| Toutes les notes concernant les Commissionning de ThomX, Page 8 of 63 |
Not logged in |
 |
|
| New entries since: | Thu Jan 1 01:00:00 1970 | |
VM, IC, DN, RC; Interaction region studies 6x
|
MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025; 
|
IC, DN, RC, HG, ME; Improve ring for X-rays 7x
|
KD, IC, VM; shift du 1e octobre 2025
|
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;
|
VM, IC; Check of the 70 MeV with MRSV, Ring studies    
|
IC, VM;  
|
Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022; Shift du 23/09/2022 6x
|
ND, IC, VK, VM; Shift àf 3/11/2022 9x
|
ND, VC; Intervention synchro
|
Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022; 
|
ND, SC, VM, VK; Prise de donnee 5/01 8x
|
ND, IC, VK, VM; Prise de donnee 6/01 9x
|
IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
|
ND,DN,SC,NE, EM; Quart collectif 25/4
|
ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
|
NC,IC, VM,lS;  
|
LS, MB, VC, ND; Programme prise de donnees 8/06   
|
LS, ND; shift du 29 juin 2023
|
LS,ND; run du 30 juin 2023 
|
|