  233   Wed Aug 2 13:13:52 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the Laselockpresently, the voltage on the laser PZT
is 0-10V, but during the several runs we
did, this voltage is too low to compensate
  
  234   Tue Sep 5 17:59:24 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the LaselockYesterday, I checked the 2 output HV channels
of the LaseLock : they work properly but
the noise is bigger than the low voltage
  
  248   Wed Sep 13 17:57:08 2023 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloowork with HV voltage on the LaselockThis afternoon, I connected the HV output
of the Laselock (instead of the standard
0-10V output) to the FP-cavity PZT to increase
  
  5   Wed Oct 3 11:28:46 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mmAprès avoir utilisé la chaine
: driver ISP - cable ISP DB9 - Feedthrough
enceinte DB9-DB9 - cable perlé DB9-SUB-C
  
  6   Fri Oct 5 10:17:30 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mm 




  
  3   Tue Oct 2 16:23:54 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9,
  
  4   Tue Oct 2 18:00:36 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP  




 CABLAGE_VERINS.pdf 
  43   Tue Jun 18 20:44:34 2019 Huan WangFixedinfolasers and opticsOptical roomtelescope for Koherastelescope of Koheras is removed, information
record here:

- distance between collimator edge
 2019.06.18_telescope_of_Koheras.jpg 
  412   Fri Feb 21 19:40:50 2025 Ronic ChicheFixedissuesoftwareThomX igloostrange drift (new effect !?!)today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz),
  
  274   Wed Nov 8 18:52:44 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloosome changes in the feedback schemefrom several weeks, the maximum power stored
in the FP-cavity was ~ 5kW.

today with Daniele, we finished
 Capture.PNG20231108_154711.jpg 
  348   Tue Aug 27 09:59:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuetemperature in the casemate ~ 19.5°C
stable

this morning, I measured the power
 Capture.JPGCapture2.JPG 
  349   Tue Aug 27 10:19:08 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI refilled the chiller and the stabilized
temperature is @ 25°C

we started the 3rd stage of the
 Capture.JPG 
  350   Tue Aug 27 11:33:24 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuewe had to move the laser cavity motor to
find the resonances and change a lot the
CEP.
 Sans_titre.png 
  351   Tue Aug 27 12:31:19 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueafter doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with
 Capture.JPG 
  352   Fri Aug 30 10:50:45 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuethis morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C
  
  353   Fri Aug 30 12:05:38 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueAfter the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization
  
  354   Fri Aug 30 17:59:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueamplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier
  
  358   Fri Sep 6 12:10:51 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueafter redoing the alignment of the CVBG,
we got back the initial power in the FPC
(87kW)
  
  359   Fri Sep 6 15:20:20 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issuenow, the Ring RF frequency is set to 500.067MHz.

so the CFP/laser frequency should
be 500.067MHz/15 = 33.3378MHz.
  
  360   Fri Sep 6 17:21:51 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloorestarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issueI changed a little bit the locking parameters
(see picture) for the RF/FPC loop and it
locked rapidely.
 20240906_161926.jpg 