637
|
Thu Dec 1 01:14:36 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022 | New Solution | Shift summary | Ring | Diag |
|
Beam time / Thursday 1st December | |
|
9:10 Il y a quelqu'un de DEKRA qui deambule seul dans l'IGLEX sans dosimetre. A-t-il ete prevenu du risque?
9:15: La console operateur etait laissee ouverte avec de nombreuses fenetres ouvertes...
9:18 Resistivite eau: 5.5 Mo
Pression air comprime 7 bars.
9:20 Mise en chauffe de modulateur
Heath check OK
9:40 Cyclage aimants
10:40 Beam on
10:53 Scan charge vs phase. Cf plots joints
10:56 Chargement recette test_20221130_17_33_59 ne passe pas la cavite
11:10 Faisceau non trouve dans TL/SST.02
Temperature chiller elevee
11:20 La phase a change
11:30 Realignement mirroir par Viktor.
Cavite desaccordee
11:49 Mise du modulateur en standby
=> attente 30 minutes
11:49 Mohamed a confirme que la cavite RF anneau est detune pour permettre les operations anneau.
11:50 Jean Noel accede a la casemate.
12:15 Scan charge phase demare
12:25 Nouvelle phase charge max: 175
Des claquages pendant le scan.
12:31 Faisecau sur TL/DG/SST1
12:32 Chargement recette test_20221130_17_33_59
12:40 faisceau sur TL/DG/SST.02
Recherche phase section
Charge max LI/DG/ICT.01 > 100pC => Attenuateur laser a 341mm
13:01 Phase section: 95
13:05 Faisceau sur TL/DG/SST.03
Start EP
13:08 Recette sauvee dans all_20221201_13_08
15:35 Modulator crashed + recovered
16:55 Phase section 93. Scan tres bruyant
Difficultes a injecter dans l' anneau.
17:35 Injection dans l 'anneau retrouvee
===
Plan for the beam time:
1) Re-establish transport to the ring
2) Inject in the ring
3) Save ring recipe
4) Check BPMs in AGC mode
5) Check screens calibration
6) Changement mesure taille SST |
| Attachment 1: health_check.png
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_51_43.png
|
 |
| Attachment 3: scan_charge_phase_min_140.0_max_220.0_10_53_7.png
|
 |
| Attachment 4: scan_charge_phase_min_160.0_max_240.0_11_21_32.png
|
 |
| Attachment 5: Screenshot_from_2022-12-01_11-48-20.png
|
 |
| Attachment 6: Screenshot_from_2022-12-01_12-16-00.png
|
 |
| Attachment 7: dispersion_13_3_31.png
|
 |
| Attachment 8: dispersion_16_54_28.png
|
 |
| Attachment 9: dispersion_17_24_54.png
|
 |
| Attachment 10: dispersion_17_28_14.png
|
 |
| Attachment 11: quad_scan_tl_dg_sst.03_20221201_16_3x.png
|
 |
|
1057
|
Wed Apr 16 13:48:05 2025 |
Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025 | Under Process | Shift summary | LI |
|
Beam study | |
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du faisceau.
2 alignements :
Alignement : triplet quads
ST1[H,V] = [0.75 , -2.36]
ST2[H,V] = [-2.91 , 2.68]
Alignement Section : Post ID 1002
str1H 1.64
str1V -1.94
str2H -3.77
str2V 2.87
1 - nous avons verifié notre point de fonctionnement, via un soleno scan pour differents alignements. Le vertical a toujours un soucis à basse valeur de soleno. La variation de l'iris ne change pas le soucis.
2- Quad Scan : nouveau script pour sauvegarder les images. Quad_scan_save_img.py : données pour alignement section
17:30 fin
|
| Attachment 1: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.png
|
 |
| Attachment 2: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.png
|
 |
| Attachment 3: Size_vs_SolenoScan_14-07-49.png
|
 |
| Attachment 4: Q_vs_SolenoScan_14-07-50.png
|
 |
| Attachment 5: Figure_2025-04-16_163405.png
|
 |
|
Draft
|
Tue Apr 14 08:03:01 2026 |
IC,VM | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Beam studies. preparation for 40 MeV | |
8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
10h Problem with modulator; It went to OFF and it does not start. Need help;
12h40 Fixed by Maher
12h42 HV is ON.
recipe_recipe_LI_TL_RI_all_20260410_18_30_00.txt loaded. Beam is in the ring with RF, all is OK
13h02 Energy = 50 MeV, Laser Phase 62 dg., Sect. Phase 222 dg., Sect. Att. 2.353 dB, I_Gun -84.0745 pC, I_Linac -110.6456 pC, I_TL -97.627 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.
