  835   Fri Jan 26 09:36:01 2024 ND, Anna K, Elene K Shift summaryLI | TL | LE Data taking 26/01 

9:30 Warm-up

11:00 Modulator OFF => restart warm-up

Pb temperature section.

12h15: Pb temperature canon.

12h30 Lunch break

13h30 Pb temperature fixed by Kevin.

Restart

Beam jittery.

Phase shifter was at 4530.

Recipe: LI_TL_RI_all_20240125_16_29_34

Beam seen on EL/DG/SST.01 but strongly spread horizontally. Attempts to focus it but with limited success.

Faraday cup study: Noise from the kickers is very strong difficult to see any other signal.

See images attached: 2 kickers: Screenshot_from_2024-01-26_17-06-36.png

ext kicker only: Screenshot_from_2024-01-26_17-09-19.png

inj kicker only: Screenshot_from_2024-01-26_17-07-16.png

No kicker: Screenshot_from_2024-01-26_17-08-36.png

17h40 Stop

Attachment 1: health_check_2024_01_26_09_45.png
health_check_2024_01_26_09_45.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_26_13_53.png
scan_Laser_vs_RF_phase_2024_01_26_13_53.png
Attachment 3: Screenshot_from_2024-01-26_17-06-36.png
Screenshot_from_2024-01-26_17-06-36.png
Attachment 4: Screenshot_from_2024-01-26_17-07-16.png
Screenshot_from_2024-01-26_17-07-16.png
Attachment 5: Screenshot_from_2024-01-26_17-09-19.png
Screenshot_from_2024-01-26_17-09-19.png
Attachment 6: Screenshot_from_2024-01-26_17-08-36.png
Screenshot_from_2024-01-26_17-08-36.png
Attachment 7: 2024-01-26_17_26_05_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
2024-01-26_17_26_05_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
  1153   Wed Nov 19 10:43:41 2025 HG + JM + ND (aprem)Under ProcessInfoLI | TL | LE Shift mesure Twiss + Simu icon1.gif 

8:30 : demarrage à distance 
 

12:10 : QP7 Scan 1 (Phase section 210) optimum sur ligne dispersive 
12:12 : QP7 Scan 1 (Phase section 213) largeur spot diminue 
12:15 : QP7 Scan 1 (Phase section 215) largeur spot Augmente  

Distribution du laser donne un faisceau avec plusieurs coeurs (sur QP7 etc ou lors de quad scans).

comparaison taille sur écrans aux prédictions de BMad. 
ensuite : nouvelle lattice "Bmad" appliquée sur ThomX --> "Mac" -->    recipe_recipe_TL_all_Mac_20251119_18_02_10.txt  
Mac : car dispersion Bmad "matchée" à l'anneau en M .... 

enlightenedBMad fichiers mis à jours sur /data/shared

Suite à faire :

- Mesurer la dispersion. 
- comprendre pourquoi en Y on n'est pas très bon (QP7) 
- revoir les mesures de twiss : les distributions ne sont pas très bonnes pour le quad scan 

 

 

Attachment 1: TLSST1_noQuads_Simu.png
TLSST1_noQuads_Simu.png
Attachment 2: TLSST1_NoQuads_beam.png
TLSST1_NoQuads_beam.png
Attachment 3: TLSST1_quads_Simu.png
TLSST1_quads_Simu.png
Attachment 4: TLSST1_With_Quads_beam.png
TLSST1_With_Quads_beam.png
Attachment 5: TLSST1_quads_Q7_Simu.png
TLSST1_quads_Q7_Simu.png
Attachment 6: TLSST3_Mac_Receipt_Simu.png
TLSST3_Mac_Receipt_Simu.png
Attachment 7: TLSST3_Mac_Reciept_Beam.png
TLSST3_Mac_Reciept_Beam.png
  737   Thu Apr 20 10:36:19 2023 Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023Reference SolutionShift summaryLI | TL | Aimants | Linac Commissionning référence axe mag Canon 

Voici la référence tete de machine pour l'axe mag canon :

Laser Iris position  [H;V] : [4.90/2.42mm]

Solénoides position : Z : 3.3mm, -4.9mrad

                                 X : 0.8mm, 10.201mrad

  663   Mon Jan 9 19:28:31 2023 Entered by Hayg Guler from 134.158.195.141 on Mon Jan 9 19:28:16 2023Not FixedLinacLI | TL Mesures Linac (KD/HG) 

Quelques mesures pour confirmer la position du laser sur la photocathode,

et mesure de l'energie pour vérifier les valeurs pour le transport. 

