229
Fri Dec 6 16:59:57 2024
Ronic Chiche
Fixed
info
utilities
Optical room
optical table cleaning
this afternoon, we checked the dust meter
which is at 0 for 1 and 5µm dust particles
but ~ 2000-3000 for 0.3µm particles.
231
Tue Mar 4 18:33:26 2025
Ronic Chiche
Fixed
info
utilities
Optical room
optical table cleaning
now, it seems the table is clean enough
(dust meter counts 0 particles) to install
a 2 mirrors FP-cavity.
232
Tue Mar 4 18:51:57 2025
Ronic Chiche
Under Process
info
mechanics | lasers and optics
Optical room
Alignment of a 2-mirror FP cavity
today with Alice,
- we measured the height of the
SBOX windows center : 140mm from the optical
241
Thu Sep 4 17:35:50 2025
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Installation of the avalanche photodiode
After installing the 2nd EOM, we had some
trouble to be able to lock again.
One possible reason was the very low