HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 52 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:20:39 2022;  
Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:36:51 2022;  
Entry   HG/CB; prise de données énergie phase (run du 6 juillet) 
Entry   Entered by Super Team from 134.158.195.141 on Thu Jul 7 19:48:47 2022;  
Entry   mo;  
Entry   Entered by Super Team from 134.158.195.141 on Mon Jul 11 14:56:17 2022;  
Entry   Entered by Super Team from 134.158.195.141 on Tue Jul 12 12:27:24 2022;  
Entry   CB/JNC; run du 12 juillet 2022 
Entry   MO;  
Entry   Mo;  
Entry   JNC/CB/SC/EG; run du 18 juillet 2022 Scan_pos_phase_LIL__at_18-07-2022__18-00-01.png
Entry   MO;  
Entry   SC/JNC/CB; run du 19 juillet 2022 
Entry   CB/JNC; run du 20 juillet 2022 6x
Entry   ND/AM/LP/VK/VI; Operations  
Entry   CB/JNC; Arret necessaire du dipole en cyclage  
Entry   EG/JNC; run du 21 juillet 2022 
Entry   CB/KD; hublot laser casemate : intervention à prévoir le 22 aout 
Entry   MO;  
Entry   JNC/CB/SC; état machine 
ELOG V3.1.4-395e101