30
|
Fri Dec 6 11:53:53 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning | XPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot |
 |
|
69
|
Tue Mar 29 16:23:00 2022 |
Manar Amer | Fixed | report | lasers and optics | cabling | Optical room | Mightylaser Amplifier | Migthylaser amplifier has been moved from
the SBox table to the PLIC table.
|
|
|
46
|
Thu Jan 9 16:54:05 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Microscope and cleaning of SBOX mirrors | The mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then |
|
|
190
|
Wed Feb 21 17:33:59 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | These days, Ronic, Daniele and I achieved
stable cavity locking with the menhir pulsed
laser. |
  |
|
191
|
Wed Feb 21 18:09:11 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | Here is a simulation of the relative FP-cavity
gain vs the CEP for a Finesse of 23000 and
taking into account the Menhir laser optical |
 |
|
192
|
Mon Feb 26 08:58:33 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | Last week, Ronic and I focused on CEP
measurements of the menhir laser.
Measurements without |
 |
|
193
|
Mon Feb 26 16:53:24 2024 |
Xinyi Lu | Fixed | info | lasers and optics | Optical room | Menhir pulsed laser locking | here is the code to get this last curve
|
|
|
99
|
Tue Jun 21 23:52:28 2022 |
Manar Amer | Fixed | report | mechanics | lasers and optics | detectors and electronics | Optical room | Menhir Pulsed Laser | The SBox Length (FSR), was changed to match
the repetition rate of the Menhir
pulsed laser Frep = 216.6625 MHz |
  |
|
227
|
Fri Nov 29 16:50:04 2024 |
Alice Renaux | Under Process | info | lasers and optics | Optical room | Menhir 216MHz laser | The Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator. |
 |
|
226
|
Fri Nov 29 12:06:05 2024 |
Alice Renaux | Fixed | info | lasers and optics | Optical room | Menhir 160MHz laser | The Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an |
   |
|
28
|
Fri Feb 1 14:04:27 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Other | Meeting with LMA people, AFM | 30/01/19 - The following powerpoint
shows the results discussed with LMA people.
What came out from the discussion |
|
|
19
|
Wed Oct 31 14:03:22 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M4 transmission measurement | The kept transmission for M4 is
2.17 ppm. Which is the value
measured after alignement (center of the |
|
|
20
|
Wed Oct 31 14:04:50 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M4 transmission measurement |
Loïc |
|
|
172
|
Wed Sep 28 18:43:51 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M2 ThomX spherical Cleaning | Today, M2 Spherical-3 from ThomX that was
installed inside the SBox was removed, there
was one big dust on the surface of the mirror, |
6x |
|
17
|
Wed Oct 31 13:48:58 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M1 transmission measurement | Center of M1:
I |
|
|
21
|
Wed Oct 31 14:06:17 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | M1 transmission measurement | At different positions, transmission give
194, 193, 208, 200 ppm?
|
|
|
168
|
Tue Sep 20 12:50:40 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | Yesterday , we locked the cavity and we
see a sign of a high finesse on the transmission
signal, but no measurement of Finesse was |
   |
|
169
|
Wed Sep 21 12:10:07 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | To compare between the 2 images of the
cavity mode:
the mode by itself has |
|
|
170
|
Mon Sep 26 16:15:06 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 ThomX used while shifted from damaged spot | On Wednesday 21st , I opened the cavity
did an additional 2 mm shift of the injection
mirror and put it under vacuum again. |
   |
|
171
|
Tue Sep 27 19:30:49 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | M1 Gamma Factory | In the morning, Vacuum broken and rotated
M1 ThomX 90 degrees clockwise, locked the
cavity in air and we observe a degeneracy |
  |