Synchronisation
Elog synchro, Page 1 of 7
Not logged in
Find
|
Last day
|
Login
|
Help
Full
| Summary |
Threaded
138 Entries
Goto page 1,
2
,
3
...
5
,
6
,
7
Next
All
ID
Date
Author
Status
Type
Category
Important
Subject
Icon
Text
4
Tue Feb 4 16:24:53 2020
Entered by Nicolas Delerue from 193.55.29.169 on Tue Feb 4 16:24:39 2020
Under Process
Fix
Timing
Mise à jour XML synchro
La recette XML des valeurs de synchronisation
a été mise à jour dans
https://atrium.in2p3.fr/nuxeo/nxdoc/default/dc821b72-899c-42cc-9896-8d327d9670ff/view_documents
18
Tue Oct 19 12:48:42 2021
Entered by vincent.chaumat from 134.158.88.158 on Tue Oct 19 12:48:20 2021
Under Process
Question
Timing
DG3 (diag) output frequency
Suite des investigation avec François
W ce matin:
Les codes "fréquence"
25
Mon Dec 13 17:53:10 2021
Entered by Nicolas Delerue from 80.119.21.73 on Mon Dec 13 17:52:57 2021
Under Process
Fix
Timing
Intervention IHM retards déclenchement
Les réglages actuels des retards
sont sauvés dans la mémoire
6.
26
Fri Dec 17 20:26:27 2021
Entered by Nicolas Delerue from 80.119.21.73 on Fri Dec 17 20:26:12 2021
Under Process
Info
Timing
Synchro éteinte
Bonjour,
En prévisions de la coupure
électrique, la synchro côté
30
Fri Jan 14 10:44:21 2022
Entered by Super Team from 134.158.195.141 on Fri Jan 14 10:44:08 2022
Under Process
Question
Timing
Démarrage des DS des générateurs de retard
Pour redémarrer le DS Sim.SY/DEG.sim
:
/data/shared/DS_CALC/launch_ds_gene_retard.sh
34
Fri Feb 11 11:29:48 2022
Entered by SC/HM/VS from 134.158.195.141 on Fri Feb 11 11:10:04 2022
Under Process
Problem
Other
DS miroirs lasers M4 et M5
Impossible d'accéder au DS des
miroirs M4 et M5 du laser.
Impossible d'aligner le laser
35
Mon Feb 14 10:15:26 2022
Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:15:13 2022
Under Process
Fix
Timing
Recette synchro
Recette du 01-02-2022 rechargé et
sauvé sous le nom : 20220201_reference.xml
Correction d'un bug de lecture
38
Mon Mar 7 14:49:27 2022
Entered by Nicolas Delerue from 134.158.195.144 on Mon Mar 7 14:49:13 2022
Under Process
Problem
Material
Probleme ecran Synthe linac
L 'ecran du synthe linac ne fonctionne
plus.
Il est possible de se connecter
39
Mon Mar 7 14:54:58 2022
Entered by Nicolas Delerue from 134.158.195.144 on Mon Mar 7 14:49:13 2022
Under Process
Problem
Material
RE: Probleme ecran Synthe linac
40
Mon Mar 7 15:24:48 2022
Entered by Nicolas Delerue from 134.158.195.144 on Mon Mar 7 14:49:13 2022
Under Process
Problem
Material
RE: RE: Probleme ecran Synthe linac
*RST
SOUR:POW:POW?
-30
41
Wed Aug 24 09:59:46 2022
Entered by Vincent Chaumat from 134.158.88.158 on Wed Aug 24 09:59:25 2022
Under Process
Other
Timing
Modif synchro
L'ajout du 16MHz anneau est nécessaire
pour la synchro.
La modif est effectuée dans
46
Thu Jan 12 12:09:35 2023
Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 12 12:09:20 2023
Under Process
Info
Timing
Cable temporaire pour tests Anneau
Branchement temporaire
Canal 4 du DEG2 => E2 panneau
de brassage synchro => cable 90382 =>
48
Tue Jun 13 13:00:27 2023
Entered by Nicolas Delerue from 134.158.88.175 on Tue Jun 13 13:00:12 2023
Under Process
Problem
Other
Pb insertion dephaseur
L'insertion des déphaseurs 500MHz
a causé du bruit sur le signal envoyé
à la cavité RF. Cf copies d'eçran
55
Thu Oct 12 15:44:46 2023
VC, ND
Under Process
Info
Other
Intervention synchro
Signal de l'une des électrodes
de RI-C1/BPM.03 remonté via le câble
BPM spare 46037 jusqu'au panneau 90526
56
Fri Oct 13 15:04:16 2023
VC, ND
Under Process
Info
Other
Intervention synchro
* En baie 9: Signal géné
33MHz divisé en 2 et envoie vers scope
et baie 8. Le signal provenant de la CFP
57
Fri Oct 13 17:49:05 2023
ND
Under Process
Info
Other
Scope Signaux Baie 9
Acquisition en cours sur 192.168.229.21
Voie 1: Trig
Voie 2: 33MHz CFP (simulé)
59
Tue Oct 17 13:06:54 2023
ND, VC
Under Process
Info
Other
RE: Scope Signaux Baie 9
Voie 2: Mélange des 500MHz + Passe-bas
15MHz
60
Tue Oct 17 16:23:05 2023
ND, VC
Under Process
Info
Other
RE: RE: Scope Signaux Baie 9
Signaux deplaces sur WAC3
71
Thu Nov 9 13:55:58 2023
KD
Under Process
Problem
Material
puissance 500MHz RI
Aujourd'hui la puissance envoyé
par le synthé 500MHz RI était
trop faible (-15dbm au niveau de l'ampli
76
Mon Dec 11 08:26:45 2023
VC, ND
Under Process
Other
Timing
Test programme CPLD
8H15 démarrage chiller et modulateur
9H30 Ronde pour fermer la casemate
9h36 Trig
Goto page 1,
2
,
3
...
5
,
6
,
7
Next
All