En effet sur le dipole, on avait besoin de 146 A pour aller sur TL/SST2 ...

Modulateur : HT : 1090 V et atténuations Canon/LIL -> 0/1.2 dB

Energie : 45.8 MeV ... mesure faite avec steerers + Ecran ...

Donc 1.2 dB sur la section ne suffit plus ??

1 dB --> 45.7 MeV ....

Idem en diminuant l'atténuation, pour une meme valeur de

0.25 dB --> 42.3 MeV .... 

Pourtant :

PiC Lil : sur la RPY

0.25 dB : -0.142

0.75 dB : -0.136

1.25 dB : -0.127

 

A creuser demain.

 

 

  783   Mon Jul 24 16:29:07 2023 ND,LS, KD, JNC Shift summaryLI | TL Shift du 24/07/2023 

10h: Accès casemate

Ajout de deux cables près de TL/ICT.02, un jouant le role d'antenne et l'autre connecté à une résistance 50 Ohm. 

Cable n°36025 avec 50 Ohm sur WAC02 ch7

Cable n°36036 en antenne sur WAC02 ch5

Objectif: étude du bruit EM pour comprendre la fluctuation de charge détectée

11h : Mise en chauffe 

13h45 : Démarrage Faisceau 

13h50: Cyclage des aimants

14h: Scan charge/phase

14h30: Problème avec la mesure de charge: redémarrage des ds calc à 16h

15h: Transport jusque dans la TL

15h30: Prise de mesure des signaux ICT (avec les deux nouveaux canaux) pour étude de fluctuation de bruit => prise de mesure avec et sans faisceau

16h: Modulateur en HV

16h20: Modulateur en trigger => attenuateur section RF à 1.6dB

16h45: Injection dans l'anneau avec recette LI_TL_RI_test_20230627_16_46_07 sauvée sous le nom Beam stored (no RF, 150 turns)

16h49: Interlock cavité Pi Pr RF

17h05: Interlock modulateur status bit 12

*** Problème allumage modulateur ==> acquitement des défauts sur les MUX en physique (PC Mohamed HS)

*** Problème avec la cavité RF qui n'accroché pas avec le PID fréquence ==> redémarrage chassis PID

*** Réalignement tete de machine et injection "à l oeil" dans l'anneau

*** 21h: arret machine

 

 

 

 

 

  972   Tue Dec 3 09:14:50 2024 SC, HG, VMUnder ProcessLinacLI | TL Passage à 61.5MeV et 70 MeV 

9h14 Mise en chauffe

Pas de camera laser qui s'ouvre sur PlateformeIHM

9h19 cyclage aimants LI, TL sur interface

soucis DS camera laser, impossible à redémarrer.
--> du coup impossible de démarrer le feedback du laser

Chargement recette good_20241114_15_27_46, optimized storage for X_rays (5/6)

Mesure energie : 48.34 MeV attenutation 2.7 dB

Energie = 54.21 MeV attenuation 1.7 dB

Energie = 58.77 MeV attenuation 1 dB

Energie = 60.29 MeV attenuation 0.5 dB

Passage à 61.5 MeV dans la TL --> recette enregistrée

Passage à 70 MeV dans la TL --> recette enregistrée, solenoide est à 210 A, dipole = 255.8A

Modification des steerers :

LI/PS/STR.01_H01 = 1.17A

LI/PS/STR.01_v01 = -2.16

LI/PS/STR.02_V01 = 2.32

LI/PS/STR.02_H01 = 1.17A

Images sauvegardées le long du transport

Après alignement quad sans le steerer TL :

LI/PS/STR.01_H01 = 1.18

LI/PS/STR.01_V01 = -220

LI/PS/STR.02_H01 = -2.97

LI/PS/STR.02_V01 = 2.34

Puis mesure transmission charge vs soleno

 

 

18h30 Arret

 

Attachment 1: screenshot_steerers_linac_findejournée.png
screenshot_steerers_linac_findejournée.png
Attachment 2: Beam_transmission_Sole.png
Beam_transmission_Sole.png
  1027   Tue Mar 4 18:42:57 2025 Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025Under ProcessLinacLI | TL Conditionnement Canon 

1- Conditionnement du Canon à 16 dB, on gagne un peu en vide. 

