  637   Thu Dec 1 01:14:36 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022New SolutionShift summaryRing | Diag Beam time / Thursday 1st December 

9:10 Il y a quelqu'un de DEKRA qui deambule seul dans l'IGLEX sans dosimetre. A-t-il ete prevenu du risque?

9:15: La console operateur etait laissee ouverte avec de nombreuses fenetres ouvertes...

9:18 Resistivite eau: 5.5 Mo

Pression air comprime 7 bars.

9:20 Mise en chauffe de modulateur

Heath check OK

9:40 Cyclage aimants

10:40 Beam on

10:53 Scan charge vs phase. Cf plots joints

10:56 Chargement recette test_20221130_17_33_59 ne passe pas la cavite

11:10 Faisceau non trouve dans TL/SST.02

Temperature chiller elevee

11:20 La phase a change

11:30 Realignement mirroir par Viktor.

Cavite desaccordee

11:49 Mise du modulateur en standby

=> attente 30 minutes

11:49 Mohamed a confirme que la cavite RF anneau est detune pour permettre les operations anneau.

11:50 Jean Noel accede a la casemate.

12:15 Scan charge phase demare

12:25 Nouvelle phase charge max: 175

Des claquages pendant le scan.

12:31 Faisecau sur TL/DG/SST1

12:32 Chargement recette test_20221130_17_33_59

12:40  faisceau sur TL/DG/SST.02

Recherche phase section

Charge max LI/DG/ICT.01 > 100pC => Attenuateur laser a 341mm

13:01 Phase section: 95

13:05 Faisceau sur TL/DG/SST.03

Start EP

13:08 Recette sauvee dans all_20221201_13_08

15:35 Modulator crashed + recovered

16:55 Phase section 93. Scan tres bruyant

Difficultes a injecter dans l' anneau.

17:35 Injection dans l 'anneau retrouvee

===

Plan for the beam time:

1) Re-establish transport to the ring

2) Inject in the ring

3) Save ring recipe

4) Check BPMs in AGC mode

5) Check screens calibration

6) Changement mesure taille SST

Attachment 1: health_check.png
health_check.png
Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_51_43.png
scan_charge_phase_min_0.0_max_360.0_10_51_43.png
Attachment 3: scan_charge_phase_min_140.0_max_220.0_10_53_7.png
scan_charge_phase_min_140.0_max_220.0_10_53_7.png
Attachment 4: scan_charge_phase_min_160.0_max_240.0_11_21_32.png
scan_charge_phase_min_160.0_max_240.0_11_21_32.png
Attachment 5: Screenshot_from_2022-12-01_11-48-20.png
Screenshot_from_2022-12-01_11-48-20.png
Attachment 6: Screenshot_from_2022-12-01_12-16-00.png
Screenshot_from_2022-12-01_12-16-00.png
Attachment 7: dispersion_13_3_31.png
dispersion_13_3_31.png
Attachment 8: dispersion_16_54_28.png
dispersion_16_54_28.png
Attachment 9: dispersion_17_24_54.png
dispersion_17_24_54.png
Attachment 10: dispersion_17_28_14.png
dispersion_17_28_14.png
Attachment 11: quad_scan_tl_dg_sst.03_20221201_16_3x.png
quad_scan_tl_dg_sst.03_20221201_16_3x.png
  1057   Wed Apr 16 13:48:05 2025 Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025Under ProcessShift summaryLI Beam study  

Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du faisceau.
 

 

2 alignements :

Alignement : triplet quads

ST1[H,V] = [0.75 , -2.36]
ST2[H,V] = [-2.91 , 2.68]

Alignement Section : Post ID 1002 

str1H 1.64
str1V -1.94
str2H -3.77
str2V 2.87

1 - nous avons verifié notre point de fonctionnement, via un soleno scan pour differents alignements. Le vertical a toujours un soucis à basse valeur de soleno. La variation de l'iris ne change pas le soucis.

