  407   Mon Mar 21 09:53:11 2022 Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022 InfoAimants Cyclage QUAD (TL) The cycling of the following quads ( to
zero current) were tested. The corresponding
cycling cuves were loaded in the DS (checked).
  
  175   Tue Nov 23 10:56:50 2021 Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021FixedOtherAimants | Linac Commissionning Cyclage dipole  For 22/11/2021

There is the remaining field from
the dipoles in the TL. In order to go straight
 cylage_dipole.pngScreenshot_from_2021-11-23_12-16-04.pngScreenshot_2021-11-23_at_14.40.52.png 
  442   Thu Apr 14 11:05:07 2022 Entered by IC/V/SC from 134.158.195.141 on Thu Apr 14 11:04:51 2022Under ProcessLinacLinac Commissionning Polarités des quadrupoles Faisceau en route, visualisation sur TL/DG/SST.01

Bobine focalisation : 190 A, LI/PS/STR.01-H01
= -1A, LI/PS/STR01-V01 = 1A, Faisceau quasi
 Screenshot_2022-04-14_11-10-59.png 
  3   Tue Oct 18 15:12:24 2016 Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 15:12:09 2016Under ProcessShift summaryresumes   test  2014-05-15_Conditionnement_circulateur_RF_et_canon_PHIN.pptx 
  2   Tue Oct 18 14:25:34 2016 Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 14:25:09 2016Not FixedShift summaryPrise de donnees test de log jeudi 18 octobre

il faudrait mettre un place un
canevas type pour un point de fonctionnement
 Timing_Osc-1a4.jpg 
  44   Tue Jun 29 15:20:43 2021 Entered by Hayg Guler from 86.247.24.134 on Tue Jun 29 15:20:25 2021Not FixedLinacRF D1 | Linac Commissionning Conditionnement de la section icon1.gif Preparation au conditionnement de la Section

 

Soucis avec le modulateur


Modulateur
se met en chauffage suite à un interlock
 Selection_081.png 
  Draft   Tue Jan 18 11:57:15 2022 Entered by Hayg Guler from 134.158.91.29 on Tue Jan 18 11:44:00 2022    , entered from 134.158.91.29    image_SST2021-11-23_19_35_07_tl_dg_sst_01-ccd_01_RAW_2.png 
  Draft   Thu Sep 22 10:08:30 2022 Entered by Hayg Guler from 134.158.91.29 on Thu Sep 22 10:08:17 2022Fixed   , entered from 134.158.91.29     
  117   Wed Oct 13 17:54:58 2021 Entered by Hayg Guler from 134.158.195.141 on Wed Oct 13 17:54:31 2021Under ProcessShift summaryLinac Commissionning Shift Linac Laser-Canon  Shift Linac


Programme prévisionnel
:
 charge_phase.jpg 
  94   Wed Oct 6 20:10:42 2021 Entered by Hayg Guler from 134.158.195.141 on Wed Oct 6 20:10:28 2021Under ProcessLinacDiag | Linac Commissionning ICT : Signaux avant et apres la section icon6.gif Le faisceau a passé la section :


Bleu : avant section
Rouge
: apres section


 
 ICT_LI_et_TL_3200.pngICT_LI_et_TL_400.png 
  91   Tue Oct 5 10:55:40 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:55:25 2021Not FixedProblemAimants | Vide | Linac Commissionning Interlock RF + Solenoides  
Gradient accélérateur
: 80 MV/m (atténuateur Canon à
1.5 dB)
Solénoides :

COL1(CC)
 Screenshot_from_2021-10-05_10-55-29.pngScreenshot_from_2021-10-05_13-25-45.pngScreenshot_from_2021-10-05_16-32-19.png 
  89   Tue Oct 5 10:05:21 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021Reference SolutionLinacLaser Comment éteindre le laser icon3.gif Pour couper le Laser :


il faut arrêter seulement
l'Ampli, et laisser l'oscillateur
  
  166   Tue Nov 16 16:00:41 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 16:00:26 2021New SolutionInfoLaser | Linac Commissionning synchro laser et dephasage icon4.gif Le laser Photocathode peut etre controle
par Tango via LI/OP/OPT.02-LAS.01-XXXX

Le dephasage RF/Laser doit etre
  
  165   Tue Nov 16 11:44:06 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 11:43:53 2021Under ProcessInfoLinac Commissionning Shift Alignement tete de machine  Laser : 


Nouveaux
hublots pour le Laser photocathode 
Environ
50 µJ sur la photocathode
Stabilité
 charge_pahse.jpg 
  160   Tue Nov 9 18:30:37 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 9 18:30:22 2021Under ProcessShift summaryLinac Commissionning Resumé du jour icon1.gif Shift consacré à la calibration
des moniteurs de pertes ainsi qu'à
l'allignement de la tete de machine (Laser
  
  49   Tue Jul 6 18:38:26 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Jul 6 18:38:12 2021Under ProcessLinacRF D1 | Linac Commissionning Mesures de PiK 


alim(V)
UHT(kV)
Puissance
sortie de PA (W) avec cable
mesure
Power meter (dBm)
couplage+attenuation+IL
  
  95   Thu Oct 7 17:12:58 2021 Entered by Hayg Guler from 134.158.195.141 on Thu Oct 7 17:12:27 2021FixedLinacLinac Commissionning Scan charge phase Scan charge phase : ajustement avec les
deux déphaseurs, phase shift du laser
à 82 ps.
 charge_phase.jpgUntitled.ipynbscan_charge_phase.csv 
  171   Thu Nov 18 18:39:18 2021 Entered by Hayg Guler from 134.158.195.141 on Thu Nov 18 18:39:04 2021Under ProcessShift summaryLinac Commissionning Energies avant section pour différents gradients  Methode : 

on utilise le steerer LI/PS/STR01-V01
et les mesures sont faites sur le Yag de
  
  88   Mon Oct 4 19:19:24 2021 Entered by Hayg Guler from 134.158.195.141 on Mon Oct 4 19:19:08 2021Under ProcessInfoLinac Commissionning Vide pendant la prise de données icon1.gif    Screenshot_from_2021-10-04_19-21-32.png 
  36   Mon Jun 14 15:23:43 2021 Entered by Hayg Guler from 134.158.195.141 on Mon Jun 14 15:23:29 2021FixedInfoRF D1 Températures Chiller icon1.gif Etiquettes des températures :

nous
avons corrigé les étiquettes
affectées aux températures,
 Screenshot_from_2021-06-14_15-26-00.png 