  116   Wed Jan 11 17:51:09 2023 Entered by Nicolas Delerue from 80.119.21.73 on Wed Jan 11 17:48:29 2023Not FixedInfoOther EL/DG/FC.01-WAC.03 mal réglé en temps, entered from 80.119.21.73 EL/DG/FC.01-WAC.03 est mal réglé
en temps, la charge renvoyé ne donne
pas la bonne valeur (cf image ci-joint).
 IMG_20230111_175531_5-20230111-175552343.jpgIMG_20230111_175418_7-20230111-175552949.jpg 
  113   Mon Jan 2 15:16:34 2023 NDFixedInfoMaterial RE: Diagnostics eteinds Les diagnostics ont été rallumés.




  
  112   Fri Dec 23 18:21:35 2022 NDFixedInfoMaterial Diagnostics eteinds Les diagnostics ont ete eteint afin d'economiser
de l'electricite pendant la pause hivernale.
  
  111   Thu Dec 15 11:11:06 2022 Entered by Nicolas Delerue from 134.158.88.175 on Thu Dec 15 11:10:51 2022New SolutionInfoCameras SST Mise à jour de l'interface SST L'affichage du gain et de l'intensité
sur l'interface SST a été
mise à jour.
  
  110   Thu Dec 1 16:02:14 2022 ND, Mateo Fanet, Francois BelcourtNew SolutionInfoCameras SST Calibration des ecrans La calibration des ecrans a ete calculee
et entree dans l'interface SST.

 
 Screenshot_from_2022-12-02_12-10-37.png 
  Draft   Fri Nov 25 15:33:20 2022 ND, VCUnder ProcessInfoBPMs Etude calibration BPMs Config:

Gene 500MHz -> Splitter 8 voies
-> 4 voies BPM + 4 charges
  
  108   Thu Nov 24 16:17:23 2022 ND, Mateo Fanet, Francois BelcourtUnder ProcessInfoBPMs Etudes sur les BPM Etude de l'alignement de BPMs

16:17 rep rate 50/10/10/10

Identification et correction d'un
  
  Draft   Thu Nov 24 14:06:27 2022 ND, Mateo Fanet, Francois BelcourtUnder ProcessInfoBPMs Etudes sur les BPM Etude de l 'alignement des declenchement
des BPM

14:07
  
  106   Tue Nov 15 11:47:41 2022 NDUnder ProcessInfoCameras SST Intervention du 15/11 - Nouvel eclairage installe sur TL/DG/SST.01
et TL/DG SST.01 (reste LI/DG/SST.01 et 
EL/DG/SST.01 a faire)
  
  105   Thu Nov 3 11:41:38 2022 NDNew SolutionInfoBPMs Update on scan charge phase An update has been done on the script launched
by the scan charge phase IHM.

Now if the first scan is 0-360
  
  104   Thu Oct 27 10:47:59 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 10:47:42 2022FixedFixCameras SST Ajustement retard TL/SST2 Intervention du 26/10:

Le retard pour les cameras ACE
a été ajusté dans l'interface
  
  103   Mon Oct 17 23:59:16 2022 Entered by Nicolas Delerue from 80.119.21.73 on Mon Oct 17 23:59:02 2022FixedInfoBPMs Réglages d'attenuation des BPMs Les réglages d'atténuation
des BPM effectués le 6/10 avaient
été effacés! Je les
  
  102   Mon Oct 17 11:14:50 2022 Entered by Iryna Chaikovska from 134.158.89.93 on Mon Oct 17 11:14:36 2022FixedProblemBPMs problem with ChD of the ri-c2/dg/bpm.04-lib.05 We  went to the casemate to check
visually the BPM ri-c2/dg/bpm.04-lib.05
after Friday's shift. We found the the
  
  101   Thu Oct 13 15:06:50 2022 NDUnder ProcessInfoCameras SST RE: Installation MRSV Camera du MRSV non fonctionnelle... À
tester...

 
  
  100   Thu Oct 13 10:31:17 2022 NDUnder ProcessInfoCameras SST Installation MRSV Le MRSV a ete installee (a tester).

Utilisation de l'alimentation
de EL/DG/SST
  
  99   Thu Oct 13 10:29:15 2022 NDUnder ProcessInfoCameras SST Desinstallation EL/DG/SST EL/DG/SST est temporairemment indisponible
(connexion utilisee pour le MRSV)
  
  Draft   Thu Sep 22 14:46:33 2022 ND AMUnder ProcessProblemCameras SST TL/DG/SST.02 La camera TL/DG/SST.02 a un comportement
bizarre.

Parametre de declenchement:
  
  97   Mon Sep 19 14:42:53 2022 ND AMUnder ProcessInfoCameras SST Control intensité caméras SST Des boutons de contrôle d'intensité
ont été ajoutés sur
les caméras SST.
  
  96   Fri Sep 16 11:37:35 2022 Entered by Moutardier Alexandre from 91.168.92.148 on Fri Sep 16 11:37:23 2022 FixCameras SST rotation de la caméra SST rotation de 180° des caméra
TL/DG/SST.01, 02, 03 et EL/DG/SST.01
Toutes les caméra sont orienté
  
  95   Thu Sep 15 11:56:46 2022 ND AM VCNew SolutionInfoMaterial Calibration des fentes TL/DG/SRH.01 Calibration des fentes TL/DG/SRH.01

Ecart contacteurs: 45mm

Course: 4750
  