2- Quad Scan : nouveau script pour sauvegarder les images. Quad_scan_save_img.py : données pour alignement section

 

17:30 fin

 

 

 

Attachment 1: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.png
Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.png
Attachment 2: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.png
Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.png
Attachment 3: Size_vs_SolenoScan_14-07-49.png
Size_vs_SolenoScan_14-07-49.png
Attachment 4: Q_vs_SolenoScan_14-07-50.png
Q_vs_SolenoScan_14-07-50.png
Attachment 5: Figure_2025-04-16_163405.png
Figure_2025-04-16_163405.png
  Draft   Tue Apr 14 08:03:01 2026 IC,VM Shift summaryLinac Commissionning | Ring Commissioning Beam studies. preparation for 40 MeV 

8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

10h Problem with modulator; It went to OFF and it does not start. Need help;

12h40 Fixed by Maher

12h42 HV is ON.

 recipe_recipe_LI_TL_RI_all_20260410_18_30_00.txt loaded. Beam is in the ring with RF, all is OK

13h02 Energy = 50 MeV, Laser Phase 62 dg., Sect. Phase 222 dg., Sect. Att. 2.353 dB, I_Gun -84.0745 pC, I_Linac -110.6456 pC, I_TL -97.627 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.

==>40 MeV

recipe_recipe_LI_TL_RI_all_20260414_16_25_18.txt saved

16h36 Energy = 40.2 MeV, Laser Phase 66 dg., Sect. Phase 222 dg., Sect. Att. 3.974 dB, I_Gun -109.5905 pC, I_Linac -137.9429 pC, I_TL -118.206 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.

recipe_recipe_LI_TL_RI_all_20260414_16_37_59.txt saved. Flat orbits (both), good storage, small vert. size at EL/SST01

17h07 Energy = 40.2 MeV, Laser Phase 58 dg., Sect. Phase 214 dg., Sect. Att. 4.001 dB, I_Gun -119.9999 pC, I_Linac -147.2619 pC, I_TL -131.3768 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg. X =+2.5 mm
 


 

 

  1186   Thu Jan 22 07:37:58 2026 IC, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Beam studies 

7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers)

08h41 HV is on

08h49 RF gun phase 152 dg., sect phase 208 dg. beam is in the ring W/O RF

08h58 Standby, Cycling all magnets

09h30 HV is on

12h47 Standby

12h58 HV is on

14h26 Laser phse jumped from 143 dg. to 261 dg. Ring RF cavity phase ==> -73.5 dg. from -15 dg.

16h40 Laser phse jumped from 257 dg. to 44 dg.Ring RF cavity phase ==> -15 dg. from 33 dg.

17h07 Laser phse jumped from 44 dg. to 218 dg. Ring RF cavity phase ==> -83.5 dg. from +33 dg.

18h13 HV is off, cycling ring quads

18h48 HV is on

22h01 Stop ThomX

  574   Mon Oct 3 20:31:09 2022 VK, AL, ICReference SolutionShift summaryRing Commissioning Beam is stored 

Shift started at 18h

With the current injector settings, it was difficult to inject.  We loaded the settings from last Friday 30/09 (19-22-04).

 

Principal steps:

- Correction of the one quadrupole polarity this morning

-injection tuning, observation of Turn-by-Turn-X, Turn-by-Turn-Y and Sum

-quads focusing, defocusing +-.0.5%

-iterative manual adjustments of corrctors, DPI, Septum, Kicker

-orbit correction with open line model response matrix 

- several datasets taken for further postprocessing

 

Beam is stored !!!!! ~400 turns (limited by the Libera response)

 

Stored beam, visible  more than 300 turns,  signal decay as estimated  due to Libera cutoff filters. To store more, RF cavity should be used.

Stable closed orbit!

Important milestone is achieved.

No losses at scintillator/fiber except for the injection, see oscilloscope screenshot.

Current machine settings are stored in recipe_recipe_LI_TL_RI_20221003_20_24_01.txt

Orbit is stable for more than one hour. End of the shift.

