaract motors.
 PDH_error_signal_with_Smaract_motors_ON-OFF.jpgLock_at_amp_@30%.jpg10kW_in_remote.jpg 