  Status of commissioning, report also here plots are reports., Page 17 of 24  Not logged in ELOG logo
ID Date Author Status Type Categorydown Location Title Text Attachments
  103   Fri Nov 6 14:23:16 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomBeam size and finesseMeasurement behind P4 (planar mirror)




  
  104   Fri Dec 18 16:10:04 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomOnefive ouput power and spectrumAfter turning on, one can see the 133.33MHz
Onefive output power for ~40min with OD2
filter (~/20). So the real output power is
 33MHz_output_power.PNG133_spectrum_full.PNG133_spectrum.PNG133_spectrum2.PNG 
  105   Fri Dec 18 17:06:53 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomOnefive ouput power and spectrum1)  Note: The OneFive laser used for
experimenting is the one for the  SBox

but, for now only this laser arrived
  
  106   Thu Nov 4 13:05:49 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentas the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again
  
  107   Thu Nov 4 18:57:16 2021 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity alignmentThis afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection
  
  108   Fri Nov 26 20:12:10 2021 Ronic ChicheFixedreportlasers and opticsThomX iglooFP cavity alignmentA continuation of the alignment process
was done, there was change in it due to variation
in temperature, 
  
  109   Thu Dec 2 21:31:21 2021 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Note the direction of injection is  
  M1 - M2 - M3 - M4

                                                      
 2021_12_02_M2_Transmission.jpg2021_12_02_M3_transmission_90deg.PNG 
  110   Tue Jan 11 10:36:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment The alignment is on hold until next week
17th - 18th  Jan

an Alignment attempt will be done
  
  113   Mon Jan 17 21:22:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment ***** Continuation of the alignment ----
FP Cavity Open --- ****

The cavity was put under outer
 Interior_of_cavity_P1_S3_windowOpen.jpgInterior_of_cavity_P1_S3_windowOpen_irrisOnP1.jpgCavityAlignment_cavityOpen_S2_Output.jpgCavityAlignment_cavityOpen_S3_Output.jpeg 
  114   Wed Jan 19 09:36:53 2022 Manar AmerFixedreportlasers and opticsThomX iglooFP cavity alignment Yesterday, we did the alignment again using
Iris and beam profilers to obtain a more
precise result.
  
  128   Fri Mar 11 12:46:58 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFP cavity mode axis change and Finesse measurementthis morning with Manar, we did a cavity
mode axis change.

we checked the cavity mode centroid
  
  129   Fri Mar 11 12:59:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooCavity beam Image Updated beam image after change on the
mode axis.

Taken after P4.
 Capture.PNGCapture2.PNG 
  130   Fri Mar 11 17:33:33 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAurélien, Manar, and I spent more
than 2h trying to start the software communicating
with the Alphanov amplifier controller.
  
  131   Fri Mar 11 17:58:24 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAdditional information related to the injected
power into the amplifier fibers.

power = 4.45 mW (as shown from
  
  133   Fri Mar 18 11:48:14 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementThis morning, with Manar and Aurélien,
we measure the power directly at
the output of the Alphanov amplifier with
 power_after_compressor_vs_current_for_133MHz_laser.png 
  134   Fri Mar 18 15:04:30 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooAlphanov amplifier power measurementanswers from Guillaume:

- the chiller temperature has to
be set to 25°C
  
  135   Tue Mar 22 21:19:48 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday: Manar, Ronic and Aurlien started
the study of the beam profile of the alphanov
amplifier at high power.
 8x 
  136   Tue Mar 22 21:20:28 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Profile 




  
  137   Wed Mar 23 13:55:11 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileAdding the fitted beam in 1D in Horizontal
and vertical axis.

for 10%   to  60%
 6x 
  138   Fri Apr 1 23:59:51 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileToday a second reading of the beam profile
was done , with Victor ,Ronic, Aurlien and
Manar
  