Entry   KD, VM, RC, MJ, IC, DN; shift du 19 fevrier 2026 Screenshot_from_2026-02-19_16-50-44.pngScreenshot_from_2026-02-19_16-03-44.pngScreenshot_from_2026-02-19_16-03-32.png
7h30: mise en chauffe en remote (chillers/frigo, modulateur, laser, cyclage)

08h55 HV is ON

09h29 Beam is in the ring W/O RF. the receipt loaded:  recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt (big bump verticaly around IP)
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)

08h57 HV is on

09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
Entry   IC; Ring studies 
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)

HV ON

The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
Entry   KD, VM, RC, MJ, IC; shift du 24 fevrier 2026 7x
7h40: mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

 

*** Programme ***
Entry   KD MJ DN VK IC; 25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT 
7h30: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

*** Programme *** : 
          - Check spectres OnAxis, V+25 et V+40 apres resistances dipole installe hier soir  
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on
Entry   IC, VM; , entered from 127.0.0.1 Screenshot_from_2026-02-27_10-25-37.png
07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h00 HV is on

09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz
Entry   VM, MJ, DN, RC; Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 7x
08h35 Warm-up ThomX: Modulator, Laser, Fridge

Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite
PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir)
icon1.gif   MJ VM DN RC HG; Etudes matching  
Mesures : Spectres et taille source X + Quads scans associées, @ 

** Sol 230 100pC 

** Sol 242 100pC
Entry   VM;  
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   VM, HG, JN;  Screenshot_from_2026-03-06_18-22-28.png
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift  
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
Entry   KD, VM, MJ, RC; shift du 11 mars 2026 - TRANSFOCATEUR diode_calib_2026-03-11_14-07-08.pngdiode_calib_2026-03-11_14-08-13.png
8h: mise en chauffe en remote (cyclage, modulateur, laser, frigo/chiller)
clients et réseau très lent ==> reboot à faire sur TOUT les clients (client1 à 100% de la mémoire
de prise)
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026; Emittance vs Iris 
Some Quad scans with variying the Iris opening.

Data :


17h17 : 2mm 120 pC
17h31 : 1.3mm 100pC
17h46 : 1mm 80pC
18h00 : 1mm 100 pC
18h27 : 1mm 100
Entry   KD, VM, MJ, RC, DN; shift du 12 mars 2026 
8h: mise en chauffe de la machine en remote (modulateur, laser, frigo/chillers, cyclage)

*** Programme ***

- Prise de données MonoChromateur. 
Entry   MJ, KD; MONOCHROMATEUR - 12 mars 2026 
Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2 0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 , H-20 , H+20 , V-20

-----------------------------------------------------------------------------------------------------------
Entry   Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON
Entry   MJ HG VK; Etudes de points MATCHING - 13 mars 2026 
Programme : Etudes points Matching
==============================

Fentes2 centre faisceau a l’œil [H , V] = [7 , -18]
Entry   KD MJ RC DN VK; ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 
8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

*** programme : Mesures : sol 230 100 pC

- Taille vert. e- (FPC)   ==> FAIT  
Entry   KD, VM, MJ, RC, DN; shift du 18 mars 2026 8x
8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

*** Programme : Mesure spectre et monochromateur à 61.5MeV
(70MeV si le temps le permet)