ID Date Author Status Typedown Category Location Title Text Attachments
  229   Fri Dec 6 16:59:57 2024 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningthis afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
  
  231   Tue Mar 4 18:33:26 2025 Ronic ChicheFixedinfoutilitiesOptical roomoptical table cleaningnow, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
  
  232   Tue Mar 4 18:51:57 2025 Ronic ChicheUnder Processinfomechanics | lasers and opticsOptical roomAlignment of a 2-mirror FP cavitytoday with Alice,

- we measured the height of the
SBOX windows center : 140mm from the optical
  
  241   Thu Sep 4 17:35:50 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsOptical roomInstallation of the avalanche photodiodeAfter installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low
  
  246   Wed Aug 5 11:25:41 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationwe have all the adaptor plugs for connecting
the chiller.
so, I tested first the chiller connected
  
  247   Wed Aug 5 12:22:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I connected the chiller circuit to
the amplifier, thanks to the adapters.

chiller IN => blue pipe =>
  
  248   Wed Aug 5 13:49:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationpipes are maybe too long ?

we can use the Darcy-Weisbach +
Blasius laws (non linear laws).
  
  249   Thu Aug 6 14:49:32 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI drained the chiller to install again
the short pipe (< 1m) in closed loop.

then, I filled again the chiller
  
  250   Thu Aug 6 15:12:49 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationnow, I installed the long pipes (2x 3m)
in closed loop (without the amplifier connected),
but the exact ones used to connect the laser,
  
  251   Fri Aug 7 10:59:52 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationI cut a small part of the black pipe on
the amplifier side (could it be slightly
deformed by a try with an other type of adapter
  
  252   Fri Aug 7 11:41:17 2026 Ronic ChicheUnder Processinfomechanics | lasers and optics | cablingOptical roomNeolase amplifier installationas soon as I connect the amplifier to the
pipes, the flow decreases to 1.7Lpm.

and the filling process is very
  