 

 

 

Attachment 1: Screenshot_from_2022-10-03_20-34-31.png
Screenshot_from_2022-10-03_20-34-31.png
Attachment 2: Screenshot_from_2022-10-03_20-27-05.png
Screenshot_from_2022-10-03_20-27-05.png
Attachment 3: Screenshot_from_2022-10-03_20-26-19.png
Screenshot_from_2022-10-03_20-26-19.png
Attachment 4: Storage_TbTsummary2_03102022.png
Storage_TbTsummary2_03102022.png
Attachment 5: Storage_TbTsummary1_03102022.png
Storage_TbTsummary1_03102022.png
Attachment 6: closed_orbit_03102022.png
closed_orbit_03102022.png
  101   Fri Oct 8 16:59:37 2021 Entered by HG, SC et MO from 134.158.195.142 on Fri Oct 8 16:59:22 2021Under ProcessLinacLinac Commissionning BPMs 

Travail sur les BPMs en cours

  130   Thu Oct 28 10:45:34 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 10:45:21 2021FixedInfoDiag BPMs 

On visualise le faisceau sur les BPMs via l'interface BPM adc viewer

  139   Thu Oct 28 17:13:35 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:13:21 2021Under ProcessLinacDiag BPMs 

Passage à 1 Hz pour transport faisceau avec bobine de foc pour test sur les BPMs en bougeant les steerers

  608   Wed Oct 26 14:13:16 2022 Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:13:01 2022 UrgentLinac Commissionning BPM TL 2, 3 et 4 ? 

Les BPM TL 2 3 et 4 ont l'air fige . Les valeurs sur 'ihm sont totalement figees ...

Tu peux verifier Nicolas Stp

 

  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? 

Aujourd'hui Iriya m'a montre en salle de controle une "etendue" de ~4mm de l'orbite du faisceau mesuree sur le premier bpm de l'injection (celui appele bpm 2 je crois) sur une vingtaine de tirs. Ca semblait pareil pour 500 tirs, i.e. ~4 mm). C'est beaucoup ... (Iryna peut-etre pourrais-tu mettre ce que tu m'as montre dans le elog ?)

--> Ce que je suggere de faire des que possible (vu avec Hayg) : un script permettant de mesurer cette etendue de l'orbite tir a tir sur les 5 BPM LINAC + TL, pour voir si cette dispersion est presente qq part avant, ou bien si elle est creee seulement au niveau de l'injection.

Bonne soiree

  1154   Thu Nov 20 09:26:33 2025 VM, ICUnder ProcessUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning BBA Ring 

Goal: Ring BBA

09h14 Unable to start thomx. Need help. Probably problem with cooling water.

12h35 Warm-up the modulator, Chillers started

12h42 Cycling all magnets

12h57 It seems that leds at LI/SST1 and TL/SST1 are ON. icon8.gif. Fix. IHM ==>'Camera Power'==> 'Power 3'

13h42 HV is ON

14h06 Strange situation: the modulator works, but there are no radio frequency signals (see the screenshot).

15h46 Maher fix it. HV is ON

16h16 the modulator works, but there are no radio frequency signals

Need help from Maher to restart the pre-ampli.

16h34 Up to now, the beam was transported only till TL/SST.02. Very often we observed interlock (something happen in the IGLOO ?). After this probably the pre-ampli stopped operating. This is our observation. Moreover, several mistriggers.

For the RF cavity, there is  the problem to set the Voltage. It can be done only manually by Mohamed.

The control of the iris thouth the ELLO com4 does not work. It says "COM4 not available".

Shift program even has not started.

16h54 STOP

 

 

 

 

 

 

Attachment 1: Errors.jpeg
Errors.jpeg
Attachment 2: Screenshot_from_2025-11-20_14-04-53.png
Screenshot_from_2025-11-20_14-04-53.png
  Draft   Thu Sep 11 08:49:20 2025 IC, VM  Ring BBA 

08h50 Warm up of the modulator

  Draft   Thu Sep 11 11:12:36 2025 IC, VM  Ring BBA 

8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92 2.13]

11h00 Beam is in the ring. Receipt 70 MeV from references BPM TL2 X=-1 mm

11h30 HV went standby. Maher fixed it.

11h32 HV is 'ON'

BPM transmission does not work properly (see screenshot)

Good storage at 70 MeV with the receipt.

Laser phase adjustment during the shift a few times

Work on the BBA at 70 MeV

For this, measurement of the ORM. There is a differennce with the model ORM. Attempts to tune the ring from the model. Work should be continued.

