  207   Fri Mar 29 16:23:34 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical room100W CELIA laser amplifier "Power vs Pump current" curveWe measured again the 100W CELIA laser
amplifier with a pump current until 8A.

as the first current pump of the
 CELIA_100W_amplifier_Power_vs_Current.png 
  124   Wed Aug 10 12:51:16 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningThe "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
  
  125   Thu Aug 11 12:11:48 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningBeam size at the amplifier output:

to make this measurement, I switched
ON only 1st and 2nd stage.
 Capture.PNGCapture2.PNG 
  128   Fri Aug 12 17:48:28 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningthis afternoon, with Fabian, we did some
measurements on the 3rd stage.

finally we
  