46
|
Thu Jan 9 16:54:05 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Microscope and cleaning of SBOX mirrors | The mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then |
|
|
47
|
Fri Jan 10 18:51:23 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | the 10th of January, we increased the power
of the amplifier to study the cavity transmitted
and reflected power signals. |
6x |
|
48
|
Fri Jan 24 16:16:24 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | A chart which summarizes
the data we have or we can estimate.
|
 |
|
49
|
Fri Jan 24 17:52:14 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | AFM analysis of M1 | AFM has been proceeded on M1 and M2.
The pdf shows the first images
taken with the PLIC room Leica microscope |
|
|
50
|
Fri Jan 24 17:56:11 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | AFM analysis of M2 | We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror. |
|
|
51
|
Fri Jan 24 17:58:45 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | CFBG removed from ThomX CELIA amplifier | The CFBG has been removed successfully
and the amplifier is closed now.
The soldering machine had a calibration |
|
|
52
|
Wed Jan 29 19:00:02 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Glow discharge cleaner on SBOX mirrors | The glow discharge cleaner has been tested
on the SBOX mirrors.
I've put them 1 by 1. Each |
|
|
53
|
Wed Jan 29 19:04:38 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before. |
|
|
54
|
Wed Feb 5 14:47:16 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Yesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with |
|
|
55
|
Wed Feb 5 16:46:01 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique. |
|
|
56
|
Thu Feb 6 11:01:08 2020 |
Ronic Chiche | Fixed | report | lasers and optics | Optical room | analysis of stored and reflected power | with this Finesse around 22-23k, the technique
comparing TRANSMISSION and REFLECTION signals
doesn't work, even in taking into account |
|
|
57
|
Thu Feb 6 16:58:57 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Power up to 48kW crater effect again | As we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater). |
  |
|
60
|
Wed Dec 16 12:36:37 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning and microscope imaging | On 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they |
14x |
|
61
|
Tue Jan 5 12:38:04 2021 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Transmission Measurements for the Mirrors. |
Thursday 10 December 2020:
First Test Measurement - Inside Box
The
transmission ( T ) for the mirrors of SBOX |
6x |
|
62
|
Tue Jan 12 10:44:57 2021 |
Ronic Chiche | Fixed | issue | lasers and optics | Optical room | Origami SN2440 133MHz laser power measurment... and failure | we received from NKT the Origami SN2440
133MHz oscillator from repair on 2020/12/17
and we measured the power trend from |
 |
|
63
|
Thu Jun 10 17:55:15 2021 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Origami SN2440 133MHz laser tests | Today, we received the Origami SN2440 133MHz
oscillator from repair (NKT mentioned a defective
wire inside the controller....) |
  |
|
76
|
Wed Apr 20 19:05:37 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | KBox Alignment | Starting with the alignment of the KBox
using CW Koheras.
The size of the CW output from |
7x |
|
77
|
Mon Apr 25 17:28:29 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | SBox alignment, using CW laser Koheras
power 1 mW
|
6x |
|
78
|
Mon Apr 25 17:58:01 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | After pointers and Advice from Aurélien,
improvement of the beam alignment
through M1 and M2 irises was done. |
    |
|
79
|
Mon Apr 25 18:02:09 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Remember to update the position of the
reference Irises tomorrow !!!!
|
|