Entry   Alphanov amplifier compressor's CVBG thermal images, posted by Ronic Chiche at ThomX igloo about lasers and optics Thermal_images.pdf
last Friday with Manar, we took some thermal images of the Alpnavov compressor box.

I post a small document to summarize some points :

- the 2 mirrors used to make the CVBG injection are polarized thin-film mirrors... thus sensitive to the beam polarization.
Entry   Alphanov amplifier compressor's CVBG thermal images, posted by Ronic Chiche at ThomX igloo about lasers and optics Thermal_images.pdf
last Friday with Manar, we took some thermal images of the Alpnavov compressor box.

I post a small document to summarize some points :

- the 2 mirrors used to make the CVBG injection are polarized thin-film mirrors... thus sensitive to the beam polarization.
Entry   Vessels vacuum at ambiant pressure, posted by Ronic Chiche at ThomX igloo about vacuum 
Last Friday and this morning, with Bruno, we close the ring/cavity valves and put some dry air in the two vessels through a filter to avoid turbulences.

Now, the two vessels are at ambient pressure and ready for opening (to remove the mirrors).

One can let the ambient pressure in the vessels as long as we want, the ring/cavity valves have been chosen to be compatible with the high vacuum
Entry   mirrors removing, posted by Ronic Chiche at ThomX igloo about lasers and optics 
This morning with Viktor, we opened the 2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in plastic boxes with labels to indicate which mirror it is,

and with all the HR coatings face down.
Entry   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Today, after laser was modelocked, we checked the power inside the fiber coming from the Alphanov Strecher box.
it was almost zero, at the nW level.

after doing some very rough alignment, we clearly saw some power (with the powermeter) correlated with the position of mirrors, when turning
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics Adjustment_SMS.pdf
This morning with Viktor, we started the alignment of the CVBG and fiber.

we did a better alignment of the 2-pass CVBG.
we are able to the see a spot after PBS (after the 2 CVBG pass) which means the alignment is OK even if it can be improved.
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
In preparation for tomorrow morning, I did a test with a 45° mount to have a power pickup inside the injection box.

I used the 133MHz laser.
output power measured with the powermeter : 45mW
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
This morning with Manar, we measured the power at different points:
- direct measurement at the output of the 33MHz laser : 35 mW
inside the injection box :
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
This morning with Ronic, using a pickup mirror, we measured the power in different locations along the path of the stretcher box

Output power from oscillator : ~35mW

After the isolator : ~ 35 mW
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics D24-02.xls33MHz_power_spectrum_after_double_patch_strecher_CVBG.png
I used the 33MHz spectrum measurement : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/153
fitted by P=P0*sech²((f-f0)/df)
f0 = c/1030m
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Manar + Victor, today in the morning we aligned the CVBG of the stretcher.

The double path using the mirror mounts, reached up to 5.4 mW just before the injection into the fibers

then we rotated the quarter wave plate and the power increased by a factor of ~ 2 to 10.3 mW
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
This morning with Manar, we continued the strecher CVBG alignment and fiber injection procedure :

- we checked the power at the output of the laser and confirmed the measurement after the Isolator : ~ 36 mW
- we tried to improve the power after the strecher CVBG by rotating the quarter-wave plate but it seems we were already at the maximum : ~ 10.5
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
this morning : still 6.2 mW at the output of the fiber.

the powermeter has been removed and the fiber connected to amplifier input fiber (no EOM connected in between).




Ronic
    Reply   Strecher and fiber injection alignment, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Monday 7/11 morning, the power in the fiber was still 6.2 mW




Ronic
Chiche wrote:



this morning : still 6.2 mW at the output of the fiber.
Entry   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
on Monday morning 7/11, we tried to restart the Alphanov amplifier which was not turned on since end of april 2022, but it didn't start.

we did a standard "turn ON" procedure :
- check the safety button on the front panel (which has to be released).
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
I just tested the fuse inside the black ON/OFF switch on the rear panel => it is OK ! :-(




Ronic
Chiche wrote:



on Monday morning 7/11, we tried to restart the Alphanov amplifier
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
The laser amplifier controller has been sent yesterday and received today by Alphannov.

they should do the assessment quickly...




Ronic
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics Sécurité_et_CC_ampli_Alphanov.pdf
Today, I did a Teams meeting with Guillaume.
He didn't see any problem with the controller.
normally, the controller will be shipped to the lab tomorrow.
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Yesterday, we received the controller back from Alphanov
and I tested it immediately in the optical room.
if the software is properly talking to the controller, everything works normally.
Entry   Alphanov amplifier beam profile measurement, posted by Ronic Chiche at ThomX igloo about lasers and optics 
today with Manar, we brought everything to make the profile measurement.

the chiller was in error because of the water level : we filled it in.
! warning ! there is no alarm signal, only a message on the screen.