  72   Thu Oct 10 17:51:26 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
  
  73   Thu Oct 10 18:03:10 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
 Image1.png 
  74   Fri Oct 11 18:42:32 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
  
  75   Fri Oct 11 18:49:00 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew locking schemeBefore, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
  
  81   Fri Nov 22 17:56:56 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issuesince some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally
  
  82   Tue Nov 26 16:11:52 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
  
  84   Tue Nov 26 16:35:39 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical room30Hz noise issueThe 30 Hz noise issue has been solved !

It came from translation stage
of P1 and/or P4.
  
  88   Fri Feb 7 14:46:55 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationWe installed the 2 CVBG for compression
after the amplifier.
We used an interferometric technique
 interferences.avipulse_duration.png 
  89   Wed Feb 12 17:43:43 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationYesterday, Loic installed a telescope before
CVBG's to reduce the spot size on CVBG's
and reduced the incident angle 0.5-1°
 pulse_width.png 
  90   Fri Feb 14 09:26:07 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationYesterday, Loïc put the CVBG's
back to their specified angles.

We used an interferometric technique
 interferences_pulse_duration.png 
  94   Mon Feb 24 16:28:52 2020 Ronic ChicheFixedreportlasers and opticsOptical roomBeam pulse durationLast Thursday (20th of February), Loïc
and Titouan realigned the stretcher CVBG
to its nominal angle and they used an interferometric
 Interferences_pulse_width.png 
  95   Wed Feb 26 10:38:37 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum analyzer resolutionThe Koheras @0.5mW is directly connected
with fibers FC/APC -> FC/PC to the Avantes
optical spectrum analyzer.
 Capture.PNG 
  96   Wed Feb 26 11:05:09 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum analyzer resolutionSame measurement with Koheras @100mW and
using fiber coupling lenses between Koheras
and Avantes OSA.
 Capture2.PNG 
  97   Wed Feb 26 16:48:02 2020 Ronic ChicheFixedinfolasers and opticsOptical roomOptical spectrum before and after CVBGMeasurement of the optical spectrum with
Avantes OSA before (1st picture) and after
CVBG (2nd picture) with 2nd stage on the
 OSA_after_amplifier_CFBG_and_before_CVBG.PNGOSA_after_amplifier_CFBG_2_CVBG.PNG 
  98   Fri Feb 28 09:20:37 2020 Ronic ChicheNot Fixedissuelasers and opticsOptical roomAmplifier laser diodes issueThis is a long time issue for the ThomX
amplifier : on the 4 pumping diodes available,
the 1st diode has a higher temperature than
 Problem_TEC.PNGparam_diode_1.csvparam_diode_2.csv 
  99   Fri Feb 28 17:44:12 2020 Ronic ChicheFixedreportlasers and opticsOptical roomPointing stability with CVBGYesterday, with Titouan, we made some measurements
on pointing stability of the laser beam after
amplifier and CVBG.
 Pointing_stability_without_airflow_and_no_one_walking_around.pngPointing_stability_without_airflow_vs_amplifier_current.png 
  101   Tue Jul 7 12:49:38 2020 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurement after the Edge installationAfter the Edge installation inside the
cavity, the Finesse has been measured several
times by modulation technique with an average
 untitled.png 
  106   Thu Nov 4 13:05:49 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentas the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again
  
  107   Thu Nov 4 18:57:16 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentThis afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection
  
  108   Fri Nov 26 20:12:10 2021 Ronic ChicheFixedreportlasers and opticsThomX iglooFP cavity alignmentA continuation of the alignment process
was done, there was change in it due to variation
in temperature, 
  
ELOG V3.1.4-395e101