Due to this, only manual BBA can be done at the moment.

Starting also to adress the manual BBA in the TL. We used HCOR2 and QP5 and TL BPM.03. The results are not clear (big element-to-element distances). To be continued.

18h STOP THOMX

 

Attachment 1: Screenshot_from_2025-09-11_12-57-22.png
Screenshot_from_2025-09-11_12-57-22.png
Attachment 2: Screenshot_from_2025-09-11_17-36-53.png
Screenshot_from_2025-09-11_17-36-53.png
Attachment 3: Screenshot_from_2025-09-11_17-47-30.png
Screenshot_from_2025-09-11_17-47-30.png
  1074   Wed May 21 12:16:11 2025 MJ HG Shift summaryLinac Commissionning Axes Q1Q3 et Section apres chang cathode 

iris 0.5
100 pC
ph ch max 259

** Align SOLENO (courbe violette pj)

dtx 0.9645
dtz 3.3546
drx 10.5272
drz -4.2522

Ph -50
soleno 230

** Alignement Q1Q3 avec Q2=0

str1H 0.58
str1V -2.32
str2V 2.67
str2H -2.91

------ BPMs en mm -----
BPM X : 2.49165875 +/- 0.0264994214802
BPM Y : -1.58554115 +/- 0.0471457516329
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 196.0 +/- 32.9590655207
YAG Y : 301.8 +/- 1.12249721603
------ BPMs en mm -----
BPM X : -0.8536445 +/- 0.0224653251045
BPM Y : 0.13572405 +/- 0.0184326064258

=============================

------ BPMs en mm -----
BPM X : 2.47926945 +/- 0.0390444695309
BPM Y : -1.5873233 +/- 0.0378935718006
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 194.3 +/- 22.8365934412
YAG Y : 298.15 +/- 2.59374246987
------ BPMs en mm -----
BPM X : -0.85523945 +/- 0.0164860398807
BPM Y : 0.13411955 +/- 0.0205878360725

** Alignement Q1Q3 avec Q2=3.40

str1H 0.61
str1V -2.33
str2V 2.62
str2H -2.94

------ BPMs en mm -----
BPM X : 2.3799488 +/- 0.547166562882
BPM Y : -1.50053775 +/- 0.345440854739
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 391.45 +/- 0.497493718553
YAG Y : 260.85 +/- 0.572276157113
------ BPMs en mm -----
BPM X : -0.1347845 +/- 0.0147763972317
BPM Y : 0.3033404 +/- 0.0231588279526

==================================

------ BPMs en mm -----
BPM X : 2.50198645 +/- 0.0483311705284
BPM Y : -1.58757735 +/- 0.0292616993291
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 392.95 +/- 0.217944947177
YAG Y : 261.75 +/- 0.887411967465
------ BPMs en mm -----
BPM X : -0.15454465 +/- 0.0248612337109
BPM Y : 0.25563065 +/- 0.0172710036254

** Alignement SECTION - valeurs elog 1002 

str1H 1.64
str1V -1.94
str2V 2.87
str2H -3.77

------ BPMs en mm -----
BPM X : 3.7212973 +/- 0.0321787746381
BPM Y : -1.1086051 +/- 0.035323561294
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 272.85 +/- 13.7886728876
YAG Y : 63.95 +/- 2.24666419387
------ BPMs en mm -----
BPM X : -1.40359675 +/- 0.0180544044346
BPM Y : 3.44180095 +/- 0.0179048640807

=====================================

------ BPMs en mm -----
BPM X : 3.73180015 +/- 0.0385873207716
BPM Y : -1.103907 +/- 0.031825702561
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 273.3 +/- 9.61821189203
YAG Y : 65.0 +/- 3.25576411922
------ BPMs en mm -----
BPM X : -1.44032525 +/- 0.0264990471317

