  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  391   Wed Jan 8 12:24:48 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThe goal of these measurements is to check
if one can find some correlation between
the CFP lock losses observed during a run
 Without_Noise_@_20Hz.pngWith_Noise_@_20Hz.pngDelock_@_20Hz.pngVoice_noise_@400Hz.png 
  392   Wed Jan 8 16:08:59 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThis afternoon, we started almost all the
parts of the machine with Vincent and Nicolas,
and we didn't see any change in the Loop
  
  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  396   Fri Feb 7 15:35:37 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed an accelerometer setup in the
bunker.
presently, the accelerometer is placed
 Capture1.JPGCapture.JPG 
  397   Tue Feb 11 10:55:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hztoday I connected a copy of the laser PZT
signal to the 2nd scope CH2 (with AC coupling
to remove the DC offset) to be able to monitor
  
  398   Fri Feb 14 10:11:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some measurement with
nobody interfering with the tests.

- the "no noise" image
 No_noise.JPGSlaping_door.JPGNoise1.JPGNoise2.JPGNoise3.JPG 
  399   Fri Feb 14 10:58:48 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthen, I moved the accelerometer on top
of the "X-hutch side" vessel, placed
directly on the metal top case, inside the
 8x 
  400   Fri Feb 14 19:08:09 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzat the end of the day, I moved the accelerometer
from the top of the cavity vessel to the
top case of the Onefive laser.
  
  401   Mon Feb 17 09:52:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some new plots with
the accelerometer placed on the top of the
case of the OneFive laser.
 6x 
  402   Mon Feb 17 10:48:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hznew plots, with the accelerometer placed
directly on the optical cavity table (on
the marble part), close to the oscillator.
 7x 
  404   Mon Feb 17 17:37:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzone possible source for this acoustic noise
was the vibrations coming from the water
cooling of the dipoles which is normally
  
  405   Tue Feb 18 10:40:55 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the pk-pk measurement of the accelerometer
during the whole night.
the recording started at 5pm yesterday
 Capture.JPG 
  406   Tue Feb 18 17:36:25 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the acquisition from 10:30am to
5:30pm

11k point in 7h => 1.57k points
 Capture.JPG 
  407   Tue Feb 18 19:33:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW.