HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
Diagnostiques
elog des diags., Page 5 of 7
Not logged in
Find
|
Last day
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
128 Entries
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
,
7
Next
All
Entered by Super Team from 134.158.195.142 on Fri Jan 14 15:13:08 2022;
Entered by Nicolas Delerue from 193.55.29.170 on Fri Jan 14 12:32:43 2022; Delay change on WAC2
Entered by Nicolas Delerue from 134.158.195.142 on Mon Jan 3 17:21:51 2022; Redemarrage Diags
Entered by Moutardier Alexandre from 193.55.29.170 on Thu Dec 9 11:06:37 2021; Libera éteint
Entered by Moutardier Alexandre from 193.55.29.170 on Thu Dec 9 11:06:37 2021; RE: Libera éteint
Entered by Super Team from 134.158.195.142 on Tue Nov 23 11:15:33 2021; IHM charge
Nicolas Delerue; RE: IHM charge
Nicolas Delerue; RE: RE: IHM charge
Nicolas Delerue; RE: RE: RE: IHM charge
Nicolas Delerue; RE: RE: RE: RE: IHM charge
Nicolas Delerue; RE: RE: RE: RE: RE: IHM charge
Nicolas Delerue; RE: RE: RE: RE: RE: RE: IHM charge
Entered by Iryna Chaikovska from 134.158.195.144 on Tue Oct 26 12:51:24 2021; cyclage dipole, entered from 134.158.195.143
Entered by Moutardier Alexandre from 134.158.195.144 on Wed Nov 17 18:18:12 2021; Calibration caméra SST TL1
Nicolas Delerue, Alexandre MOUTARDIER, Pierre GUILLON, Rasha ABUKESHEK & Ruth ILLICACHI; Setting of the cameras
Entered by Moutardier Alexandre from 134.158.195.144 on Thu Oct 28 17:01:17 2021; Problème BPM linac
Entered by Moutardier Alexandre from 134.158.195.144 on Wed Oct 27 10:08:15 2021; Verification cablage BPM
Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 16:30:54 2021; Vérification cablage BPM
Entered by Iryna Chaikovska from 134.158.195.144 on Tue Oct 26 12:51:24 2021; , entered from 134.158.195.144
Entered by Iryna Chaikovska from 134.158.195.144 on Tue Oct 26 12:31:59 2021; Search for the signal LI/DG/BPM.01-LIB.01
Entered by Moutardier Alexandre from 193.55.29.170 on Tue Oct 26 11:25:40 2021; Correction erreur cablage BPM linac
Entered by Iryna Chaikovska from 134.158.89.93 on Thu Oct 14 17:02:09 2021; BPM signal with the beam recorded by the scope on 12/10/2021
Entered by Iryna Chaikovska from 134.158.89.93 on Thu Oct 14 16:23:19 2021; Commissioning of the Libera ER/DG/RAC.05-LIB-01 (BPM LI/DG/BPM.01-LIB.01)
Entered by Alexandre Moutardier from 193.55.29.169 on Mon Oct 11 15:18:09 2021; Cabage des BPM et WaveCatcher
Entered by Alexandre Moutardier from 193.55.29.169 on Mon Oct 11 15:13:03 2021; Libéra 5 en erreur
Entered by Nicolas Delerue from 80.119.21.73 on Fri Jul 23 12:24:08 2021; IHM Charge
Entered by vincent.chaumat from 134.158.195.144 on Fri Jul 23 09:27:09 2021; vérification fonctionnement IHM charge avec parametres d'étalonnage
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
,
7
Next
All
ELOG V3.1.4-395e101