350
|
Tue Aug 27 11:33:24 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | we had to move the laser cavity motor to
find the resonances and change a lot the
CEP. |
|
|
351
|
Tue Aug 27 12:31:19 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with |
|
|
352
|
Fri Aug 30 10:50:45 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C |
|
|
353
|
Fri Aug 30 12:05:38 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | After the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization |
|
|
354
|
Fri Aug 30 17:59:01 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | amplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier |
|
|
355
|
Thu Sep 5 09:51:22 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | the CVBG of the compressor module seems
to have an issue.
here is the plan of the work : |
|
|
356
|
Thu Sep 5 09:53:10 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | 1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio. |
12x |
|
357
|
Fri Sep 6 11:56:53 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | this morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we |
|
|
358
|
Fri Sep 6 12:10:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after redoing the alignment of the CVBG,
we got back the initial power in the FPC
(87kW) |
|
|
359
|
Fri Sep 6 15:20:20 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | now, the Ring RF frequency is set to 500.067MHz.
so the CFP/laser frequency should
be 500.067MHz/15 = 33.3378MHz. |
|
|
360
|
Fri Sep 6 17:21:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | I changed a little bit the locking parameters
(see picture) for the RF/FPC loop and it
locked rapidely. |
|
|
362
|
Mon Sep 9 11:00:43 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning, with Vincent :
- we added the 10Hz trigger to
the CH2 on the remote scope (192.168.229.21) |
|
|
363
|
Mon Sep 16 12:03:30 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning, I try
to find a new region for MOT.03 and MOT.06
where we can move them without unlocking |
|
|
364
|
Tue Sep 17 12:48:13 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning with Daniele, we did a quite
long run with this motor position and it
seems we don't lose the lock too much. |
|
|
370
|
Mon Oct 14 10:21:17 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | On Friday 11th of October, due to the Yvette
flooding, all the AC power of ThomX have
been shut down. |
|
|
371
|
Tue Oct 15 09:33:15 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | This morning, I verified the reason why
the seeder frequency was not displayed on
the amplifier software screen: |
|
|
372
|
Mon Oct 21 09:20:47 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | After the new Yvette flooding of the last
week and the consecutive AC-shut down, I
restarted this morning the laser with the |
|
|
373
|
Tue Oct 22 18:52:40 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Onefive 33MHz modelock loss | For the modulation/demodulation generator
for the PDH signal,
after a power shutdown, on can : |
|
|
378
|
Wed Nov 20 11:28:01 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | this morning, with Daniele, we checked
the amplifier power, right after the CVBG
(the power meter has to be placed on a metal |
|
|
379
|
Wed Nov 20 12:00:47 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | ThomX igloo | Checking the amplifier power | we did a long term run (25 mn) with the
powermeter located at the FPC position at
33% amplifier ratio. |
|