HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 52 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored Shift started at 18h

With the current injector settings,
it was difficult to inject.  We loaded
 6x 
  101   Fri Oct 8 16:59:37 2021 Entered by HG, SC et MO from 134.158.195.142 on Fri Oct 8 16:59:22 2021Under ProcessLinacLinac Commissionning BPMs Travail sur les BPMs en cours   
  130   Thu Oct 28 10:45:34 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 10:45:21 2021FixedInfoDiag BPMs On visualise le faisceau sur les BPMs via
l'interface BPM adc viewer
  
  139   Thu Oct 28 17:13:35 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:13:21 2021Under ProcessLinacDiag BPMs Passage à 1 Hz pour transport faisceau
avec bobine de foc pour test sur les BPMs
en bougeant les steerers
  
  608   Wed Oct 26 14:13:16 2022 Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:13:01 2022 UrgentLinac Commissionning BPM TL 2, 3 et 4 ? Les BPM TL 2 3 et 4 ont l'air fige
. Les valeurs sur 'ihm sont totalement
figees ...
  
  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? Aujourd'hui Iriya m'a montre en
salle de controle une "etendue"
de ~4mm de l'orbite du faisceau mesuree
  
  1154   Thu Nov 20 09:26:33 2025 VM, ICUnder ProcessUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning BBA Ring Goal: Ring BBA

09h14 Unable to start thomx. Need
help. Probably problem with cooling water.
 Errors.jpegScreenshot_from_2025-11-20_14-04-53.png 
  Draft   Thu Sep 11 08:49:20 2025 IC, VM  Ring BBA 08h50 Warm up of the modulator   
  Draft   Thu Sep 11 11:12:36 2025 IC, VM  Ring BBA 8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase
 Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png 
  1074   Wed May 21 12:16:11 2025 MJ HG Shift summaryLinac Commissionning Axes Q1Q3 et Section apres chang cathode iris 0.5
100 pC
ph ch max 259
 Sole_Align.png 
  237   Mon Jan 10 09:27:14 2022 Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 FixDiag | CC | Linac Commissionning Automatique "health check" Allumage de client 5. Pourquoi était-il
éteint sachant qu'il y a des ds
qui doivent tourner dessus ?
  
  42   Mon Jun 28 11:45:12 2021 Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021Under ProcessLinacRF D1 | Linac Commissionning Attenuations icon1.gif RF attenuations :



GUN
(Maximun atténuation) Limite Hard
= 1667 steps


Section
 AttenuationCalibrationCurves.pngAttenuation_sets.png 
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons La puissance entree canon a ete verifie
et conforme a l'atterndu (6 MW = 18/3
MW)
  
  110   Mon Oct 11 18:04:35 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 18:04:10 2021FixedOtherLinac Commissionning Arręt faisceau     
  146   Fri Oct 29 15:53:12 2021 Entered by sophie chance from 134.158.195.142 on Fri Oct 29 15:52:55 2021FixedInfoLinac Commissionning Arręt faisceau Arrêt modulateur, arrêt faisceau   
  418   Thu Mar 24 17:26:38 2022 Entered by Super Team from 134.158.195.142 on Thu Mar 24 17:26:25 2022FixedLinacLinac Commissionning Arręt faisceau     
  516   Thu Jul 21 18:49:49 2022 CB/JNC UrgentLinac Commissionning Arret necessaire du dipole en cyclage  Le dipole est actuellement resté
en état de cyclage

Merci de vérifier l'état
  
  422   Mon Mar 28 16:54:30 2022 Entered by HM/SC/JNC from 134.158.195.142 on Mon Mar 28 16:54:16 2022FixedLinacLinac Commissionning Arret faisceau Transport du faisceau jusqu'au dump
avec solénoides, steerers et quadrupoles
on
  
  111   Tue Oct 12 09:44:23 2021 Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:44:10 2021Under ProcessLinacLinac Commissionning Anoxie Ce matin, le capteur d'anoxie est à
nouveau en panne, Harold va intervenir

Le modulateur est en chauffe
  
  113   Tue Oct 12 09:55:52 2021 Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:55:39 2021FixedLinacLinac Commissionning Anoxie Le problème d'Anoxie est réglé   
ELOG V3.1.4-395e101