955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| |
8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V
RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC
The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3
Steerers: H [2.48 -4.46]; V [-1.86 2.29]
Section Att. 2.77 dB, Phase 208, TL/BPM2 X= 0.1
11h45 Ring injection. Ri-c2/ps/str.06-h.01 and Ri-c2/ps/str.06-v.01 tango servers were off
12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.
12h53 Start ring RF
14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.
15h27 Modulator on Standby
16h30 HV on.
16h37 Modulator 'off' voluntary. Unknown reason.
17h55 HV 'on' 1215 V, Section Phase 217, -125 pC
18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).
18h55 HV 'on' 1215 V, Section Phase 217, -125 pC
Orbit at straight sections goes down on 2 mm.
19h13 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-07_10-57-55.png
|
 |
| Attachment 2: TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
|
 |
| Attachment 3: TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
|
 |
| Attachment 4: Screenshot_from_2024-11-07_19-09-59.png
|
 |
| Attachment 5: Screenshot_from_2024-11-07_19-01-44.png
|
 |
| Attachment 6: Screenshot_from_2024-11-07_18-56-43.png
|
 |
|
956
|
Fri Nov 8 09:35:41 2024 |
IC, VK, JN | Under Process | Shift summary | Ring |
|
ring studies | |
8h50 Start of the modumator and all subsystems
Beam studies.
Orbit Correction.
Transport only with dipoles - turn at 161.4A
Frequency from 500.0853 change to 500.0913
Tries BBA
16h12 Problem with sudden change of params.
Recepies did nopt store corrected orbit: due to erro in EL steerer.
In continuation to yesterday study Jean Noel soldered in parallel 33 ohm : effect on orbit visible . Need to find correct shunt resistance (temperature) and power > 10 W.
Power supply does not show any sign of problem.
18.40 End of shift |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_11_13.png
|
 |
| Attachment 2: Screenshot_from_2024-11-08_12-01-54.png
|
 |
| Attachment 3: Screenshot_from_2024-11-08_12-10-59.png
|
 |
| Attachment 4: Screenshot_from_2024-11-08_12-31-24.png
|
 |
| Attachment 5: Screenshot_from_2024-11-08_12-31-48.png
|
 |
| Attachment 6: Screenshot_from_2024-11-08_12-38-19.png
|
 |
| Attachment 7: Screenshot_from_2024-11-08_12-42-58.png
|
 |
| Attachment 8: Screenshot_from_2024-11-08_13-16-14.png
|
 |
| Attachment 9: Screenshot_from_2024-11-08_13-49-36.png
|
 |
| Attachment 10: Screenshot_from_2024-11-08_14-34-45.png
|
 |
| Attachment 11: Screenshot_from_2024-11-08_16-12-07.png
|
 |
| Attachment 12: Screenshot_from_2024-11-08_18-26-43.png
|
 |
| Attachment 13: withWORF5000913Screenshot_from_2024-11-08_12-11-51.png
|
 |
|
990
|
Thu Jan 9 08:35:10 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring |
|
| |
08h35 Start ThomX: Modulator, Frigo, All magnets.
08h40 Cicling all magnets, Start Chillers
10h00 HV is 'On'
Modulator Interlocks at HV=1215V
10h25 HV=1215 V
Rec. from 20241219 18:14
Linac Steerers: H [2.38 -4.16], V [-1.70 2.15]
RF Gun Phase is 199.0 dg., RF Gun Att. is 0 dB, (Dark Current is 18 mV, too low), Sect. Att. 2.53 dB, Sect. Phase is 221 dg.
Charges: -106 pC, -107 pC, -116 pC
10h50 Beam is injected to the ring
Trying the LOCO
12h35 Modulator Interlocks at HV=1215V, Went to 1200 V. Did not help even at 1000V (Maher's intervention needed).
13h00 This is the problem with triggering. When triggered internally, the modulator is working.
