  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  396   Fri Feb 7 15:35:37 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed an accelerometer setup in the
bunker.
presently, the accelerometer is placed
 Capture1.JPGCapture.JPG 
  397   Tue Feb 11 10:55:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hztoday I connected a copy of the laser PZT
signal to the 2nd scope CH2 (with AC coupling
to remove the DC offset) to be able to monitor
  
  398   Fri Feb 14 10:11:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some measurement with
nobody interfering with the tests.

- the "no noise" image
 No_noise.JPGSlaping_door.JPGNoise1.JPGNoise2.JPGNoise3.JPG 
  399   Fri Feb 14 10:58:48 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthen, I moved the accelerometer on top
of the "X-hutch side" vessel, placed
directly on the metal top case, inside the
 8x 
  400   Fri Feb 14 19:08:09 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzat the end of the day, I moved the accelerometer
from the top of the cavity vessel to the
top case of the Onefive laser.
  
  401   Mon Feb 17 09:52:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some new plots with
the accelerometer placed on the top of the
case of the OneFive laser.
 6x 
  402   Mon Feb 17 10:48:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hznew plots, with the accelerometer placed
directly on the optical cavity table (on
the marble part), close to the oscillator.
 7x 
  403   Mon Feb 17 12:12:02 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able to store more than
93kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1.jpg 
  404   Mon Feb 17 17:37:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzone possible source for this acoustic noise
was the vibrations coming from the water
cooling of the dipoles which is normally
  
  405   Tue Feb 18 10:40:55 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the pk-pk measurement of the accelerometer
during the whole night.
the recording started at 5pm yesterday
 Capture.JPG 
  406   Tue Feb 18 17:36:25 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the acquisition from 10:30am to
5:30pm

11k point in 7h => 1.57k points
 Capture.JPG 
  407   Tue Feb 18 19:33:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW.
 Capture.JPG 
  408   Wed Feb 19 09:28:12 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzlong term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator)
 Capture.JPG 
  409   Wed Feb 19 10:35:06 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition
 img1.jpgCapture.JPGCapture.JPGCapture.JPG 
  410   Thu Feb 20 12:36:19 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 94kW in the FP cavity,
always with the same parameter : 33% laser
 img1.jpg 
  411   Fri Feb 21 10:13:03 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzfor this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ?
  
  412   Fri Feb 21 19:40:50 2025 Ronic ChicheFixedissuesoftwareThomX igloostrange drift (new effect !?!)today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz),
  
  413   Fri Feb 21 19:52:57 2025 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareThomX iglooGood Xrays production trendthis afternoon, we succeeded to get a quite
long Xray production trend around 15-20 minutes
with a flux above 25k on i1.
 img1(1).jpg 