Entry   Ring team; Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 8x
50 MeV

Configuration: good_20250123_17_53_01 "Working Point at 50 MeV for X_rays"

After RCDS optimization with X-rays good_20250124_15_05_25 "Updated WP with RCDS on X-rays 50 MeV "
Entry   MV, IC, VK, RC;  
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK, RC;  Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   ND, VC, HG, MJ; Test demarrage 10/02 7x
9:37 Mise en chauffe

Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.

Pression SF6: 2938mbar
Entry   ND, Marie Labat; Streak camera 20250211_173802.jpg20250211_174708.jpg
9:20 Start aligning

12:40 Alignement done for both linac and ring.

Health check: Archiving not working
Entry   KD MJ; shift du 12 février 2025 - Alignements 2025-02-12-Shift.pngaxes_BPM_calib.jpgaxes_BPM_nocalib.jpg
8h: mise en chauffe à distance (modulateur, frigo, chiller, laser)

9h30: laser semble pas aligné dans l'iris avec une forme assez étrange (trou au centre) ==> énergie sortie laser
PC 270uJ
Entry   ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV 20x
8h50 Mise en chauffe modulateur

Changement de la carte mère pour la badgeuse de la ligne X

31.2degres, toujours dAlignement laser dans la casemate
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;  
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)
Entry   VM, IC, VK; 70 MeV WP 
10h30 Start beam

Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason
is not found. Help is needed: synchronization/Diag/Magnets.
Entry   VC, KD, VM, ND, RC, MJ; shift  Screenshot_from_2025-02-18_17-52-13.pngScreenshot_from_2025-02-18_17-51-17.pngScreenshot_from_2025-02-18_17-49-55.pngScreenshot_from_2025-02-18_17-58-05.pngScreenshot_from_2025-02-18_17-59-46.png
demarrage machine 8h30

intervention Kicker.. 8h45 

10H30 fin intervention Kicker Ok
Entry   Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;  
08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11H changement de la carte synchro... Carte synchro opérationnel
Entry   shift screw; Rustine pour le probleme CEM kicker - ring storage - Xrays storage_et_Xrays_2025-02-19_19-01-58.pngdet2diodes_pb_voie4_2025-02-19_19-16-07.png
Cable ventilo kicker debranche ==> aucun effet
Cable balise blinde ==> la balise redevient calme

Redemarrage
Entry   Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025;  6x
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling all magnets

11h23 HV is 'On'
Entry   shift crew; shift du 21 février 2025 6x
8h30 : démarrage machine en remote (modulateur, laser, chiller/frigo, cyclage)

Nouveau pb : variation du flux X lente
incomprehensible car cavite lockee et electrons stockes.
Entry   KD VC VM; shift du 24 février 2025 
8h: mise en chauffe de la machine (Frigo/chiller, laser, modulateur et cyclage aimants).

9H demarrage faisceau

Charge gun 110pC
Entry   KD; shift du 25 février 2025 Charge_Drop.png
8h10: mise en chauffe machine en remote (Frigo/chiller, modulateur, laser, cyclage aimants)

injection dans linac demarrage du feedback linac
Q linac 100pC
Entry   Entered by Marie Jacquet from 88.165.97.136 on Tue Feb 25 22:59:29 2025; 24 -25 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science 
Commissioning det Photonic Science

** Depose Dectris, mise en place Photonic, alignement du det

** Comprehension binning hardware/software
Entry   KD; shift du 26 février 2025 
7h30: mise en chauffe en remote (Modulateur, frigo/chiller, laser, cyclage aimants)

8h35 HV is 'On'
base recipe all_2025225_14_52_23
Entry   Entered by Marie Jacquet from 88.165.97.136 on Wed Feb 26 22:50:49 2025; 26 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science  
Suite du commissioning det Photonic Science

** fantome "TO-MTF" (modulation transfer function) ==> fin de la
prise de donnees = mesure du flux absolu diode calibree avec et sans PMMA
Entry   KD, VM, SK, ND; shift du 27 février 2025 12x
7h45: mise en chauffe en remote (Frigo/chiller, laser, cyclage aimants)

Le Modulateur ne répond pas et ne veut pas passer en STANDBY ==> need to go on site

Problème d'intelock sur le refroidissement d'eau ==> redémarrage du PC modulateur ==> problème résolu