Text
114
Tue Jul 12 18:53:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
To prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
115
Tue Jul 12 19:07:50 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation
The amplifier was installed on the optical
table next to SBox table.
The CVBG that will be used for
116
Fri Jul 22 17:07:32 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Amplifier placed next to the pulsed laser
on the table under the airflow
The output is in free space with
117
Fri Jul 22 17:10:06 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
The D-shaped mirrors are installed properly
and not cutting the path of the beam.
The cavity has been aligned again
118
Fri Jul 22 18:00:21 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
The current setup of the optical table
attached.
The cavity is aligned and the lock
119
Fri Jul 22 18:19:13 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
7x
120
Fri Jul 22 18:25:31 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
The software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.
129
Fri Aug 19 16:02:33 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Closing series
130
Fri Aug 19 16:03:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
closing series
131
Fri Aug 19 16:03:40 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
closing series
132
Fri Aug 19 16:31:11 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
In preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
133
Fri Aug 19 16:36:18 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
The previous Sbox telescope was dismantled
and the mechanical components cleaned.
its lenses are still in the mounts,
134
Mon Aug 22 18:38:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Beam divergence was measured using a method
called "Focal
135
Mon Aug 22 18:39:13 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
Beam divergence after amplifier 4.46 mrad
136
Tue Aug 23 17:37:38 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
I placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
137
Wed Aug 24 10:39:58 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Here is a view of beam propagation in the
optical software : GaussianBeam
the red filled shape is the model
138
Wed Aug 24 10:45:24 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
2 Mirror Setup @ 216.6 MHz
Adding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
141
Fri Sep 2 17:50:21 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
removing the reading which is not correct
(wrong use of software)
redone a reading similar using
142
Fri Sep 2 18:10:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Note the
correct beam divergence is approximately
~ 2.3 mrad
143
Mon Sep 5 18:06:53 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Am adjustment on the lenses position to
have a smaller waist.
+ 250 mm @ 88 cm from amplifier