==>40 MeV
recipe_recipe_LI_TL_RI_all_20260414_16_25_18.txt saved
16h36 Energy = 40.2 MeV, Laser Phase 66 dg., Sect. Phase 222 dg., Sect. Att. 3.974 dB, I_Gun -109.5905 pC, I_Linac -137.9429 pC, I_TL -118.206 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.
recipe_recipe_LI_TL_RI_all_20260414_16_37_59.txt saved. Flat orbits (both), good storage, small vert. size at EL/SST01
17h07 Energy = 40.2 MeV, Laser Phase 58 dg., Sect. Phase 214 dg., Sect. Att. 4.001 dB, I_Gun -119.9999 pC, I_Linac -147.2619 pC, I_TL -131.3768 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg. X =+2.5 mm
|
|
1186
|
Thu Jan 22 07:37:58 2026 |
IC, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Beam studies | |
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers)
08h41 HV is on
08h49 RF gun phase 152 dg., sect phase 208 dg. beam is in the ring W/O RF
08h58 Standby, Cycling all magnets
09h30 HV is on
12h47 Standby
12h58 HV is on
14h26 Laser phse jumped from 143 dg. to 261 dg. Ring RF cavity phase ==> -73.5 dg. from -15 dg.
16h40 Laser phse jumped from 257 dg. to 44 dg.Ring RF cavity phase ==> -15 dg. from 33 dg.
17h07 Laser phse jumped from 44 dg. to 218 dg. Ring RF cavity phase ==> -83.5 dg. from +33 dg.
18h13 HV is off, cycling ring quads
18h48 HV is on
22h01 Stop ThomX |
|
574
|
Mon Oct 3 20:31:09 2022 |
VK, AL, IC | Reference Solution | Shift summary | Ring Commissioning |
|
Beam is stored | |
Shift started at 18h
With the current injector settings, it was difficult to inject. We loaded the settings from last Friday 30/09 (19-22-04).
Principal steps:
- Correction of the one quadrupole polarity this morning
-injection tuning, observation of Turn-by-Turn-X, Turn-by-Turn-Y and Sum
-quads focusing, defocusing +-.0.5%
-iterative manual adjustments of corrctors, DPI, Septum, Kicker
-orbit correction with open line model response matrix
- several datasets taken for further postprocessing
Beam is stored !!!!! ~400 turns (limited by the Libera response)
Stored beam, visible more than 300 turns, signal decay as estimated due to Libera cutoff filters. To store more, RF cavity should be used.
Stable closed orbit!
Important milestone is achieved.
No losses at scintillator/fiber except for the injection, see oscilloscope screenshot.
Current machine settings are stored in recipe_recipe_LI_TL_RI_20221003_20_24_01.txt
Orbit is stable for more than one hour. End of the shift.
