825
|
Tue Dec 12 12:48:58 2023 |
Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 | | Info | SY |
|
Changement de frequence linac | | Suite discussion avec Jean-Boel et Vincent,
la frequence linac a ete remise a 2998550000Hz
(nominal). |
|
|
415
|
Thu Mar 24 10:34:15 2022 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022 | Fixed | Fix | Infra | Linac Commissionning |
|
config clefs PSS | | Operateurs: VC, SC, ND
Pour memoire, cf photo... |
|
|
414
|
Thu Mar 24 09:44:28 2022 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 09:43:47 2022 | Fixed | Shift summary | Diag | CC | RF D1 |
|
Mesures 24/3/2022 | | Operateurs: ND, VC, SC
===
|
|
|
991
|
Thu Jan 9 10:31:11 2025 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025 | Not Fixed | Problem | CC |
|
DS ThomX_PhotoCathode using a lot of CPU | | The load on client5 is 29 making all operations
slow.
Appently the DS ThomX_PhotoCathode |
 |
|
963
|
Fri Nov 15 12:13:42 2024 |
Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024 | Not Fixed | Info | TL |
|
Charge excess in the TL | | By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached |
 |
|
821
|
Tue Nov 21 14:29:01 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 | | Shift summary | Diag |
|
Prise de donnees 21/11 | | 13:57 Mise en chauffe
15:00 Faisecau
Tests sur les ecrans |
|
|
680
|
Thu Feb 16 10:52:11 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:51:56 2023 | Fixed | Info | Linac Commissionning |
|
Health check | | Les erreurs severes dans health check
ont ete resolues.
La plupart etaient solvable en |
|
|
696
|
Fri Feb 24 16:24:15 2023 |
Entered by Nicolas Delerue from 134.158.195.142 on Fri Feb 24 16:24:00 2023 | Fixed | Shift summary | Diag |
|
Shift 24/2 | | 13:30 Mise en chauffe
14:30 Demarrage faisecau
Test de modifications de diverses |
|
|
987
|
Fri Dec 20 14:00:06 2024 |
Entered by Nicolas Delerue from 134.158.195.142 on Fri Dec 20 13:59:52 2024 | Not Fixed | Problem | Infra |
|
Alarme sur les rondes | | A 13h30 j'ai tent'e de faire un
acces controle dans la casemate.
Quand j'ai pris la 1ere clef |
|
|
243
|
Tue Jan 11 19:30:19 2022 |
Entered by Nicolas Delerue from 134.158.195.141 on Tue Jan 11 19:30:03 2022 | Fixed | Fix | SY |
|
Pb declenchement scope synchro | | La frequence des diags etait reglee a 0.1Hz
et le scope de la salle de controle se declenchait
sur les diags. C'est pour cela que le |
|
|
417
|
Thu Mar 24 17:12:01 2022 |
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022 | Reference Solution | Linac | Linac Commissionning |
|
Paramètres Faisceau | | Alignement laser
On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon |
|
|
416
|
Thu Mar 24 15:41:18 2022 |
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 15:41:04 2022 | Fixed | Linac | Linac Commissionning |
|
Alignement laser | | Position moteur M4 avant alignement laser
:
x = 380 et y = 5373 |
 |
|
484
|
Tue Jun 21 09:58:30 2022 |
Entered by ND/SC from 134.158.195.141 on Tue Jun 21 09:58:15 2022 | Under Process | Linac | Aimants |
|
Demarrage et faisceau | | 9h45 Mise en chauffe modulateur. Test interface
générale Nicolas pour l'allumage
du modulateur. |
12x |
|
487
|
Fri Jun 24 11:11:58 2022 |
Entered by ND/SC from 134.158.195.141 on Tue Jun 21 09:58:15 2022 | Under Process | Linac | Aimants |
|
RE: Demarrage et faisceau | | La même chose avec le signal des
BPM en plus.
|
 |
|
472
|
Tue Jun 7 09:53:01 2022 |
Entered by ND/JNC/VC/VS/MO/SC from 134.158.195.141 on Tue Jun 7 09:52:47 2022 | Under Process | Linac | Linac Commissionning |
|
Etat des lieux | | Presents: SC, ND, JNC, VS, MO
Fermeture casemate
Tests des DSs en cours |
|
|
5
|
Tue Dec 1 09:57:09 2020 |
Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020 | | Info | resumes |
|
Verrification pour le démarrage a blanc | | Verification de l'état de la
Synchro : OK, tout les signaux sont en trigger
externe. |
|
|
223
|
Thu Dec 16 14:58:50 2021 |
Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 14:58:26 2021 | | Problem | Aimants | Linac Commissionning |
|
Alimentation en état FAULT !!! | | D'après health_check toutes
les alimentations electrique des solenoides,
deviateur et quadrupole sont en état |
|
|
221
|
Thu Dec 16 10:40:03 2021 |
Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 | | Info | CC |
|
test en ssh | | Connection ssh sur client4 pour tester
une modification de health_check |
|
|
222
|
Thu Dec 16 14:57:31 2021 |
Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 | | Info | CC |
|
RE: test en ssh | | Modifications faites, testées et
fonctionnelles.
|
|
|
237
|
Mon Jan 10 09:27:14 2022 |
Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 | | Fix | Diag | CC | Linac Commissionning |
|
Automatique "health check" | | Allumage de client 5. Pourquoi était-il
éteint sachant qu'il y a des ds
qui doivent tourner dessus ? |
|