HOME
SBOX
THOMX
MINICAV
Utilities
SBOX orders
SBOX installation
SBOX commissioning
SBOX control command
Status of commissioning, report also here plots are reports., Page 13 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
11
,
12
, 13
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
207
Fri Mar 29 16:23:34 2024
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
100W CELIA laser amplifier "Power vs Pump current" curve
We measured again the 100W CELIA laser
amplifier with a pump current until 8A.
as the first current pump of the
124
Wed Aug 10 12:51:16 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
125
Thu Aug 11 12:11:48 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage.
128
Fri Aug 12 17:48:28 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
this afternoon, with Fabian, we did some
measurements on the 3rd stage.
finally we