Diagnostiques
  elog des diags., Page 5 of 8  Not logged in ThomX    logo
Entry   ND, Mateo Fanet, Francois Belcourt; Calibration des ecrans Screenshot_from_2022-12-02_12-10-37.png
Entry   Entered by Nicolas Delerue from 134.158.88.175 on Thu Dec 15 11:10:51 2022; Mise à jour de l'interface SST 
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 12 14:05:21 2023; Beam size measurement added to Plateform IHM  
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Tue Jan 17 16:26:36 2023; Test vitesse des moteurs 
    Reply   ND; RE: Câblage 
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Feb 9 11:51:52 2023; Nouvelle calibration pour le SST + modif IHM_SST 
    Reply   Entered by Nicolas Delerue from 193.55.29.171 on Thu Feb 9 11:51:52 2023; RE: Nouvelle calibration pour le SST + modif IHM_SST 
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Wed Feb 15 16:56:36 2023; Positionnement automatique des caméras 
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:13:43 2023; Test temps reponse IHM SST 
    Reply   Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:13:43 2023; RE: Test temps reponse IHM SST 
Entry   KD; mauvaise calibration TL_SST1 2023-02-20_08_36_43_tl_dg_sst_01-ccd_01_RAW_16bits.tiffcalibration_TL_SST1_20230220.pptxIHM_SST.png
    Reply   ND; RE: mauvaise calibration TL_SST1 
    Reply   ND; RE: RE: mauvaise calibration TL_SST1 calibration_SST_20230220.pptx2023-02-20_14_24_42_li_dg_sst_01-ccd_01_RAW_16bits.tiff2023-02-20_13_38_55_tl_dg_sst_02-ccd_01_RAW_16bits.tiff2023-02-15_04_24_18_image_tl_dg_sst_01_pos_-41.0_expo_0.1.png2023-02-13_04_48_22_image_tl_dg_sst_01_pos_-41.0_expo_0.1.png
Entry   Entered by Nicolas Delerue from 134.158.88.175 on Fri Feb 24 09:46:02 2023; Nouvelle calibration pour les SST - Images de validation 2023-02-22_04_16_02_image_li_dg_sst_01_pos_37.5_expo_0.005_check.png2023-02-20_04_23_45_image_tl_dg_sst_01_pos_-41.0_expo_0.15_check.png2023-02-24_05_50_59_image_tl_dg_sst_03_pos_-33.5_expo_0.2_check.png2023-02-24_05_05_41_image_tl_dg_sst_02_pos_-33.0_expo_0.7_resized_check.png
icon1.gif   ND; Cable LED camera EL 
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Mon Feb 5 14:44:15 2024; En cas d'extinction des SST 
Entry   ND; Retard TL/DG/SST.02 
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Sep 5 16:20:08 2024; Ajustement résolution LI/DG/SST.01 
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Fri Sep 6 13:42:59 2024; Etude declencemenent Basler ACE 
Entry   Entered by Moutardier from 134.158.195.142 on Wed Jan 20 16:15:31 2021; Démarrage ds MeanStd 