Message ID: 1225     Entry time: Fri Apr 3 07:51:41 2026
 Author: IC,VM, ND 
 Status: Under Process 
 Type: Shift summary 
 Category:  
 Important:
 Subject: , entered from 127.0.0.1 
 Icon:  

7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

9h30 HV is ON

recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded

Adjustments for bunch length measurements at the linac exit.

11h40 Laser Phase 75 dg., Sect. Phase 225 dg., Sect. Att. 2.46 dB, I_Gun -105.0196 pC, I_Linac -109.9004 pC, I_TL -11.3 pC RF_Ampl. 0 kV, RF_Phase -35 dg.

14h27 Laser Phase 69 dg., Sect. Phase 225 dg., Sect. Att. 2.559 dB, I_Gun -112.9786 pC, I_Linac -138.8843 pC, I_TL -127.2119 pC RF_Ampl. 98.0026 kV, RF_Phase -35 dg.

from RTM 3004 100ms/div. Channel 4 - ring beam charge: timestamp: 2026-04-03_14:31:33.541 MeanCH4 = 9.711800E-02
 StdCH4 = 3.114028E-03
 VppCH4 = 1.617000E-02

 