Status of commissioning, report also here plots are reports., Page 20 of 24
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
461 Entries
Goto page
Previous
1
,
2
,
3
...
19
, 20,
21
,
22
,
23
,
24
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
83
Tue Nov 26 16:21:27 2019
Loïc Amoudry
Fixed
issue
vacuum
Optical room
Pneumatic valves
The pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
82
Tue Nov 26 16:11:52 2019
Ronic Chiche
Fixed
issue
mechanics
Optical room
First Lock with 2nd satge of amplifier : Motor issue ?
The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
81
Fri Nov 22 17:56:56 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
30Hz noise issue
since some days, we observe the cavity
is difficult to lock and a strange 30Hz noise
has appeared on the PZT signal which normally
80
Thu Nov 21 11:37:13 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive Origami 33MHz specs
Beam Size Onefive added
79
Wed Nov 13 15:05:18 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
78
Wed Nov 13 14:44:56 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
77
Wed Nov 6 16:11:12 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Spherical mirrors at closest position. FSR, finesse and beam size.
The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
76
Tue Oct 22 09:10:45 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
First mode degeneracy on ThomX
Yesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope
75
Fri Oct 11 18:49:00 2019
Ronic Chiche
Fixed
info
detectors and electronics
Optical room
New locking scheme
Before, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
74
Fri Oct 11 18:42:32 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
First Lock with 2nd satge of amplifier : Finesse issue ?
First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
73
Thu Oct 10 18:03:10 2019
Ronic Chiche
Fixed
issue
mechanics
Optical room
First Lock with 2nd satge of amplifier : Motor issue ?
Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
72
Thu Oct 10 17:51:26 2019
Ronic Chiche
Fixed
issue
lasers and optics | detectors and electronics
Optical room
First Lock with 2nd satge of amplifier : Finesse issue ?
1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
71
Wed Oct 9 11:41:11 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive spectrum and CVBG spectrum
The Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli
70
Wed Oct 9 10:16:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Fiber injection and onefive output power
Fiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in
69
Wed Oct 9 10:10:01 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Free Spectral Range (FSR)
FSR is 33.347 MHz @1e-8 mbar
68
Wed Oct 9 10:08:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Improvement holder amplifier fiber
We've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left).
67
Thu Oct 3 18:00:10 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
ThomX amplifier M2
The ThomX M2 has been measured between
1.5-1.6 for x and y
66
Thu Oct 3 14:00:13 2019
Loïc Amoudry
Fixed
issue
cabling
Optical room
Electrical trouble (disjunction)
The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the
65
Thu Oct 3 13:53:44 2019
Loïc Amoudry
Fixed
report
vacuum
Optical room
Cavity under vacuum
The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are
64
Thu Oct 3 13:49:58 2019
Loïc Amoudry
Fixed
info
mechanics
Optical room
Pneumatic valves
Frederic and Manu from vacuum group came
this morning to fix again the pneumatic valves
which had a leak again.