13h07 OK at HV=1215 V (Unknown reason). Nikolas said miss triggering is less than 5%
13h20 Linac frequency was changed a little bit to diminish miss triggering
18h00 Stop ThomX
|
| Attachment 1: Screenshot_from_2025-01-09_16-00-44.png
|
 |
| Attachment 2: Screenshot_from_2025-01-09_14-24-06.png
|
 |
| Attachment 3: Screenshot_from_2025-01-09_11-11-21Change_inRingChargedueLinacEnrgy.png
|
 |
| Attachment 4: TL_SST01_Screenshot_from_2025-01-09_10-34-15.png
|
 |
| Attachment 5: Screenshot_from_2025-01-09_10-32-26.png
|
 |
| Attachment 6: Screenshot_2025-01-09_10-30-03.png
|
 |
| Attachment 7: Screenshot_from_2025-01-09_16-03-40.png
|
 |
| Attachment 8: Screenshot_from_2025-01-09_16-31-08.png
|
 |
| Attachment 9: Screenshot_from_2025-01-09_17-55-28.png
|
 |
| Attachment 10: Screenshot_from_2025-01-09_17-52-20.png
|
 |
| Attachment 11: Screenshot_from_2025-01-09_17-49-53.png
|
 |
| Attachment 12: Screenshot_from_2025-01-09_17-39-00.png
|
 |
| Attachment 13: Screenshot_from_2025-01-09_17-38-38.png
|
 |
| Attachment 14: Screenshot_from_2025-01-09_17-38-03.png
|
 |
| Attachment 15: TrendTBTSumScreenshot_from_2025-01-09_18-06-08.png
|
 |
|
Draft
|
Fri Apr 4 09:05:06 2025 |
ML, VM, DN, ND | Under Process | Shift summary | Ring |
|
Prise de données 4/04 | |
8:59 Mise en chauffe
9:15 Installation laser alignement SR
10:30 Problem Astor et Jive (see screenshot)
Recipe loaded: LI_TL_RI_all_20250402_13_31_23
Adjust orbit
Recipe saved: LI_TL_RI_test_20250404_12_25_21
12:10 Beam stored
Adjust iris position to take into account new ring size.
Problem with controlled access...
14:57 Alignment of the iris OK
15:30 Access to install lenses
17:30 Optimise mens for SR
18:00 Stop beam
|
| Attachment 1: Screenshot_from_2025-04-04_10-30-13.png
|
 |
| Attachment 2: Screenshot_from_2025-04-04_13-58-16.png
|
 |
| Attachment 3: Screenshot_from_2025-04-04_14-29-50.png
|
 |
| Attachment 4: Screenshot_from_2025-04-04_14-56-39.png
|
 |
| Attachment 5: Screenshot_from_2025-04-04_16-19-45.png
|
 |
| Attachment 6: Screenshot_from_2025-04-04_16-51-06.png
|
 |
| Attachment 7: Screenshot_from_2025-04-04_17-17-34.png
|
 |
| Attachment 8: Screenshot_from_2025-04-04_16-19-45.png
|
 |
| Attachment 9: Screenshot_from_2025-04-04_17-53-46.png
|
 |
| Attachment 10: Screenshot_from_2025-04-04_17-22-17.png
|
 |
|
Draft
|
Thu Sep 11 08:49:20 2025 |
IC, VM | | | Ring |
|
BBA | |
08h50 Warm up of the modulator |
|
Draft
|
Thu Sep 11 11:12:36 2025 |
IC, VM | | | Ring |
|
BBA | |
8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92 2.13]
11h00 Beam is in the ring. Receipt 70 MeV from references BPM TL2 X=-1 mm
11h30 HV went standby. Maher fixed it.
11h32 HV is 'ON'
BPM transmission does not work properly (see screenshot)
Good storage at 70 MeV with the receipt.
Laser phase adjustment during the shift a few times
Work on the BBA at 70 MeV
For this, measurement of the ORM. There is a differennce with the model ORM. Attempts to tune the ring from the model. Work should be continued.
Due to this, only manual BBA can be done at the moment.
Starting also to adress the manual BBA in the TL. We used HCOR2 and QP5 and TL BPM.03. The results are not clear (big element-to-element distances). To be continued.