|
| Attachment 1: Screenshot_from_2022-10-03_20-34-31.png
|
 |
| Attachment 2: Screenshot_from_2022-10-03_20-27-05.png
|
 |
| Attachment 3: Screenshot_from_2022-10-03_20-26-19.png
|
 |
| Attachment 4: Storage_TbTsummary2_03102022.png
|
 |
| Attachment 5: Storage_TbTsummary1_03102022.png
|
 |
| Attachment 6: closed_orbit_03102022.png
|
 |
|
101
|
Fri Oct 8 16:59:37 2021 |
Entered by HG, SC et MO from 134.158.195.142 on Fri Oct 8 16:59:22 2021 | Under Process | Linac | Linac Commissionning |
|
BPMs | |
Travail sur les BPMs en cours |
|
130
|
Thu Oct 28 10:45:34 2021 |
Entered by sophie chance from 134.158.195.141 on Thu Oct 28 10:45:21 2021 | Fixed | Info | Diag |
|
BPMs | |
On visualise le faisceau sur les BPMs via l'interface BPM adc viewer |
|
139
|
Thu Oct 28 17:13:35 2021 |
Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:13:21 2021 | Under Process | Linac | Diag |
|
BPMs | |
Passage à 1 Hz pour transport faisceau avec bobine de foc pour test sur les BPMs en bougeant les steerers |
|
608
|
Wed Oct 26 14:13:16 2022 |
Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:13:01 2022 | | Urgent | Linac Commissionning |
|
BPM TL 2, 3 et 4 ? | |
Les BPM TL 2 3 et 4 ont l'air fige . Les valeurs sur 'ihm sont totalement figees ...
Tu peux verifier Nicolas Stp
|
|
560
|
Wed Sep 21 20:07:01 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 | | Shift summary | Linac Commissionning |
|
BPM LINAC + TL : dispersion tir a tir ? | |
Aujourd'hui Iriya m'a montre en salle de controle une "etendue" de ~4mm de l'orbite du faisceau mesuree sur le premier bpm de l'injection (celui appele bpm 2 je crois) sur une vingtaine de tirs. Ca semblait pareil pour 500 tirs, i.e. ~4 mm). C'est beaucoup ... (Iryna peut-etre pourrais-tu mettre ce que tu m'as montre dans le elog ?)
--> Ce que je suggere de faire des que possible (vu avec Hayg) : un script permettant de mesurer cette etendue de l'orbite tir a tir sur les 5 BPM LINAC + TL, pour voir si cette dispersion est presente qq part avant, ou bien si elle est creee seulement au niveau de l'injection.
Bonne soiree |
|
1154
|
Thu Nov 20 09:26:33 2025 |
VM, IC | Under Process | Urgent | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
BBA Ring | |
Goal: Ring BBA
09h14 Unable to start thomx. Need help. Probably problem with cooling water.
12h35 Warm-up the modulator, Chillers started
12h42 Cycling all magnets
12h57 It seems that leds at LI/SST1 and TL/SST1 are ON. . Fix. IHM ==>'Camera Power'==> 'Power 3'
13h42 HV is ON
14h06 Strange situation: the modulator works, but there are no radio frequency signals (see the screenshot).
15h46 Maher fix it. HV is ON
16h16 the modulator works, but there are no radio frequency signals
Need help from Maher to restart the pre-ampli.
16h34 Up to now, the beam was transported only till TL/SST.02. Very often we observed interlock (something happen in the IGLOO ?). After this probably the pre-ampli stopped operating. This is our observation. Moreover, several mistriggers.
For the RF cavity, there is the problem to set the Voltage. It can be done only manually by Mohamed.
The control of the iris thouth the ELLO com4 does not work. It says "COM4 not available".
Shift program even has not started.
16h54 STOP
|
| Attachment 1: Errors.jpeg
|
 |
| Attachment 2: Screenshot_from_2025-11-20_14-04-53.png
|
 |
|
Draft
|
Thu Sep 11 08:49:20 2025 |
IC, VM | | | Ring |
|
BBA | |
08h50 Warm up of the modulator |
|
Draft
|
Thu Sep 11 11:12:36 2025 |
IC, VM | | | Ring |
|
BBA | |
8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92 2.13]
11h00 Beam is in the ring. Receipt 70 MeV from references BPM TL2 X=-1 mm
11h30 HV went standby. Maher fixed it.
11h32 HV is 'ON'
BPM transmission does not work properly (see screenshot)
Good storage at 70 MeV with the receipt.
Laser phase adjustment during the shift a few times
Work on the BBA at 70 MeV
For this, measurement of the ORM. There is a differennce with the model ORM. Attempts to tune the ring from the model. Work should be continued.
Due to this, only manual BBA can be done at the moment.
Starting also to adress the manual BBA in the TL. We used HCOR2 and QP5 and TL BPM.03. The results are not clear (big element-to-element distances). To be continued.
