HOME
SBOX
THOMX
MINICAV
Utilities
SBOX orders
SBOX installation
SBOX commissioning
SBOX control command
Status of commissioning, report also here plots are reports., Page 6 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
5
, 6,
7
...
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
129
Fri Aug 19 16:02:33 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Closing series
130
Fri Aug 19 16:03:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
closing series
131
Fri Aug 19 16:03:40 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
closing series
132
Fri Aug 19 16:31:11 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
In preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
133
Fri Aug 19 16:36:18 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
The previous Sbox telescope was dismantled
and the mechanical components cleaned.
its lenses are still in the mounts,
134
Mon Aug 22 18:38:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Beam divergence was measured using a method
called "Focal
135
Mon Aug 22 18:39:13 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
Beam divergence after amplifier 4.46 mrad
136
Tue Aug 23 17:37:38 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
I placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
137
Wed Aug 24 10:39:58 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Here is a view of beam propagation in the
optical software : GaussianBeam
the red filled shape is the model
138
Wed Aug 24 10:45:24 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
2 Mirror Setup @ 216.6 MHz
Adding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
141
Fri Sep 2 17:50:21 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
removing the reading which is not correct
(wrong use of software)
redone a reading similar using
142
Fri Sep 2 18:10:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Note the
correct beam divergence is approximately
~ 2.3 mrad
143
Mon Sep 5 18:06:53 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Am adjustment on the lenses position to
have a smaller waist.
+ 250 mm @ 88 cm from amplifier
145
Wed Sep 7 18:57:20 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
We increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or
146
Wed Sep 7 18:58:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
Today we managed to observe the fundamental
mode and stabilize the scan on it until we
improved the alignment enough.
147
Thu Sep 8 11:16:40 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
Today, we played on the CEP but using the
I-tune input of the Menhir Laser (+/- 5V
maximal range).
148
Thu Sep 8 13:39:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We played on the CEP using the USB command
"id0=xxxxx" of the Menhir.
we put id0=48650 and we improved
149
Thu Sep 8 14:58:51 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We managed to lock the cavity by adding
the AOM , but the lock is still difficult
to stabilize.
150
Thu Sep 8 18:28:51 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We wanted to increase the power of the
amplifier to measure the transmission output
at M2,
151
Fri Sep 9 11:50:17 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Locking Amplifier with Cavity
We locked the cavity, and it is stable
using the Transmission,
the high frequency that we thought
Goto page
Previous
1
,
2
,
3
...
5
, 6,
7
...
11
,
12
,
13
Next
All
ELOG V3.1.4-395e101