104
|
Wed Jul 6 18:39:25 2022 |
Manar Amer | Fixed | report | lasers and optics | vacuum | Optical room | SBox Finesse at 216.6625 MHz | Max Finesse obtained @ 4 mirror setup was
~ 19 300
With M1 from ThomX , M2/M3/M4 from |
|
|
105
|
Wed Jul 6 18:39:38 2022 |
Manar Amer | Fixed | report | lasers and optics | vacuum | Optical room | SBox Finesse at 216.6625 MHz |
|
|
|
77
|
Mon Apr 25 17:28:29 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | SBox alignment, using CW laser Koheras
power 1 mW
|
6x |
|
78
|
Mon Apr 25 17:58:01 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | After pointers and Advice from Aurélien,
improvement of the beam alignment
through M1 and M2 irises was done. |
    |
|
79
|
Mon Apr 25 18:02:09 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Remember to update the position of the
reference Irises tomorrow !!!!
|
|
|
80
|
Tue Apr 26 20:08:10 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment |
Adjust the placement of
the Irises (done at the start of the |
9x |
|
81
|
Wed Apr 27 22:13:37 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later |
 |
|
83
|
Mon May 9 18:36:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.
The beating was observed with just |
 |
|
84
|
Mon May 9 19:05:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment. |
   |
|
86
|
Wed May 11 09:19:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Yesterday, to find the source of why the
mode is deformed, I tried to rotate the mirrors
to see if there is a change. |
|
|
88
|
Wed May 11 21:10:27 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | M2 Sbox changed to spare. Alignment of
M2 was redone.
With the help of Ronic , We observe |
  |
|
90
|
Tue May 24 22:05:48 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | The external and internal alignment was
redone.
External Alignment : the collimator |
7x |
|
93
|
Wed Jun 8 10:47:45 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | SBox Alignment | Closing Series for Alignment.
Beating observed, beam is in the
locking stages |
|
|
53
|
Wed Jan 29 19:04:38 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before. |
|
|
54
|
Wed Feb 5 14:47:16 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Yesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with |
|
|
55
|
Wed Feb 5 16:46:01 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique. |
|
|
6
|
Tue Oct 9 10:19:29 2018 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Record power-up | Measurement made on 03/10/18 (nothing has
been done since there).
Stable power in the cavity of 225 |
|
|
123
|
Mon Aug 8 17:58:32 2022 |
Ronic Chiche | Fixed | info | lasers and optics | Optical room | Pulse duration measurement before and after CVBG (as a strecher) | I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the |
  |
|
57
|
Thu Feb 6 16:58:57 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Power up to 48kW crater effect again | As we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater). |
  |
|
154
|
Fri Sep 9 14:44:35 2022 |
Manar Amer | Fixed | report | lasers and optics | Optical room | Power storage In Cavity | We start of power output from amplifier
of 1W with only the first and second stage
on then we start with the third stage power |
|