ID Date Author Status Type Category Locationdown Title Text Attachments
  149   Tue Apr 26 11:12:58 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  150   Tue Apr 26 11:15:23 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  151   Tue Jun 14 10:43:07 2022 Ronic ChicheFixedinfovacuumThomX iglooVessels vacuum at ambiant pressureLast Friday and this morning, with Bruno,
we close the ring/cavity valves and put some
dry air in the two vessels through a filter
  
  152   Wed Jun 15 15:18:57 2022 Ronic ChicheFixedinfolasers and opticsThomX igloomirrors removingThis morning with Viktor, we opened the
2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in
  
  160   Thu Oct 13 12:26:07 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentToday, after laser was modelocked, we checked
the power inside the fiber coming from the
Alphanov Strecher box.
  
  161   Mon Oct 17 13:58:08 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Viktor, we started the
alignment of the CVBG and fiber.

we did a better alignment of the
 Adjustment_SMS.pdf 
  162   Tue Oct 18 17:51:12 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentIn preparation for tomorrow morning, I
did a test with a 45° mount to have a
power pickup inside the injection box.
  
  163   Wed Oct 19 14:57:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we measured the
power at different points:
- direct measurement at the output
  
  164   Wed Oct 19 15:01:32 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Ronic, using a pickup
mirror, we measured the power in different
locations along the path of the stretcher
  
  165   Thu Oct 20 15:01:02 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentI used the 33MHz spectrum measurement :
https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/153
fitted by P=P0*sech²((f-f0)/df)
 D24-02.xls33MHz_power_spectrum_after_double_patch_strecher_CVBG.png 
  166   Mon Oct 24 17:35:01 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentManar + Victor, today in the morning we
aligned the CVBG of the stretcher.

The double path using the mirror
  
  167   Wed Nov 2 11:42:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we continued the
strecher CVBG alignment and fiber injection
procedure :
  
  168   Thu Nov 3 09:09:18 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentthis morning : still 6.2 mW at the output
of the fiber.

the powermeter has been removed
  
  169   Wed Nov 9 11:34:54 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentMonday 7/11 morning, the power in the fiber
was still 6.2 mW

  
  170   Wed Nov 9 13:03:50 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueon Monday morning 7/11, we tried to restart
the Alphanov amplifier which was not turned
on since end of april 2022, but it didn't
  
  171   Wed Nov 9 14:49:52 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueI just tested the fuse inside the black
ON/OFF switch on the rear panel => it
is OK ! :-(
  
  172   Thu Dec 1 13:51:05 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueThe laser amplifier controller has been
sent yesterday and received today by Alphannov.

they should do the assessment quickly...
  
  173   Tue Dec 6 11:47:36 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueToday, I did a Teams meeting with Guillaume.
He didn't see any problem with
the controller.
 Sécurité_et_CC_ampli_Alphanov.pdf 
  174   Thu Dec 15 11:41:36 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier issueYesterday, we received the controller back
from Alphanov
and I tested it immediately in the
  
  175   Mon Jan 2 15:21:09 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier beam profile measurementtoday with Manar, we brought everything
to make the profile measurement.

the chiller was in error
  