  Toutes les notes concernant les Commissionning de ThomX, Page 63 of 63  Not logged in ThomX    logo
ID Date Authordown Status Type Category Important Subject Icon Text Attachments
  772   Fri Jun 16 09:36:07 2023 VK, IC. VM, AL, ND, LS Shift summaryRing Commissioning Orbit correction, optimization of the storage, study of the RF frequency 9h30 Start of the modulator and lasser
(GATE is closed).

9h46 Data is taken as background.
 8x 
  901   Tue Aug 13 10:28:30 2024 M ELKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Suite conditionnement section 13/08 pour validation  Vérification Pression SF6
=2.45 bar 

Vérification Températeure
 Scope_RF_signals_0.1dB_3µs_25Hz_13082024.pngRedpitaya_RFsignals_0.1_dB_3µs_25_Hz_13082024.png 
  Draft   Tue Apr 4 15:21:51 2023      , entered from 134.158.195.141 <p>12h10: Mise en chauffe modulateur, laser
et chiller + PA</p>
  