18h STOP THOMX
|
| Attachment 1: Screenshot_from_2025-09-11_12-57-22.png
|
 |
| Attachment 2: Screenshot_from_2025-09-11_17-36-53.png
|
 |
| Attachment 3: Screenshot_from_2025-09-11_17-47-30.png
|
 |
|
1074
|
Wed May 21 12:16:11 2025 |
MJ HG | | Shift summary | Linac Commissionning |
|
Axes Q1Q3 et Section apres chang cathode | |
iris 0.5
100 pC
ph ch max 259
** Align SOLENO (courbe violette pj)
dtx 0.9645
dtz 3.3546
drx 10.5272
drz -4.2522
Ph -50
soleno 230
** Alignement Q1Q3 avec Q2=0
str1H 0.58
str1V -2.32
str2V 2.67
str2H -2.91
------ BPMs en mm -----
BPM X : 2.49165875 +/- 0.0264994214802
BPM Y : -1.58554115 +/- 0.0471457516329
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 196.0 +/- 32.9590655207
YAG Y : 301.8 +/- 1.12249721603
------ BPMs en mm -----
BPM X : -0.8536445 +/- 0.0224653251045
BPM Y : 0.13572405 +/- 0.0184326064258
=============================
------ BPMs en mm -----
BPM X : 2.47926945 +/- 0.0390444695309
BPM Y : -1.5873233 +/- 0.0378935718006
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 194.3 +/- 22.8365934412
YAG Y : 298.15 +/- 2.59374246987
------ BPMs en mm -----
BPM X : -0.85523945 +/- 0.0164860398807
BPM Y : 0.13411955 +/- 0.0205878360725
** Alignement Q1Q3 avec Q2=3.40
str1H 0.61
str1V -2.33
str2V 2.62
str2H -2.94
------ BPMs en mm -----
BPM X : 2.3799488 +/- 0.547166562882
BPM Y : -1.50053775 +/- 0.345440854739
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 391.45 +/- 0.497493718553
YAG Y : 260.85 +/- 0.572276157113
------ BPMs en mm -----
BPM X : -0.1347845 +/- 0.0147763972317
BPM Y : 0.3033404 +/- 0.0231588279526
==================================
------ BPMs en mm -----
BPM X : 2.50198645 +/- 0.0483311705284
BPM Y : -1.58757735 +/- 0.0292616993291
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 392.95 +/- 0.217944947177
YAG Y : 261.75 +/- 0.887411967465
------ BPMs en mm -----
BPM X : -0.15454465 +/- 0.0248612337109
BPM Y : 0.25563065 +/- 0.0172710036254
** Alignement SECTION - valeurs elog 1002
str1H 1.64
str1V -1.94
str2V 2.87
str2H -3.77
------ BPMs en mm -----
BPM X : 3.7212973 +/- 0.0321787746381
BPM Y : -1.1086051 +/- 0.035323561294
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 272.85 +/- 13.7886728876
YAG Y : 63.95 +/- 2.24666419387
------ BPMs en mm -----
BPM X : -1.40359675 +/- 0.0180544044346
BPM Y : 3.44180095 +/- 0.0179048640807
=====================================
------ BPMs en mm -----
BPM X : 3.73180015 +/- 0.0385873207716
BPM Y : -1.103907 +/- 0.031825702561
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 273.3 +/- 9.61821189203
YAG Y : 65.0 +/- 3.25576411922
------ BPMs en mm -----
BPM X : -1.44032525 +/- 0.0264990471317
==========================================
** Affinage alignement horizontal section
str1H 1.0
str1V -1.94
str2V 2.87
str2H -3.5
phas section de 208 a 254 ==> bouge de 1/2 carreau sur le yagtl1
------ BPMs en mm -----
BPM X : 2.99469935 +/- 0.0349682538158
BPM Y : -1.1059392 +/- 0.0299572389909
------------- TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 214.25 +/- 1.9461500456
YAG Y : 38.6 +/- 11.1462998345
------ BPMs en mm -----
BPM X : -2.7490436 +/- 0.0227112488283
BPM Y : 3.96375725 +/- 0.023805124412
Nouvelles mesures 22 mai
Essai 1
------------- LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 0.0
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4632059 +/- 0.0316530005069
