  217   Mon Apr 15 18:19:40 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement of 2-mirror cavity- Today Daniele and I cleaned the spherical
mirror by wiping it with alcohol,
and the finesse increased to 47k
 finesse_45k.png 
  214   Wed Apr 10 11:35:54 2024 Xinyi LuFixedinfolasers and opticsOptical roomFinesse measurement (35k)These days, Ronic, Aurélien
and I use OEwaves CW laser to measure the
finesse of SBOX. We made 5 measurements
 5_measurements_of_finesse.pngfit.png 
  242   Thu Sep 4 17:52:03 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurementToday, with Ronic, we measured the finesse
of the 2-mirror cavity witht the NKT CW laser.

We were able to perfrom the measurement
 Figure_3.png 
  243   Thu Sep 4 17:56:50 2025 Alice RenauxUnder Processreportlasers and opticsOptical roomFinesse measurement(Finesse 2651 is consistent with that obtained
from the mirrors' transmission coefficients,
which is about 3100.)
  
  218   Tue Apr 16 18:38:04 2024 Xinyi LuFixedinfolasers and opticsOptical roomFiber injection, spectrum and connection of 2nd stage amplifierToday, Daniele and I injected the laser
into the fiber, installed the telescope,
connected the second stage of the amplifier,
 CVBG_inject_to_fiber.pngtelescope.png 
  111   Tue Jul 12 10:07:05 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz
 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg 
  112   Tue Jul 12 10:19:30 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked 

changed FSR to be 216.662 MHz and
 Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png 
  113   Tue Jul 12 14:41:55 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements a Finesse of 30k with the present mirrors
:

T1=120 ppm ;A1=(2.6+1) ppm;
  
  32   Tue Dec 10 09:36:56 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFSR and Finesse measurementYesterday the cavity has been aligned and
locked with the CW Koheras laser.

the FSR has been measured by modulation
 untitled.png 
  181   Tue Jan 16 18:42:42 2024 Xinyi LuFixedinfolasers and opticsOptical roomFSR and Finesse measurement- Today, Ronic and I measured the finesse
and FSR after optimizing the locking. FSR
was adjusted to 160.27 MHz to match the pulsed
 Screenshot_2024-01-16_2_145546.pngScreenshot_2024-01-16_4_150258.png 
  67   Wed Mar 23 18:11:22 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxAn Initial cleaning of the KBoX outside
was done, All the optics and mechanics placed
that were on the table were removed.
 Log_Top_window.jpgLog_Reflection_window.jpgLog_Injection_Side_window.jpgLog_Injection_side_window2.jpg 
  68   Wed Mar 23 18:17:45 2022 Manar AmerFixedreportutilitiesOptical roomDust Cleaning of SBoxThe cleaning was done twice with half an
hour interval between the two times
reading on the dust meter was taken
  
  71   Wed Mar 30 18:53:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxThe inside of the cavity was cleaned today.
It was very dirty and had big dust particles
and fibers inside.
 6x 
  72   Thu Mar 31 13:29:01 2022 Manar AmerFixedreportmechanics | lasers and optics | utilitiesOptical roomDust Cleaning of SBoxAfter an overnight where the cavity box
was left open, a measurement of the Dust
meter was taken:
 20220331_Dust_Meter_Outside_cavity_Av10min.jpg20220331_Dust_Meter_Inside_cavity_Av10min.jpg 
  103   Wed Jul 6 18:37:02 2022 Manar AmerFixedreportlasers and opticsOptical roomDivergence of the CW beam after collimator Closing the series of the telescope for
the beam @ 133.33 MHz

 
  
  212   Mon Apr 8 08:34:54 2024 Xinyi LuFixedinfolasers and opticsOptical roomDifferent cavity modes & Pulse width- Last week, we obtained three curves of
the variation of different cavity modes with
power (Fig. 1). By comparing the gain for
 cavitymode_vs_power_f.pngdifferent_cavity_mode_data.xlsx 
  213   Tue Apr 9 08:57:22 2024 Xinyi LuFixedinfolasers and opticsOptical roomDifferent cavity modes & Pulse widthAdditional information:

The pulse duration has been performed
in RF on a UPD-70-IR2-P photodiode from Alphalas
 t_cvbg.pngt_amp.png 
  25   Thu Jan 24 17:44:21 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomDeposit on S-box mirrors after return from LMACleaning on dirty surface shows something
is deposited on the surface. Cleaning displaces
and removes part of the deposit.
 28_M2ReflectiveBeforeCleaning_compressed.jpg29_M2ReflectiveAfter1stCleanPaper_compressed.jpg 
  237   Fri Jun 13 20:10:00 2025 Alice RenauxFixedreportlasers and opticsOptical roomDamaged mirrors testToday with Dorian we tested three mirrors
with which we previously haven't been
able to obtain any resonance or optical beating
  
  160   Mon Sep 12 18:49:42 2022 Manar AmerFixedissuelasers and opticsOptical roomDamage on mirror surface Following the storage of ~ 50 kW inside
the cavity and a sudden drop in transmitted
power from the cavity 
 image001.jpgimage002.jpgimage004.jpg 