HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Diagnostiques
  elog des diags.  Not logged in ThomX    logo
Message ID: 102     Entry time: Mon Oct 17 11:14:50 2022
 Author: Entered by Iryna Chaikovska from 134.158.89.93 on Mon Oct 17 11:14:36 2022 
 Status: Fixed 
 Type: Problem 
 Category: BPMs 
 Important:
 Subject: problem with ChD of the ri-c2/dg/bpm.04-lib.05 
 Icon:  

We  went to the casemate to check visually the BPM ri-c2/dg/bpm.04-lib.05 after Friday's shift. We found the the ChD was NOT CONNECTED.

It is not clear why since last time all the connections were checked !!!

We connected the cable and will check it with the beam.

ELOG V3.1.4-395e101