  374   Tue Oct 22 18:58:56 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionToday, after setting the locking parameters,
I got 80kW in the FPC for 33% amplifier ratio
after CEP tuning (Smaract CH2 ~ -423.5µm)
  
  375   Wed Oct 23 12:23:10 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthis morning, I did some walking procedure
and I got 82kW in the FPC with 33% amplifier
ratio (after CEP optimization too).
  
  376   Fri Nov 8 15:23:11 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthis morning, I did some walking procedure
and CEP alignment to get ~80kW in the FPC
with 33% amplifier ratio.
  
  377   Tue Nov 19 17:37:55 2024 Ronic ChicheUnder Processinfolasers and optics | softwareThomX iglooOptimizing lock parameters for stable X-ray productionthe RF frequency is now 500.1003MHz which
is equivalent (if divided by 15) to 33.34002MHz.

the frequency has to be changed
  
  378   Wed Nov 20 11:28:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis morning, with Daniele, we checked
the amplifier power, right after the CVBG
(the power meter has to be placed on a metal
  
  379   Wed Nov 20 12:00:47 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerwe did a long term run (25 mn) with the
powermeter located at the FPC position at
33% amplifier ratio.
  
  380   Wed Nov 20 12:42:11 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerI put back and aligned the 1/2 waveplate
only and I get 71kW max after its optimization
and optimizing the CEP and alignment (without
  
  381   Wed Nov 20 18:55:37 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis afternoon, we put back the 1/4 and
1/2 waveplates and after a long alignment/angle
tuning/CEP optimization process, we hardly
  
  382   Fri Nov 22 10:23:33 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthe RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz
  
  383   Tue Nov 26 18:00:14 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionat the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP
 Capture.JPG 
  384   Wed Dec 4 12:26:03 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction
  
  385   Wed Dec 4 17:11:50 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionwe observed that :

- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected
 20241204_125955.jpg 
  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  391   Wed Jan 8 12:24:48 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThe goal of these measurements is to check
if one can find some correlation between
the CFP lock losses observed during a run
 Without_Noise_@_20Hz.pngWith_Noise_@_20Hz.pngDelock_@_20Hz.pngVoice_noise_@400Hz.png 
  392   Wed Jan 8 16:08:59 2025 Ronic ChicheUnder Processinfolasers and optics | detectors and electronics | cablingThomX iglooCEM noise measurementsThis afternoon, we started almost all the
parts of the machine with Vincent and Nicolas,
and we didn't see any change in the Loop
  
  393   Wed Jan 22 15:32:53 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuumThomX igloocorrelations between vacuum gauges and lock losses @ 20Hzthe machine people saw a correlation between
BPM jumps and vacuum gauges peaks related
to breakdowns in the beam pipe.
  