18h STOP THOMX
|
| Attachment 1: Screenshot_from_2025-09-11_12-57-22.png
|
 |
| Attachment 2: Screenshot_from_2025-09-11_17-36-53.png
|
 |
| Attachment 3: Screenshot_from_2025-09-11_17-47-30.png
|
 |
|
1178
|
Fri Jan 9 08:05:32 2026 |
KD, IC, VM, RC | Under Process | Shift summary | RF D1 | Linac Commissionning | Ring Commissioning |
|
shift du 9 janvier 2026 | |
8h05: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
09h06 HV is ON
10h10 receipt recipe_recipe_LI_TL_RI_all_20260108_17_34_30.txt (242 A BMAD). RF gun phase 226 dg. Sect Att. 2.457 dB, sect. phase 214 dg. Laser att. 319 Charges: -127, -122, -127, -124 pC
RF 100 kV, phase -7.5 dg, manual phase shifter 4497. TL/BPM02 x=-3 mm
10h20 after the PSS interloc the modulator is running, but there is no any RF
10h35 Kevin fixed it. HV is on
11h37 receipt recipe_recipe_LI_TL_RI_all_20260107_17_19_00.txt loaded for Sol. 238 A BMAD
RCDS on injection receipt saved recipe_recipe_LI_TL_RI_all_20260109_11_52_26.txt
13h 41 Go to 242 A to measure the spectrum
The beam blow up is visible.
Optimization of the ring to find anther working point Tunes 0.145/0.7. The beam storage seems more stable, small MRSV 15/21 pixels New receipt: recipe_recipe_LI_TL_RI_all_20260109_14_44_42.txt
15h14 change to npminam point Isol = 230 A Optimization of the injection. MRSV 15/22 pixels
Measurement of the spectrum
15h40 optimization of the injector
Good storage and MRSV beam size is restored. X- ray flux is about 20 kpA
At every point the streak camera data is saved.
Taking the spectra
*** Results (all files in data shared, streak, PhotonicScience, spectrum) ***
An error was made during the source size measurement of the usual working point (230A), no beam size available for that recipe (from previous measurement e- [H,V] = [180, 120], to be confirmed)
--- Bunch length (cf. curve)
The preliminary analysis show that the bunch length seems to not be affected by the recipe used. The 230A recipe show a longer bunch but it is not very significatif due to the machine stability.
--- bunch size
242A (in the morning) : e- [H,V] = [141 um, 56 um]
242A (in the afternoon) : e- [H,V] = [154 um, 58 um] (same as in the morning)
242A after optimization : e- [H,V] = [107 um, 62 um]
238A : e- [H,V] = [161 um, 92 um]
--- Spectrum ==> divergence : to be done |
| Attachment 1: Screenshot_from_2026-01-09_15-04-48.png
|
 |
| Attachment 2: Screenshot_from_2026-01-09_15-04-01.png
|
 |
| Attachment 3: Screenshot_from_2026-01-09_15-03-10.png
|
 |
| Attachment 4: Screenshot_from_2026-01-09_10-53-00.png
|
 |
| Attachment 5: Screenshot_from_2026-01-09_10-06-58.png
|
 |
| Attachment 6: Recettes_comp.jpg
|
 |
|
41
|
Fri Jun 25 16:35:18 2021 |
Entered by Christelle Bruni from 82.64.20.144 on Fri Jun 25 16:35:00 2021 | Fixed | Shift summary | RF D1 | Linac Commissionning |
|
Bilan du 25 juin 2021 : commissioning linac | |
-Le canon a été mesuré à bas niveau sur place et en salle RF
-Les premiers diagnostics montrent qu’allonger la cathode permet de rattraper la fréquence, même si il restera certainement un déséquilibre des amplitudes de champ dans chaque cellule
-Le canon spare se poursuit, et sera probablement disponible à la fin de l’année
-Nous préférons disposer d’un canon au plus tôt même en mode dégradé afin de continuer la mise en route et le debugage des équipements en faisceau
-Le canon est démonté du linac, la vanne entre le canon et la section doit impérativement restée fermée
-La charge est montée sur la branche RF canon, le reseau a été testé aux fuites et remis sous SF6
-Refroidissement nécessaire de la charge ?
-Mohamed a organisé le conditionnement de la section LIL avec Hayg, Maher et Jean-Noel en support
-Nourredine et le groupe vide ont modifier les autorisations MPS pour rendre le conditionnement de la section LIL possible, pas possible si défaut vide sur un des volumes du linac
-Préparation des ICT, la faraday et l’écran bout de ligne (loin de la section) ?
-Problème sur le circuit d’eau constaté jeudi à intervention Dalkia ?
