KD; shift du 18 février 2026
|
7h40: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
8h40 HV ON
10h20 recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt saved , |
KD, VM, RC, MJ, IC, DN; shift du 19 fevrier 2026  
|
7h30: mise en chauffe en remote (chillers/frigo, modulateur, laser, cyclage)
08h55 HV is ON
09h29 Beam is in the ring W/O RF. the receipt loaded: recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt (big bump verticaly around IP) |
IC, VM;  
|
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)
08h57 HV is on
09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded |
IC; Ring studies
|
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)
HV ON
The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead. |
KD, VM, RC, MJ, IC; shift du 24 fevrier 2026 7x
|
7h40: mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
*** Programme *** |
KD MJ DN VK IC; 25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT
|
7h30: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme *** :
- Check spectres OnAxis, V+25 et V+40 apres resistances dipole installe hier soir |
IC, VM;
|
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on |
IC, VM; , entered from 127.0.0.1
|
07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h00 HV is on
09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz |
VM, MJ, DN, RC; Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 7x
|
08h35 Warm-up ThomX: Modulator, Laser, Fridge
Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite
PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir) |
VM;
|
09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on |
VM, HG, JN;
|
09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift
|
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power) |
KD, VM, MJ, RC; shift du 11 mars 2026 - TRANSFOCATEUR 
|
8h: mise en chauffe en remote (cyclage, modulateur, laser, frigo/chiller)
clients et réseau très lent ==> reboot à faire sur TOUT les clients (client1 à 100% de la mémoire
de prise) |
Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026; Emittance vs Iris
|
Some Quad scans with variying the Iris opening.
Data :
17h17 : 2mm 120 pC
17h31 : 1.3mm 100pC
17h46 : 1mm 80pC
18h00 : 1mm 100 pC
18h27 : 1mm 100 |
KD, VM, MJ, RC, DN; shift du 12 mars 2026
|
8h: mise en chauffe de la machine en remote (modulateur, laser, frigo/chillers, cyclage)
*** Programme ***
- Prise de données MonoChromateur. |
MJ, KD; MONOCHROMATEUR - 12 mars 2026
|
Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2 0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 , H-20 , H+20 , V-20
----------------------------------------------------------------------------------------------------------- |
Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chillers were started, cycling all magnets
09h48 HV is ON |
MJ HG VK; Etudes de points MATCHING - 13 mars 2026
|
Programme : Etudes points Matching
==============================
Fentes2 centre faisceau a l’œil [H , V] = [7 , -18] |
KD MJ RC DN VK; ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026
|
8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
*** programme : Mesures : sol 230 100 pC
- Taille vert. e- (FPC) ==> FAIT |
KD, VM, MJ, RC, DN; shift du 18 mars 2026 8x
|
8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme : Mesure spectre et monochromateur à 61.5MeV
(70MeV si le temps le permet) |