  30   Fri Dec 6 11:53:53 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaningXPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot
 resume_M3.PNGresume_M1_M2_M4.PNG 
  69   Tue Mar 29 16:23:00 2022 Manar AmerFixedreportlasers and optics | cablingOptical roomMightylaser Amplifier Migthylaser amplifier has been moved from
the SBox table to the PLIC table.

 
  
  46   Thu Jan 9 16:54:05 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMicroscope and cleaning of SBOX mirrorsThe mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then
 resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG 
  190   Wed Feb 21 17:33:59 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingThese days, Ronic, Daniele and I achieved
stable cavity locking with the menhir pulsed
laser.
 Screenshot_2024-02-21_1_110931.pngScreenshot_2024-02-21_110934.pngcalculation.jpg 
  191   Wed Feb 21 18:09:11 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingHere is a simulation of the relative FP-cavity
gain vs the CEP for a Finesse of 23000 and
taking into account the Menhir laser optical
 Relative_cavity_gain_vs_CEP.pngGain_vs_CEP.m 
  192   Mon Feb 26 08:58:33 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockingLast week, Ronic and I focused on CEP
measurements of the menhir laser.


Measurements without
 Gain_vs_CEP.pngScreenshot_2024-02-23_0_183652.png 
  193   Mon Feb 26 16:53:24 2024 Xinyi LuFixedinfolasers and opticsOptical roomMenhir pulsed laser lockinghere is the code to get this last curve




 Gain_vs_CEP.m 
  99   Tue Jun 21 23:52:28 2022 Manar AmerFixedreportmechanics | lasers and optics | detectors and electronicsOptical roomMenhir Pulsed LaserThe SBox Length (FSR), was changed to match
the repetition rate of the Menhir
pulsed laser Frep = 216.6625 MHz
 MENHIR_injection_into_fiber.jpgSBox_M.jpg20220620_SBox_MENHIR.pptx 
  227   Fri Nov 29 16:50:04 2024 Alice RenauxUnder Processinfolasers and opticsOptical roomMenhir 216MHz laserThe Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator.
 spectre.xlsxspectre.png 
  226   Fri Nov 29 12:06:05 2024 Alice RenauxFixedinfolasers and opticsOptical roomMenhir 160MHz laserThe Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an
 spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png 
  28   Fri Feb 1 14:04:27 2019 Loïc AmoudryFixedinfolasers and opticsOtherMeeting with LMA people, AFM30/01/19 - The following powerpoint
shows the results discussed with LMA people.

What came out from the discussion
 POINT_SUR_LES_MIROIRS.pptx 
  19   Wed Oct 31 14:03:22 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM4 transmission measurementThe kept transmission for M4 is
2.17 ppm. Which is the value
measured after alignement (center of the
  
  20   Wed Oct 31 14:04:50 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM4 transmission measurement


Loïc
  
  172   Wed Sep 28 18:43:51 2022 Manar AmerFixedreportlasers and opticsOptical roomM2 ThomX spherical Cleaning Today, M2 Spherical-3 from ThomX that was
installed inside the SBox was removed, there
was one big dust on the surface of the mirror,
 6x 
  17   Wed Oct 31 13:48:58 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM1 transmission measurementCenter of M1:




I
  
  21   Wed Oct 31 14:06:17 2018 Loïc AmoudryFixedreportlasers and opticsOptical roomM1 transmission measurementAt different positions, transmission give
194, 193, 208, 200 ppm?

  
  168   Tue Sep 20 12:50:40 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot Yesterday , we locked the cavity and we
see a sign of a high finesse on the transmission
signal, but no measurement of Finesse was
 Screenshot_2022-09-19_2_172943.pngScreenshot_2022-09-19_1_171834.png00mode_LOCK.jpg00mode_LOCK_saturaed.jpg 
  169   Wed Sep 21 12:10:07 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot To compare between the 2 images of the
cavity mode:


the mode by itself has
  
  170   Mon Sep 26 16:15:06 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 ThomX used while shifted from damaged spot On Wednesday 21st , I opened the cavity
did an additional 2 mm shift of the injection
mirror and put it under vacuum again.
 00mode_damaged_0_26ms.jpg00mode_damaged_saturted_50ms.jpgreflection_noLock.jpgreflection_Lock_0_15ms.jpg 
  171   Tue Sep 27 19:30:49 2022 Manar AmerFixedreportlasers and opticsOptical roomM1 Gamma FactoryIn the morning, Vacuum broken and rotated
M1 ThomX 90 degrees clockwise, locked the
cavity in air and we observe a degeneracy
 00mode_ThomX_Mirror_degeneracySpot_1point04ms.jpg00mode_ThomX_Mirror_degeneracySpot_saturateat50.jpgCoupling_mirror_.jpeg 