==========================================

** Affinage alignement horizontal section

str1H 1.0
str1V -1.94
str2V 2.87
str2H -3.5

phas section de 208 a 254 ==> bouge de 1/2 carreau sur le yagtl1

------ BPMs en mm -----
BPM X : 2.99469935 +/- 0.0349682538158
BPM Y : -1.1059392 +/- 0.0299572389909
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 214.25 +/- 1.9461500456
YAG Y : 38.6 +/- 11.1462998345
------ BPMs en mm -----
BPM X : -2.7490436 +/- 0.0227112488283
BPM Y : 3.96375725 +/- 0.023805124412

 

Nouvelles mesures 22 mai

Essai 1

-------------  LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 0.0
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4632059 +/- 0.0316530005069
BPM Y : -1.6726479 +/- 0.0265819058438
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 369.257120833 +/- 1.56616565007
YAG Y : 273.547982641 +/- 0.683787323708
------ YAG Max proj. Pixels -----
YAG X : 334.3 +/- 2.96816441593
YAG Y : 271.1 +/- 2.66270539114
------ BPMs en mm -----
BPM X : -0.1525054 +/- 0.0236681262596
BPM Y : -0.0879924 +/- 0.0200531052269

 

Essai 2 (pour Xcheck)

-------------  LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 2.84217094304e-14
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4823413 +/- 0.0608051287237
BPM Y : -1.65147505 +/- 0.0539867056102
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 364.379556839 +/- 1.46350878787
YAG Y : 272.024693198 +/- 1.50274460733
------ YAG Max proj. Pixels -----
YAG X : 329.95 +/- 4.25998826289
YAG Y : 266.85 +/- 2.26439837484
------ BPMs en mm -----
BPM X : -0.1913847 +/- 0.0317457400782
BPM Y : -0.08146295 +/- 0.0201487667773

 

STR1 = [0.59, -2.40]

STR2 = [-2.89, 2.68]

Attachment 1: Sole_Align.png
Sole_Align.png
  237   Mon Jan 10 09:27:14 2022 Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 FixDiag | CC | Linac Commissionning Automatique "health check" 

Allumage de client 5. Pourquoi était-il éteint sachant qu'il y a des ds qui doivent tourner dessus ?

Lancement du processus de mise a jour automatique de l'état de la machine (health_check) sur client 5.
En cas de soucis le bouton "Force update" permet de lancer une procédure de verification de l'état de la machine manuellement.

(Un pull sur /data/sharde/... a été fait pour prendre en compte de très vieille modification de l'IHM)

Démarrage du ds CALC pour les mesures de charge (CALC/ICT/Charge_...)

Erreur vanne jauge aquité

WaveCatcher en état FAULT -> Discussion avec Irayna et Slava pour les remettrent en état.

Le seul autre equipement avec un "problème" est le laser qui est éteint. Viktor est la est doit l'allumer.

  42   Mon Jun 28 11:45:12 2021 Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021Under ProcessLinacRF D1 | Linac Commissionning Attenuations icon1.gif 

RF attenuations :

  • GUN (Maximun atténuation) Limite Hard = 1667 steps

  • Section (Minimum attenuation = 0 steps)

Notez la limite maximul d'attenuation. Les valeurs calibrées s'arretent avant.
Attachment 1: AttenuationCalibrationCurves.png
AttenuationCalibrationCurves.png
Attachment 2: Attenuation_sets.png
Attenuation_sets.png
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons 

La puissance entree canon a ete verifie et conforme a l'atterndu (6 MW = 18/3 MW)

Avec l'attenuateur a 2 db, le power meter dans la casemate affiche 9 mW entree LIL.

--> Le faisceau est detecte sur BPMTL2 et sur YAGTL2 pour I_DIPOLE = 143 A ce qui, avec les caracteristique du dipole, correspond a une energie sortie section de 45.5 MeV

  110   Mon Oct 11 18:04:35 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 18:04:10 2021FixedOtherLinac Commissionning Arręt faisceau 
  146   Fri Oct 29 15:53:12 2021 Entered by sophie chance from 134.158.195.142 on Fri Oct 29 15:52:55 2021FixedInfoLinac Commissionning Arręt faisceau 

Arrêt modulateur, arrêt faisceau

  418   Thu Mar 24 17:26:38 2022 Entered by Super Team from 134.158.195.142 on Thu Mar 24 17:26:25 2022FixedLinacLinac Commissionning Arręt faisceau 