  Status of commissioning, report also here plots are reports., Page 12 of 13  Not logged in ELOG logo
Entry   AFM+ InfraRed spectroscopy (IR spectro) has been performed, posted by Loïc Amoudry at Other about lasers and optics 191113_AFMetspecIR-miroirs_SBOX.pdf
Entry   AFM performed on S-BOX mirrors, posted by Loïc Amoudry at Other about lasers and optics Image3.jpgImage4.jpg
Entry   AFM analysis of M2, posted by Loïc Amoudry at Optical room about lasers and optics M2.PNG
Entry   AFM analysis of M1, posted by Loïc Amoudry at Optical room about lasers and optics 200115_AFM_miroirs.pdf
Entry   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
    Reply   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
    Reply   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
Entry   2nd stage CELIA amplifier, posted by Ronic Chiche at Optical room about lasers and optics 2nd_stage_pump_wavelength.jpg
    Reply   2nd stage CELIA amplifier, posted by Ronic Chiche at Optical room about lasers and optics image_faisceau_multimode_@1030nm.PNG
Entry   2-mirror cavity locking, posted by Alice Renaux at Optical room about lasers and optics Figure_1.pngFigure_2.png
Entry   2-mirror cavity full setup, posted by Alice Renaux at Optical room about lasers and optics 
Entry   2-mirror cavity alignment, posted by Alice Renaux at Optical room about mechanics | lasers and optics 2-mirror_cavity_alignment.zip
Entry   2-mirror cavity alignment, posted by Alice Renaux at Optical room about lasers and optics IMG20250527160111.jpg
    Reply   2-mirror cavity alignment, posted by Alice Renaux at Optical room about lasers and optics Sans_titre.jpg
Entry   2 mirror cavity high power experiments, posted by Xinyi Lu at Optical room about lasers and optics record_20240425.pngScreenshot_2024-04-25_4_155354-155kw.pngScreenshot_2024-04-25_1_154630-155kw.png60kW_highordermode2.jpg
Entry   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-08_2_182405.png
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics manip2miroirs.pptx2mirror_plan_shperical_beam_size.png
Entry   100W CELIA laser amplifier "how's to" document, posted by Ronic Chiche at Optical room about lasers and optics | software How_to_start_the_Amplifier_v1.pdf