  Status of commissioning, report also here plots are reports., Page 14 of 24  Not logged in ELOG logo
ID Date Author Status Type Category Location Titledown Text Attachments
  131   Fri Mar 11 17:58:24 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareAdditional information related to the injected
power into the amplifier fibers.

power = 4.45 mW (as shown from
  
  143   Fri Apr 8 13:15:18 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst hands on the Alphanov amplifier & softwareSoftware Works well and is operational.

Just closing the log series!!!

  
  225   Wed Jun 28 19:01:03 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst X rays and FP-cavity mode and electron beam waists size @ IPon friday 23/06 afternoon, after scanning
the hexapod z-axis, we observed a cut of
the power stored in the FP-cavity (with constant
 Raw_data.jpganalyse_profil_vert_X-1.pptx 
  73   Thu Oct 10 18:03:10 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? Global locking almost clean : tranmission
and reflection are quite noiseless except
the peaks at every 500ms.
 Image1.png 
  82   Tue Nov 26 16:11:52 2019 Ronic ChicheFixedissuemechanicsOptical roomFirst Lock with 2nd satge of amplifier : Motor issue ? The 500 ms noise disapeared. We had to
disable the "power save" mode of
the smaract translation stage. AND turn OFF
  
  72   Thu Oct 10 17:51:26 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?1st lock today with the second stage of
the amplifier.
~ 300mW of injected power (but which
  
  74   Fri Oct 11 18:42:32 2019 Ronic ChicheFixedissuelasers and optics | detectors and electronicsOptical roomFirst Lock with 2nd satge of amplifier : Finesse issue ?First of all, we used and optical spectrometer
to determine which proportion of pump and
signal is in the injected beam.
  
  30   Fri Apr 5 11:28:39 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse with P1 SUPRASILP1 SUPRASIL has been installed instead
of P1 Sapphire. It has been cleaned 3 times
on each face with wipe+isopropanol before
 190404_mode_size_with_P1_SUPRASIL.PNG190404_mode_fit_with_P1_SUPRASIL.PNGtek00000.pngtek00002.png 
  38   Thu May 23 10:10:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement by decay time technique5 Files attached:

- Note on the technique and results
for the present cavity on 2019, May 21th
 2019-05-21_-_Finesse_measurement_by_decay_time_technique.docxtek0005CH1.isftek0006CH1.isfplotdata.mmyerror.m 
  101   Tue Jul 7 12:49:38 2020 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurement after the Edge installationAfter the Edge installation inside the
cavity, the Finesse has been measured several
times by modulation technique with an average
 untitled.png 
  50   Fri Aug 30 09:44:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterLast Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)

28th and 29th of august, we cleanned,
  
  51   Fri Aug 30 17:46:15 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coatertoday I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50%
  
  54   Tue Sep 3 18:04:03 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterFollowing finesse measurements (start @10700): 
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000
  
  100   Tue Jun 16 13:03:52 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse measurement after confinementAfter 3 months without human presence,
finesse has been measured 3 times with
average optimization: 
 sweep_parameters.PNGtek00007.pngtek0009CH1.isftek0010CH1.isftek0011CH1.isf 
  61   Fri Sep 27 16:17:36 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementAfter mirrors were going back from LMA
for cleaning and thermal anealing, they have
been installed in FP cavity for Finesse measurement.
  
  63   Mon Sep 30 11:30:32 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementTo complete these observations:

Finesse has been measured
on thursday, right after cleaning the cavity
  
  25   Tue Apr 2 17:59:18 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after removing wires19/04/01: We removed the wires from the
beam path in the cavity. Finesse stayed at
3400. FSR: 33.342 MHz.
  
  37   Tue May 21 17:49:30 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after cleaning (new suprasil mirror)15/05/19-20/05/19:

Cleaning of the mirrors:

Initial finesse 14000 @air
  
  31   Mon Apr 8 10:18:31 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomFinesse after 2daysFinesse measured this morning after P1
SUPRASIL being into the cavity for two
days. In order to check if it's getting
  
  363   Mon Sep 16 12:03:30 2024 Ronic ChicheFixedinfomechanicsThomX iglooFinding correct motors position and parameters to keep the lock during a movethis morning, I try
to find a new region for MOT.03 and MOT.06
where we can move them without unlocking
  