BPM Y : -1.6726479 +/- 0.0265819058438
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 369.257120833 +/- 1.56616565007
YAG Y : 273.547982641 +/- 0.683787323708
------ YAG Max proj. Pixels -----
YAG X : 334.3 +/- 2.96816441593
YAG Y : 271.1 +/- 2.66270539114
------ BPMs en mm -----
BPM X : -0.1525054 +/- 0.0236681262596
BPM Y : -0.0879924 +/- 0.0200531052269
Essai 2 (pour Xcheck)
------------- LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 2.84217094304e-14
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4823413 +/- 0.0608051287237
BPM Y : -1.65147505 +/- 0.0539867056102
------------- TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 364.379556839 +/- 1.46350878787
YAG Y : 272.024693198 +/- 1.50274460733
------ YAG Max proj. Pixels -----
YAG X : 329.95 +/- 4.25998826289
YAG Y : 266.85 +/- 2.26439837484
------ BPMs en mm -----
BPM X : -0.1913847 +/- 0.0317457400782
BPM Y : -0.08146295 +/- 0.0201487667773
STR1 = [0.59, -2.40]
STR2 = [-2.89, 2.68] |
| Attachment 1: Sole_Align.png
|
 |
|
237
|
Mon Jan 10 09:27:14 2022 |
Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 | | Fix | Diag | CC | Linac Commissionning |
|
Automatique "health check" | |
Allumage de client 5. Pourquoi était-il éteint sachant qu'il y a des ds qui doivent tourner dessus ?
Lancement du processus de mise a jour automatique de l'état de la machine (health_check) sur client 5.
En cas de soucis le bouton "Force update" permet de lancer une procédure de verification de l'état de la machine manuellement.
(Un pull sur /data/sharde/... a été fait pour prendre en compte de très vieille modification de l'IHM)
Démarrage du ds CALC pour les mesures de charge (CALC/ICT/Charge_...)
Erreur vanne jauge aquité
WaveCatcher en état FAULT -> Discussion avec Irayna et Slava pour les remettrent en état.
Le seul autre equipement avec un "problème" est le laser qui est éteint. Viktor est la est doit l'allumer. |
|
42
|
Mon Jun 28 11:45:12 2021 |
Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Attenuations |
|
RF attenuations :
-
GUN (Maximun atténuation) Limite Hard = 1667 steps
-
Section (Minimum attenuation = 0 steps)
Notez la limite maximul d'attenuation. Les valeurs calibrées s'arretent avant. |
| Attachment 1: AttenuationCalibrationCurves.png
|
 |
| Attachment 2: Attenuation_sets.png
|
 |
|
838
|
Thu Feb 1 11:50:28 2024 |
MJ | Not Fixed | Shift summary | LI | TL | LE | Ring | Linac Commissionning |
|
Attenuateur LIL / Puissance LIL / Energie electrons | |
La puissance entree canon a ete verifie et conforme a l'atterndu (6 MW = 18/3 MW)
Avec l'attenuateur a 2 db, le power meter dans la casemate affiche 9 mW entree LIL.
--> Le faisceau est detecte sur BPMTL2 et sur YAGTL2 pour I_DIPOLE = 143 A ce qui, avec les caracteristique du dipole, correspond a une energie sortie section de 45.5 MeV |
|
110
|
Mon Oct 11 18:04:35 2021 |
Entered by Super Team from 134.158.195.142 on Mon Oct 11 18:04:10 2021 | Fixed | Other | Linac Commissionning |
|
Arręt faisceau | |
|
|
146
|
Fri Oct 29 15:53:12 2021 |
Entered by sophie chance from 134.158.195.142 on Fri Oct 29 15:52:55 2021 | Fixed | Info | Linac Commissionning |
|
Arręt faisceau | |
Arrêt modulateur, arrêt faisceau |
|
418
|
Thu Mar 24 17:26:38 2022 |
Entered by Super Team from 134.158.195.142 on Thu Mar 24 17:26:25 2022 | Fixed | Linac | Linac Commissionning |
|
Arręt faisceau | |
|