-Nécéssaire pour le conditionnement de la section LIL
•Rattrapage du canon (disponibilité courant septembre)
•Conditionnement de la section LIL (à partir de lundi 28 juin en présence de JP Pollina si la réparation Dalkia tient)
•lundi 28 juin 14h, intervention synchro et ICT (Mohamed+ Nicolas)
•Jeudi 31 juin 10h, intervention écran (Christelle + Nicolas)
•Casemate fermée toute la semaine
|
|
42
|
Mon Jun 28 11:45:12 2021 |
Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Attenuations |
|
RF attenuations :
-
GUN (Maximun atténuation) Limite Hard = 1667 steps
-
Section (Minimum attenuation = 0 steps)
Notez la limite maximul d'attenuation. Les valeurs calibrées s'arretent avant. |
| Attachment 1: AttenuationCalibrationCurves.png
|
 |
| Attachment 2: Attenuation_sets.png
|
 |
|
43
|
Mon Jun 28 15:53:17 2021 |
Entered by Super Team from 134.158.195.141 on Mon Jun 28 15:53:02 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Conditionnement de la section |
|
Conditionnement de la section
Verification et correction de la chaine de mesure
Ajustement des atténuations des 3 voies :
- PiS (Incident section)
- PrS(Réflechis Section)
- PCS (Charge fin section)
Mise en place de filtres passe bande pour avoir un signal propre autour de 3GHz :
- PiS (Incident section)
- PrS(Réflechis Section)
- PCS (Charge fin section)
- PiK (Puissance incident Klystron)
Autorisation radioprotection (Contact de P. Robert) pour résoudre le problème
Permis divers, il fallait dépassifier
MPS interdit :
Interdit modulateur car l'autorisation n'a pas été donnée. Nourredine est sur place pour résoudre.
|
|
44
|
Tue Jun 29 15:20:43 2021 |
Entered by Hayg Guler from 86.247.24.134 on Tue Jun 29 15:20:25 2021 | Not Fixed | Linac | RF D1 | Linac Commissionning |
|
Conditionnement de la section |
|
Preparation au conditionnement de la Section
Soucis avec le modulateur
- Modulateur se met en chauffage suite à un interlock qu'on a pas pu identfifier
--> Attente 1h pour remettre en marche
- une fois qu'il mis en marche il repart pour 1h en chauffage ...
Oscilloscope RF :
accessible sur le réseau ThomX sous le nom oscillo3.thomx.fr
ensuite pour y accéder il suffit de passer par un navigateur WEB
Vérification Sortie du PA:
Le signal n'est pas carré comme prévu. Le cable est suspecté.
Il y avait un décalage entre l'impulsion HF et l'impulsion Klystron. décalée de 160 µs de l'impulstion déclenchement du modulateur.
Intervention de Nicolas pour la recaler.
Temperatures du Chiller
La temperature de consigne a été mise à 29.20°C pour avoir 30°C au niveau de la section (clarinette).
Une adaptations des coéficients de calibration Volt --> °C sera faite pour avoir bien 30°C de consigne pour 30°C à la Clarinette.
|
| Attachment 1: Selection_081.png
|
 |
|
49
|
Tue Jul 6 18:38:26 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Jul 6 18:38:12 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Mesures de PiK | |
| alim(V) |
UHT(kV) |
Puissance sortie de PA (W) avec cable |
mesure Power meter (dBm) |
couplage+attenuation+IL filtre (dB) |
mesure Pik (mW) |
mesure Pik(MW) |
PA (dBm) |
PA(W) |
|
| 790 |
195.01 |
368 |
6.65 |
86.35 |
1995262314.96888 |
2.00 |
9.66 |
368.128973642531 |
|
| 800 |
197.2 |
368 |
6.87 |
86.35 |
2098939883.62352 |
2.10 |
|
39.8107170553497 |
|
| 810 |
199.4 |
369 |
6.8 |
86.35 |
2065380155.81053 |
2.07 |
|
39.8107170553497 |
|
| 830 |
203.8 |
368 |
7.98 |
86.35 |
2710191631.89084 |
2.71 |
|
39.8107170553497 |
|
| 840 |
206.03 |
368 |
8.81 |
86.35 |
3280952931.13119 |
3.28 |
|
39.8107170553497 |
|
| 850 |
208.24 |