2- sautes du faisceau : vérification du signal avant la section. 

Signal visible sur les positions, voir les 2 images, avec ou sans steerer. 
hypothèse :

- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM 
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont. 

l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique. 

 

18h45 : On ferme  

Attachment 1: Jumps_YagLI.png
Jumps_YagLI.png
Attachment 2: Jumps_YagLI_NoSteerer.png
Jumps_YagLI_NoSteerer.png
  1060   Mon Apr 28 17:13:58 2025 Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025Under ProcessInfoLI | TL Hayg / Thibault 

 

Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)

Col-01 Mot-01 : 1.213

Col-01 Mot-02: 3.502 

Col-02 Mot-01 : 11.823

Col-02 Mot-02 : -5.429f

On remet les anciennes valeurs de ref. 

 LI/AE/COL.01-MOT.01 = 0.783 mm
      LI/AE/COL.01-MOT.02 = 3.427 mm
      LI/AE/COL.02-MOT.01 = 10.451 mrad ; 
      LI/AE/COL.02-MOT.02 = -4.359 mrad

Données pour comparer le transport Linac dans /data/shared/commissioning_scripts/Data

 

  1061   Tue Apr 29 11:03:14 2025 Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025Under ProcessInfoLI | TL Data taking for ML  

Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3 
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran 

data --> /data/shared/commissioning_scripts/Data/data/data_linac_29_04_2025/

Section best phase : 207 

Stop ThomX : 19:10  

  1072   Mon May 19 17:57:15 2025 Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025Under ProcessInfoLI | TL Data : Sole scan, Q scan, random linac Yag_TL1 

Today's data :
- coil scan (+ images)
- Q3 scan
- Random scan yag TL2

17:45 - intervention Nicolas WC

 

18h : fin

  1085   Tue Jun 10 18:39:54 2025 SC, HGUnder ProcessShift summaryLI | TL Emittance + data taking  

phi max :  220 deg Qmax = 120 pC

Laser new position : 4.714 / 3.524

zPhiS=215   AttS=2.58 dB

Emittance measured at QP3 and QP7 (different phase for section)

Data saved for ML :  /media/operateur.thomx/Ultra\ Touch/ThomX_Data/data_linac_10_06_2025/
 

Stop : 18h45

Attachment 1: Emittance_QP7_phiS_222.png
Emittance_QP7_phiS_222.png
Attachment 2: Emittance_QP7_phiS_220.png
Emittance_QP7_phiS_220.png
Attachment 3: Emittance_QP7.png
Emittance_QP7.png
Attachment 4: Emittance_QP3.png
Emittance_QP3.png
  1179   Mon Jan 12 13:51:05 2026 HaygUnder ProcessInfoLI | TL Monday Shift : Q-scan + Data (Active Learning) icon1.gif 

Mesures du jour : 

  • Quad scans à QP1 pour voir d'autres points de fonctionnement avec une matcihing anneau correct (Figure de merite <1 ?)
    • autres points Solé
    • autres points Q > 100pC (jusqu'à 300pC)  
  • Active learning pour données TL jusqu'à TLSST3 inclus.  

Attenuation laser : 320 pour pour avoir 100 pC @ Emax

Alignement Quads + minimisation disp E ok 
no 14h40 : Laser s'est arreté ... le Ds s'est mis en fault --> soucis de liquide de refroidissement
--> intervention de kevin 

crying 18h04: plus de trig (Synchro? ) --> trigger ne clignotte plus 

18h20 : Stop ThomX

 

 

  1239   Mon May 11 09:33:17 2026 VincentUnder ProcessLinacLI | TL Manip Gplast 

9h30 test radioprotection OK (mesure en dessous du bruit de fond)

13h30 fenetre installée pompage en cours

14h fin de l'intervention

 

  826   Wed Dec 13 11:20:19 2023 Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 InfoLI | SY Changement fréquence linac 

Suite à une demande de Jean-Noël, la fréquence linac a été changé.

