Status of commissioning, report also here plots are reports., Page 23 of 24
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
461 Entries
Goto page
Previous
1
,
2
,
3
...
22
, 23,
24
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
77
Wed Nov 6 16:11:12 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Spherical mirrors at closest position. FSR, finesse and beam size.
The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
78
Wed Nov 13 14:44:56 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
79
Wed Nov 13 15:05:18 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
80
Thu Nov 21 11:37:13 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive Origami 33MHz specs
Beam Size Onefive added
83
Tue Nov 26 16:21:27 2019
Loïc Amoudry
Fixed
issue
vacuum
Optical room
Pneumatic valves
The pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
85
Wed Nov 27 13:53:57 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
The pump voltage has been increased few
days ago when looking for a modlock of the
laser.
86
Thu Nov 28 10:40:29 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
CVBG reference and Eric Cormier calculation
The Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection.
87
Tue Feb 4 14:39:56 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
Onefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.
91
Fri Feb 14 18:02:37 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Telescope for compressors and ThomX
CVBGs telescope is done with w ~= 1mm.
ThomX telescope is done with w
~= 2.3mm in x and y.
92
Tue Feb 18 12:24:00 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
ThomX Locked with CVBGs
ThomX has been locked with a new telescope
while using compression CVBGs.
Coupling is ~50-55% and lock is stable.
93
Wed Feb 19 17:21:28 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Powerup with 2.5ps pulses
A power up has been performed on ThomX
until 65kW intracavity power. We didn't
see any modes but stored power was really
100
Tue Jun 16 13:03:52 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse measurement after confinement
After 3 months without human presence,
finesse has been measured 3 times with
average optimization:
102
Tue Oct 27 13:13:50 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Coating reflectivity
Coatings reflectivity curves and datas
for HR Saphir, HR Suprasil and HR ULE.
6x
103
Fri Nov 6 14:23:16 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Beam size and finesse
Measurement behind P4 (planar mirror)
104
Fri Dec 18 16:10:04 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Onefive ouput power and spectrum
After turning on, one can see the 133.33MHz
Onefive output power for ~40min with OD2
filter (~/20). So the real output power is
105
Fri Dec 18 17:06:53 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Onefive ouput power and spectrum
1) Note: The OneFive laser used for
experimenting is the one for the SBox
but, for now only this laser arrived
154
Tue Aug 30 18:31:49 2022
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
We checked the Dichroic mirror we have
: it is a DMSP1000 shortpass dichroic mirror
as specified in this post.
43
Tue Jun 18 20:44:34 2019
Huan Wang
Fixed
info
lasers and optics
Optical room
telescope for Koheras
telescope of Koheras is removed, information
record here:
- distance between collimator edge
367
Tue Oct 8 11:59:27 2024
Fatematuj Johora
Under Process
report
lasers and optics
Optical room
Characterizing Focus Tunable Lens
Yesterday Ronic and I worked on the high
laser power measurements with the Vertical
set-up of the Focus Tunable Lens. We went
270
Fri Sep 22 11:30:28 2023
Daniele Nutarelli
Fixed
report
lasers and optics
Optical room
Laser FP operation
This morning FP Laser was operating well
locked at 30 KWatts in stable vay.
There are some fluctuations due