    Reply   OEwaves CW Laser - Phase Noise , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
correction on unit 1030 nm




Manar
Amer wrote:



a correction on the wavelength of the laser  it is 1030 um 
Entry   Dust Cleaning of SBox, posted by Manar Amer at Optical room about utilities Log_Top_window.jpgLog_Reflection_window.jpgLog_Injection_Side_window.jpgLog_Injection_side_window2.jpg
An Initial cleaning of the KBoX outside was done, All the optics and mechanics placed that were on the table were removed.

Only the old Mitylaser amplifier remains on the table.

Since we will be using the ThomX Celia amplifier, we will remove it and place it in a secure location (to be decided).
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about utilities 
The cleaning was done twice with half an hour interval between the two times
reading on the dust meter was taken after each time, and it was zero averaged over a 10-min




Manar
Entry   Mightylaser Amplifier , posted by Manar Amer at Optical room about lasers and optics | cabling 
Migthylaser amplifier has been moved from the SBox table to the PLIC table.

 
Entry   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about utilities 
In preparation for cleaning the mirrors.

The spincoater has been moved with its bump into the sas of the SBox.

The pure water used will be provided by Alice, as the previous source in the workshop is not available.
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about mechanics | lasers and optics | utilities 6x
The inside of the cavity was cleaned today. It was very dirty and had big dust particles and fibers inside.

Cleaning was done for everything; wall, floor, fixed mounts, wires (still have some dust difficult to remove), edges.

The dust meter average was measured outside the cavity (2471 p/m3 av 6 min)  and inside after cleaning (1424 p/m3 av 10 min).
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about mechanics | lasers and optics | utilities 20220331_Dust_Meter_Outside_cavity_Av10min.jpg20220331_Dust_Meter_Inside_cavity_Av10min.jpg
After an overnight where the cavity box was left open, a measurement of the Dust meter was taken:

Outside on the optical table on direct air flux (1701 p/m3 Av 10 min) and

Inside the cavity box (998 p/m3 Av 10 min)
Entry   Clean Airflow Dust measurements, posted by Manar Amer at Optical room about detectors and electronics | utilities 
The dust meter cap was cleaned using Alcohol, and using the filter white cap the dust count was (0 Av. 10 min)

After the dust counter was hand held in direct airflow, it counted (1581 p/m3 Av. 2 min).

I tested the count also in the SAS, and it counted twice the amount ~ 4500 p/m3
    Reply   Clean Airflow Dust measurements, posted by Manar Amer at Optical room about detectors and electronics | utilities 20220408_DustMeasurement.jpg
Dust measurement done today on  top of the SBox average 10min




Manar
Amer wrote:



The dust meter cap was cleaned using Alcohol, and using the filter white
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities Reflection_one_front_after_cleaning.jpgreflection_two_front_before_cleaning.jpgReflection_two_front_after_cleaning.jpg
Used the spincoater and pure water to clean dielectric mirrors which will be installed inside the SBox for directing the reflection line.

The method : place pure alchole on mirror - wipe it using white sterile tissue (in one direction) - clean with pure water in spincoater suing
cotton swap .
Entry   KBox Alignment , posted by Manar Amer at Optical room about lasers and optics 7x
Starting with the alignment of the KBox using CW Koheras.

The size of the CW output from the collimator at 1 meter from is ~ 2.4 mm, to be adjusted with lenses to match the cavity !!! (attached
image)
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 6x
SBox alignment, using CW laser Koheras power 1 mW


Finished M1 and M2 alignment using the diffraction patterns seen on the beam profiler, 
the beam fit is not very good ?? (image taken)
Positions of Ma1 and Ma2 motors are
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Ma1_Ma2_Horizontal_Position_Optimized.pngMa1_Ma2_Vertical_Position_Optimized.pngAfter_M1_diaphram_1m_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Saturated_Beam_Optimized.jpgAfter_M2_M1_diaphram_Beam_Optimized.jpg
After pointers and Advice from Aurélien,

improvement of the beam alignment through M1 and M2 irises was done.

To improve the image on the beam profiler, I cleaned the alignment mirrors and the windows using pure ethanol and optical lens cleaning tissue,
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 
Remember to update the position of the reference Irises tomorrow !!!!




Manar
Amer wrote:



After pointers and Advice from Aurélien,
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 9x

Adjust the placement of the Irises  (done at the start of the day, adjusted at the end
when M1 mirror was placed)
Improvement on the
Ma1 and Ma2 (The Alignment Mirrors)

Improves the alignment a bit. There is an observation where there
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx
Finished the alignment of the SBox with M1 of SBox placed, to be changed to gamma factory mirror later

Observed what seems to be transmission through M2 mirror, to be confirmed. image attached shows it

a PowerPoint attached showing the details of today's work.
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities Images_SBox_Mirrors.pptx
Images of the SBox mirrors cleaned at the same time when the cavity was aligned.

Directly from the spincoater to the SBox directly.

PowerPoint attached shows details
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg
Last week In FP cavity we had all SBox mirrors including the damaged M1 mirror.

The beating was observed with just a slight adjustment on M4 alignment.

In addition, it was also observed while driving the piezo of the CW laser.
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg
Today; replaced the M1 SBox mirror with M1 from gamma factory , following the previous alignment.

Removed all mirrors and cleaned them one by one.

Started with no M1, placed M2 did its alignment through M3 pinhole, then placed M3 aligned it through M4 pinhole, then placed M4 aligned it through
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities 20220509_Images_SBox_Mirrors.pptxM1GFA.jpgM2FA.jpgM3FA.jpgM4FA.jpg
PowerPoint shows the detailed images of all the mirrors before and after cleaning.

Images of SBox mirrors and M1 from Gamma factory attached only for the front after cleaning

the lines showing are on the back of the mirrors, they come from the spinning mount the mirrors are fixed on in the spin-coater.