HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 61 of 62  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026; , entered from 127.0.0.1 
Entry   IC, VM; Work on orbit at 70 MeV for X rays xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png
Entry   KD, VM, MJ, RC; shift du 24 mars 2026 HorOrbit_vs_Att.png
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026; Ring studies 
Entry   IC, VM, DN, MJ;  MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png
Entry   MJ KD IC VM DN RC; ENERGY-ANGLE 70 MeV - 27 mars 2026 droma_70_MeV.png
Entry   KD; shift du 31 mars 2026 
Entry   KD MJ; shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV Droma_61p5_MeV_2026-03-31_17-41-07.pngDectris_centre_faisceau_2026-03-31_17-19-05.png
Entry   KD MJ RC DN VK; 1e avril 2026 - Scan Energy-Angle 61.5 MeV orbite_61p5_MeV_2026-04-01_19-24-56.png
Entry   IC,VM;  
Entry   IC,VM, ND; , entered from 127.0.0.1 
Entry   IC,VM, KD, DN, MJ; MONO 61.5 MeV - 07 avril 2026 
Entry   7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage); , entered from 127.0.0.1 
Entry   IC,VM;  
Entry   IC,VM;  
Entry   IC,VM; Beam studies. preparation for 40 MeV 
Entry   KD MJ RC DN VK; ENERGY/ANGLE 40 MeV - 15 avril 2026 
Entry   Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026; , entered from 127.0.0.1 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png
Entry   IC,VM, HG, RC, DN; beam studies. FPC.  
Entry   IC;  
ELOG V3.1.4-395e101