408
Wed Feb 19 09:28:12 2025
Ronic Chiche
Under Process
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
correlations between accelerometer and lock losses @ 20Hz
long term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator)
409
Wed Feb 19 10:35:06 2025
Ronic Chiche
Under Process
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
correlations between accelerometer and lock losses @ 20Hz
I installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition
411
Fri Feb 21 10:13:03 2025
Ronic Chiche
Under Process
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
correlations between accelerometer and lock losses @ 20Hz
for this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ?
417
Tue Mar 18 11:25:07 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
this morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio.
419
Mon Mar 31 17:12:56 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
today, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)... insead of the 00
421
Tue Apr 29 09:26:08 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
today, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations
422
Fri May 2 10:05:43 2025
Ronic Chiche
Under Process
report
lasers and optics
ThomX igloo
air conditionning in ThomX Bunker
The temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day.
423
Tue May 6 09:29:43 2025
Ronic Chiche
Under Process
report
lasers and optics
ThomX igloo
air conditionning in ThomX Bunker
after the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C
424
Tue May 6 10:58:18 2025
Ronic Chiche
Under Process
report
lasers and optics
ThomX igloo
air conditionning in ThomX Bunker
I finally got 93-94kW for 33% amp ratio.
I had to move the FP-cavity length
to compensate the temperature change in the
425
Wed May 14 09:50:52 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
Today, I removed the NKT oscillator from
the bunker to put it in the PLIC room.
I locked the FP cavity and obtained
427
Wed Jun 11 18:59:34 2025
Ronic Chiche
Under Process
issue
mechanics | lasers and optics | vacuum | detectors and electronics
ThomX igloo
Possible causes for the noise in the FP-cavity system
list of possible causes of the high frequency
noise which makes the system loosing the
lock => to be checked.
429
Wed Jun 25 09:57:56 2025
Ronic Chiche
Under Process
issue
mechanics | lasers and optics | vacuum | detectors and electronics
ThomX igloo
Possible causes for the noise in the FP-cavity system
4.3 - Vibrations of the mirror mounts due
to temperature related to cavity power (the
electrons machine is OFF)
430
Wed Jun 25 18:48:28 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
New locking parameters (I got 98kW for
33% amp ratio) :
Axis 18 position : +0009420
433
Tue Jul 1 17:31:41 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
We had a long run without any lock loss
during ~1h with the 23kW recipie in the morning.
during the afternoon, we had some
434
Tue Jul 8 18:45:17 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
long run yesterday at relatively low power
(~23kW) with double loop (FPC + RF) between
10am and 6pm
435
Tue Jul 8 18:48:51 2025
Ronic Chiche
Under Process
report
mechanics | lasers and optics | detectors and electronics
ThomX igloo
day by day run for X-ray production
long run today at relatively
nominal power (~90kW) with double loop
(FPC + RF) between 13:30am and 6:30pm
444
Tue Jul 15 17:34:13 2025
Ronic Chiche
Under Process
info
lasers and optics
ThomX igloo
Stability test Without and with
The laser starts at 93 KW.
This morning I operated the laser
locked with the RF for 1h30 without any delock.
445
Wed Jul 16 17:17:57 2025
Ronic Chiche
Under Process
info
lasers and optics
ThomX igloo
Suite tests stabilité
We continue to find what gives high freq.
perturbation.
The laser starts at 92 KW it is
446
Fri Jul 18 09:23:40 2025
Ronic Chiche
Under Process
info
lasers and optics
ThomX igloo
Xrays experiment with prostate
Today we do XRays for experiment.
The laser start to 33% at 93 KW
but Pgain = 0.033
447
Fri Jul 18 15:56:40 2025
Ronic Chiche
Under Process
info
lasers and optics
ThomX igloo
laser operation again with machine OFF
The laser start at 33% with 92 KW optimized
and
P=0.03