59
Mon Jun 24 16:15:08 2019
Huan Wang
Fixed
info
lasers and optics
Optical room
amplifier
I just had a phone call with Jérome
and he told me 2 things :
* Be carefull ! the MightyLaser
8
Fri Oct 19 11:13:40 2018
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission vs D-shape position at different powe
Measurements have been done on 18/10/18.
Datas are on excel file, also matlab
file.
61
Tue Jan 5 12:38:04 2021
Manar Amer
Fixed
report
lasers and optics
Optical room
Transmission Measurements for the Mirrors.
Thursday 10 December 2020:
First Test Measurement - Inside Box
The
transmission ( T ) for the mirrors of SBOX
6x
133
Fri Aug 19 16:36:18 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
The previous Sbox telescope was dismantled
and the mechanical components cleaned.
its lenses are still in the mounts,
134
Mon Aug 22 18:38:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Beam divergence was measured using a method
called "Focal
136
Tue Aug 23 17:37:38 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
I placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
137
Wed Aug 24 10:39:58 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Here is a view of beam propagation in the
optical software : GaussianBeam
the red filled shape is the model
141
Fri Sep 2 17:50:21 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
removing the reading which is not correct
(wrong use of software)
redone a reading similar using
142
Fri Sep 2 18:10:10 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Note the
correct beam divergence is approximately
~ 2.3 mrad
143
Mon Sep 5 18:06:53 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Am adjustment on the lenses position to
have a smaller waist.
+ 250 mm @ 88 cm from amplifier
145
Wed Sep 7 18:57:20 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
We increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or
96
Wed Jun 8 11:24:35 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope - Spacial Matching
Divergence of the CW beam out of the collimator
measured after 1 meter to be
2
240
Wed Sep 3 18:10:34 2025
Alice Renaux
Under Process
report
lasers and optics
Optical room
Successful lock (finally !)
Today, with Ronic, we managed to get a
successful lock with the NKT laser by setting
up a new PDH box from scratch (photodiode
70
Tue Mar 29 16:27:34 2022
Manar Amer
Fixed
report
utilities
Optical room
Spincoater - Mirrror cleaning
In preparation for cleaning the mirrors.
The spincoater has been moved with
its bump into the sas of the SBox.
75
Wed Apr 13 18:42:50 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Used the spincoater and pure water to clean
dielectric mirrors which will be installed
inside the SBox for directing the reflection
82
Wed Apr 27 22:30:14 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.
Directly from the spincoater to
85
Mon May 9 19:27:35 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
PowerPoint shows the detailed images of
all the mirrors before and after cleaning.
Images of SBox mirrors and M1 from
87
Wed May 11 20:51:28 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
Following the observation that when rotating
M2 plan mirror of SBox the deformation position
of the mode changes.
89
Tue May 24 21:51:01 2022
Manar Amer
Fixed
report
lasers and optics | utilities
Optical room
Spincoater - Mirrror cleaning
While repeating the alignment, the mirrors
were cleaned using the spin-coater and placed
again.
100
Mon Jun 27 08:52:46 2022
Manar Amer
Fixed
report
lasers and optics | vacuum
Optical room
SBox Finesse at 216.6625 MHz
The Sbox currently has the injection from
ThomX installed T ~ 120 ppm , M2 planar from
Sbox spare and M3 / M4 spherical mirrors