  235   Wed May 28 10:55:15 2025 Alice RenauxUnder Processreportlasers and opticsOptical room2-mirror cavity alignmentThe NKT laser PZT sensitivity is ~0.09pm/V
of wavelength variation, which is equivalent
to ~ 25MHz/V
 Sans_titre.jpg 
  219   Thu Apr 25 22:12:25 2024 Xinyi LuFixedinfolasers and opticsOptical room2 mirror cavity high power experimentsToday, Ronic and I recorded some intracavity
power and cavity mode size as shown in Fig.
1.
 record_20240425.pngScreenshot_2024-04-25_4_155354-155kw.pngScreenshot_2024-04-25_1_154630-155kw.png60kW_highordermode2.jpg 
  106   Wed Jul 6 19:57:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzThe SBox cavity setup was changed to have
only 2 mirrors M1 plane and M2 spherical,
both from ThomX
 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg 
  109   Fri Jul 8 17:48:48 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzThe cavity was realigned using irises instead
of pinholes, gave a better alignment.

The inside of the box, the spherical
 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG 
  110   Fri Jul 8 19:37:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzUpdate for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar

and the alignment and coupling
 Screenshot_2022-07-08_2_182405.png 
  138   Wed Aug 24 10:45:24 2022 Manar AmerFixedreportlasers and opticsOptical room2 Mirror Setup @ 216.6 MHzAdding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
 manip2miroirs.pptx2mirror_plan_shperical_beam_size.png 
  195   Wed Feb 28 17:26:46 2024 Ronic ChicheFixedinfolasers and optics | softwareOptical room100W CELIA laser amplifier "how's to" document1st version of the document.
if some information is not correct
or missing, give any comment by replying
 How_to_start_the_Amplifier_v1.pdf 
  207   Fri Mar 29 16:23:34 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical room100W CELIA laser amplifier "Power vs Pump current" curveWe measured again the 100W CELIA laser
amplifier with a pump current until 8A.

as the first current pump of the
 CELIA_100W_amplifier_Power_vs_Current.png 
  124   Wed Aug 10 12:51:16 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningThe "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
  
  125   Thu Aug 11 12:11:48 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningBeam size at the amplifier output:

to make this measurement, I switched
ON only 1st and 2nd stage.
 Capture.PNGCapture2.PNG 
  128   Fri Aug 12 17:48:28 2022 Ronic ChicheFixedreportlasers and opticsOptical room"ThomX" CELIA Amplifier commissionningthis afternoon, with Fabian, we did some
measurements on the 3rd stage.

finally we
  