80
|
Tue Apr 26 20:08:10 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment |
Adjust the placement of
the Irises (done at the start of the |
9x |
|
81
|
Wed Apr 27 22:13:37 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later |
 |
|
83
|
Mon May 9 18:36:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.
The beating was observed with just |
 |
|
84
|
Mon May 9 19:05:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment. |
   |
|
86
|
Wed May 11 09:19:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Yesterday, to find the source of why the
mode is deformed, I tried to rotate the mirrors
to see if there is a change. |
|
|
88
|
Wed May 11 21:10:27 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | M2 Sbox changed to spare. Alignment of
M2 was redone.
With the help of Ronic , We observe |
  |
|
90
|
Tue May 24 22:05:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | The external and internal alignment was
redone.
External Alignment : the collimator |
7x |
|
91
|
Tue May 24 22:11:40 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | The current setup for the SBox has a beam
viewer and 2 photodiodes placed at reflection
and transmission. |
  |
|
92
|
Wed May 25 17:34:29 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Adding images from the transmission after
the spherical mirrors M3 and M4 window for
a resonating mode inside the cavity. |
 |
|
93
|
Wed Jun 8 10:47:45 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Closing Series for Alignment.
Beating observed, beam is in the
locking stages |
|
|
94
|
Wed Jun 8 10:58:15 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Images of the Transmitted beam at M2 mirror
at different days.
The first one was from last week, |
 |
|
96
|
Wed Jun 8 11:24:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Telescope - Spacial Matching | Divergence of the CW beam out of the collimator
measured after 1 meter to be
2 |
|
|
102
|
Wed Jul 6 18:35:38 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Fundamental Mode TEM00 | Closing series of 00 mode for FSR @ 133.33
MHz
|
|
|
103
|
Wed Jul 6 18:37:02 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Divergence of the CW beam after collimator | Closing the series of the telescope for
the beam @ 133.33 MHz
|
|
|
107
|
Fri Jul 8 17:09:26 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Images of ThomX mirrors | Under the microscope,
the spherical mirrors show the
deposit of metal dots on the reflecting surface |
  |
|
108
|
Fri Jul 8 17:10:44 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Images of ThomX mirrors | Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors |
|
|
123
|
Mon Aug 8 17:58:32 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Pulse duration measurement before and after CVBG (as a strecher) | I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the |
  |
|
124
|
Wed Aug 10 12:51:16 2022 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | "ThomX" CELIA Amplifier commissionning | The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available |
|
|
125
|
Thu Aug 11 12:11:48 2022 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | "ThomX" CELIA Amplifier commissionning | Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage. |
 |
|
127
|
Fri Aug 12 11:46:17 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | OEwaves lock and Finesse measurement | this morning, I locked the FP cavity with
the OEwaves CW laser and the "Fred fiber
amplifier" used at 500mA of pump current. |
|