368 |
9.29 |
86.35 |
3664375746.47832 |
3.66 |
|
39.8107170553497 |
|
| 860 |
210.4 |
368 |
9.65 |
86.35 |
3981071705.53497 |
3.98 |
|
39.8107170553497 |
|
| 870 |
212.6 |
368 |
9.95 |
86.35 |
4265795188.01592 |
4.27 |
|
39.8107170553497 |
|
| 880 |
214.8 |
368 |
10.45 |
86.35 |
4786300923.22638 |
4.79 |
|
39.8107170553497 |
|
| 890 |
216.96 |
368 |
10.74 |
86.35 |
5116818355.40307 |
5.12 |
|
39.8107170553497 |
|
| 900 |
219.12 |
368 |
11.09 |
86.35 |
5546257129.5791 |
5.55 |
|
39.8107170553497 |
|
| 910 |
221.27 |
368 |
11.49 |
86.35 |
6081350012.78716 |
6.08 |
|
39.8107170553497 |
|
| 930 |
225.52 |
368 |
12.18 |
86.35 |
7128530301.26519 |
7.13 |
|
39.8107170553497 |
|
| 950 |
229.81 |
368 |
12.78 |
86.35 |
8184647881.3479 |
8.18 |
|
39.8107170553497 |
|
| 980 |
236.26 |
368 |
13.61 |
86.35 |
9908319448.92764 |
9.91 |
|
39.8107170553497 |
|
| 1000 |
240.48 |
368 |
14.13 |
86.35 |
11168632477.8056 |
11.17 |
|
39.8107170553497 |
|
| 1030 |
246.8 |
368 |
14.86 |
86.35 |
13212956341.8657 |
13.21 |
|
39.8107170553497 |
|
| 1040 |
248.83 |
368 |
15.28 |
86.35 |
14554590805.8197 |
14.55 |
|
39.8107170553497 |
|
| 1050 |
250.91 |
368 |
15.42 |
86.35 |
15031419660.9002 |
15.03 |
|
39.8107170553497 |
|
| 1060 |
253 |
368 |
15.72 |
86.35 |
16106456351.7827 |
16.11 |
|
39.8107170553497 |
|
| 1070 |
255.08 |
368 |
15.99 |
86.35 |
17139573075.0842 |
17.14 |
|
39.8107170553497 |
|
| 1080 |
257.14 |
368 |
16.3 |
86.35 |
18407720014.6895 |
18.41 |
|
39.8107170553497 |
|
| 1090 |
259.21 |
368 |
16.55 |
86.35 |
19498445997.5804 |
19.50 |
|
39.8107170553497 |
|
| 1100 |
261.27 |
368 |
16.78 |
86.35 |
20558905959.8414 |
20.56 |
|
39.8107170553497 |
|
| 1110 |
263.33 |
368 |
16.95 |
86.35 |
21379620895.0223 |
21.38 |
|
39.8107170553497 |
|
| 1120 |
265.35 |
368 |
17.22 |
86.35 |
22750974307.7207 |
22.75 |
|
39.8107170553497 |
|
| 1130 |
267.39 |
368 |
17.41 |
86.35 |
23768402866.2487 |
23.77 |
|
39.8107170553497 |
|
| 1140 |
269.95 |
368 |
17.69 |
86.35 |
25351286304.9791 |
25.35 |
|
17179083871.5759 |
|
| 1150 |
271.98 |
368 |
17.88 |
86.35 |
26485001386.0669 |
26.49 |
|
39.8107170553497 |
|
| 1160 |
274.03 |
368 |
18.06 |
86.35 |
27605778562.2034 |
27.61 |
|
39.8107170553497 |
|
| 1170 |
276.1 |
368 |
18.26 |
86.35 |
28906798823.6548 |
28.91 |
|
39.8107170553497 |
|
| 1180 |
278.11 |
368 |
18.43 |
86.35 |
30060763026.2823 |
30.06 |
|
39.8107170553497 |
|
| 1190 |
280.11 |
368 |
18.59 |
86.35 |
31188895840.9394 |
31.19 |
|
39.8107170553497 |
|
| 1200 |
282.16 |
368 |
18.78 |
86.35 |
32583670100.2009 |
32.58 |
|
39.8107170553497 |
|
| 1210 |
284.3 |
368 |
18.94 |
86.35 |
33806483620.5982 |
33.81 |
|
39.8107170553497 |
|
| 1220 |
286.31 |
368 |
19.09 |
86.35 |
34994516702.8358 |
34.99 |
|
39.8107170553497 |
|
| 1230 |
288.37 |
368 |
19.27 |
86.35 |
36475394692.5607 |
36.48 |
|
39.8107170553497 |
|
|
|
192
|
Tue Nov 30 10:31:04 2021 |
Entered by Super Team from 134.158.195.141 on Tue Nov 30 10:30:47 2021 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
Soucis modulateur | |
problèmes pour démarrer, il se met encore en défait pendant la periode de chauffe. Le probleme vu hier n'est donc pas réglé. |
|
234
|
Wed Jan 5 15:25:30 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
Interventon Modulateur | |
Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention sur le modulateur. |
|
236
|
Wed Jan 5 17:41:03 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
RE: Interventon Modulateur | |
soucis Modulateur toujours pas réglé. Un signal (dans un module d'automate du modulateur) semble poser problème.
