  Toutes les notes concernant les Commissionning de ThomX, Page 51 of 62  Not logged in ThomX    logo
Entry   Entered by Viktor Soskov from 134.158.195.153 on Wed Oct 26 10:33:09 2022; Camera Laser  
Entry   Entered by Viktor Soskov from 134.158.195.153 on Fri Jan 21 10:36:38 2022; Camera Laser 
Entry   Entered by sophie chance from 134.158.195.144 on Fri Oct 1 10:29:37 2021; Calibration image cathode laser  
Entry   Entered by Vincent Chaumat from 134.158.76.115 on Tue Sep 10 08:29:15 2024; Cablage Repitaya Baie 17 
Entry   Entered by sophie chance from 134.158.206.40 on Fri Nov 26 15:37:41 2021; CR Reunion planning Linac ThomX Réunion_planning_ThomX_261121.pptx
Entry   Entered by sophie chance from 86.246.158.218 on Thu Dec 9 12:58:47 2021; CR Reunion planning Linac ThomX 
Entry   Entered by sophie chance from 83.202.31.199 on Fri Feb 4 15:43:17 2022; CR Reunion planning Linac ThomX 
icon8.gif   CB/JNC/SC/MO; CONTROLE A DISTANCE STRICTEMENT INTERDIT 
Entry   Entered by sophie chance from 134.158.195.144 on Fri Oct 1 12:41:43 2021; Butée moteur déphaseur 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023; Bruit de fond diodes ligneX 2023-06-22-bruit-de-fond-diodes-ligneX.pdf
Entry   Entered by Christelle Bruni from 82.64.20.144 on Sat Oct 9 11:26:55 2021; Bilan du 8 octobre bilan_08102021.pptx
Entry   Entered by Christelle Bruni from 82.64.20.144 on Fri Jun 25 16:35:00 2021; Bilan du 25 juin 2021 : commissioning linac 
Entry   Entered by Moutardier Alexandre from 134.158.195.142 on Thu Sep 8 20:47:07 2022; Bilan des test avec feuille phosphorescente 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 18 19:03:13 2022; Besoin urgent de mesures BPM LI et TL1 fiables 2022-10-18-BPM-YAG-STR.pdf
Entry   SC-VC-HG-ND-IC-VM-VK; Beam transport up to the ring 8x
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022; Beam time / Thursday 1st December 11x
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
Entry   IC,VM; Beam studies. preparation for 40 MeV 
Entry   IC, VM; Beam studies 
Entry   VK, AL, IC; Beam is stored 6x