Maher a contacté scandinova.
| Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 wrote: |
|
Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention sur le modulateur.
|
|
|
244
|
Thu Jan 13 16:22:09 2022 |
Entered by Super Team from 134.158.195.141 on Thu Jan 13 16:21:55 2022 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Demarrage machine | |
Démarrage :
Rondiers : coup de poing d'arret d'urgence étaient enfoncés, on a du appeler Harold pour nous aider à débloquer la porte arrière de la casemate.
- Moduleteur en TRIG,
- RF OK
Atténuateur Canon et Section : 2dB
Modulateur tombé sans message d'erreur, on a pu redémarrer rapidement.
16h36 : Modulateur tombé encore sans message d'erreur -> 16h41 ok
16h50 : Charge phase : Qmax 85 pC pour phase = 120 ° (données dans : /data/shared/Commissioning_tools/Mesure/20220113/Charge_phase/)
17h25 : modification des pas moteur du Moteur M5 du laser par Kevin. Passage de 20 à 200 steps par revolution.
Alignement du Laser : Données sur /data/shared/Commissioning_tools/Mesure/20220113/Align_laser/
--> meilleure position :
pas X : 135
pas Y: 5420
sur les positions du spot sur la camera laser:
mean x 1370.81 pixels +/- 2.37 pixels
mean y 671.66 pixels +/- 3.25 pixels
positions ont changé depuis que l'iris a été modifié. La position devrait encore bouger, Viktor devrait replacer le spot laser au centre de l'image.
Charge phase pour differentes tailles d'iris motorisé
taille initiale : -9948
taille : -13726 --> diaphragme plus ouvert (image 18_14_47 en pj)
Charge phase @ 18h17 --> charge max 140 pC
taille : -3331 --> image 18_36_40
Charge phase @ 18-33-57
18h39 : Modulateur tombé, sans message d'erreur. 2h de fonctionnement ! par contre on a perdu le HV .... 1h à attendre
18h45 --> On arrete
Données du jour : /data/shared/Commissioning_tools/Mesure/20220113/
|
| Attachment 1: Screenshot_from_2022-01-13_16-52-21.png
|
 |
| Attachment 2: charge_phase__at_13-01-2022__16-48-26.jpg
|
 |
| Attachment 3: 2022-01-13_18_14_47_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_50.png
|
 |
| Attachment 4: charge_phase__at_13-01-2022__18-18-22.jpg
|
 |
| Attachment 5: 2022-01-13_18_36_40_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_50.png
|
 |
|
284
|
Fri Jan 28 15:26:02 2022 |
Entered by Super Team from 134.158.195.141 on Fri Jan 28 15:25:46 2022 | Under Process | Info | RF D1 | Linac Commissionning |
|
Shift du jour | |
14h30 : Machine démarée :
15h20 : Modulateur en défaut faut attendre 1h ... --> du coup je vais manger 
17h00 : idem modulateur à nouveau OFF. Il faut comprendre, sinon les runs vont etre compliqués.
17h20 : FIN
Le Laser tourne tout le WE, Vincent a lancé une acquisition. |
|
357
|
Mon Feb 21 14:35:18 2022 |
Entered by Super Team from 134.158.195.141 on Mon Feb 21 14:35:03 2022 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
message debit eau modulateur | |
un message de debit insuffisant est apparu ce matin (40 l/min au lieu de 80 l/min)
une intervention est demandée pour savoir si ce défaut est réel ou si il s'agit d'un disfonctionnement du débitmetre. |
|
386
|
Mon Mar 7 13:40:56 2022 |
Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
PSS en sdc arreté | |
Le PSS ne tourne plus en SdC (roue crantée figées) depuis le 5 mars 7:40
HM |
|
387
|
Mon Mar 7 16:30:36 2022 |
Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022 | Fixed | Problem | RF D1 | Linac Commissionning |
|
PSS redemarre | |
Intervention Maher : PSS ok
|