Nous sommes maintenant à la fréquence nominale + 500Hz: 2998.550500MHz.

La fréquence anneau est inchangée.

 

  Draft   Fri Mar 3 11:49:50 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning Shift 03 

Start modulator; alims;

We cannot start machine. No e-beam. Timing laser RF? Need help of linac team. 

 

Kevin solved problem with shutter.

Check alignment at QP3.

Check phase of the section, go to 1.35 dB. 

Libera4 reboot.

Measure  orbit.

Try to change frequency of synthe from 500 to 500.43 resulted in the change beam position in TL BPM2, but it should not do anythyng with TL. Same shift is observed at the screen in the same position. 

Vincent tryies to understand how to interpret this behaviour.

 

 

 

 

 

 

 

  701   Fri Mar 3 12:08:59 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning RE: Shift 03 

evreything is ok

The laser shutter was closed ! Becareful the shutter state is inverted.

VK VM wrote:

Start modulator; alims;

We cannot start machine. No e-beam. Timing laser RF? Need help of linac team. 

 

 

  702   Fri Mar 3 12:29:49 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning RE: RE: Shift 03 

Il se passe des choses pendant la nuit qui mette les diags de la machine en radent :

 - Tous les BPM saturent ==> necessité de remettre la "puissance" à -10

 - Toutes les caméras étaient éteintes ==> necessité d'aller dans "DS restart" pour un forcage du redémarrage DS

==> Pourquoi nous avons cela ?

 

 

VK VM wrote:

evreything is ok

The laser shutter was closed ! Becareful the shutter state is inverted.

VK VM wrote:

Start modulator; alims;

We cannot start machine. No e-beam. Timing laser RF? Need help of linac team. 

 

 

 

  1042   Thu Mar 20 18:41:55 2025 Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 Shift summaryLI | Ring | Linac Commissionning | Ring Commissioning 19 et 20 mars - Mesures X-rays - Bravin & co 

19 mars 2025

Photonic juste derriere hexa échantillon 

  • Lag time
  • PMMA
  • 2D : Resolution detecteur - To-MTFHexa échantillon
  • 2D : TOR-MAM off-axis (énergie 42 keV - cf spectre) – Hexa échantillon
  • Tomo : Micro-CT-bar-pattern Hexa échantillon
  • Tomo : Micro-CT-contraste-scaleHexa échantillon

20 mars 2025

Contraste de phase : Photonic au fond de la X-Hutch

  • 2D : Fil pêche - Hexa mono
  • 2D : Fleur - Hexa mono
  • Tomo : micro-CT-bar-patternHexa échantillon
  • Tomo : FleurHexa échantillon
  • Vers 14h30 : 2D : File de pêcheHexa monosingle shot
  • 2D : AraignéeHexa mono
  • Tomo : plusieurs piments dans une boite – Hexa échantillon
  • 2D : TOR_MAMHexa mono - Images du bas du phantom, tous les 10 mm Tx.
  • 2D : Fil de pêcheHexa monoPlusieurs single shots

 

Attachment 1: spectre_42keV.png
spectre_42keV.png
  929   Tue Oct 1 08:45:59 2024 SC-VC-HG-ND-IC-VM-VK LinacLI | Ring | Linac Commissionning Beam transport up to the ring 

8h45 Mise en chauffe refroidissement et modulateur

9h visite

on a du acquiter les vannes avec jive

10h30 demarrage faisceau

srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16

 

Scan de l'iris en fonction des steerers (cf image)

12h Pause

14h restart

Goal: transport the beam to the ring and start ring injection.

Start all the Ring elements.

Try to establish the beam transport.

Several problems: go to THOMX MPS mode (Noureddine fixed), several problem with modulator (Maher fixed).

Server 5 was restarted. We lost all the initial settings (temperature, phases, attenuator). Fo future, it is better to store these values in the config file to avoid the problem during the restart of the DS on client 5.

During all the day, continuos problem with shutter. We tried several times to reset it (with keys), it did not really help. It is impossible to transport the beam as the charge is low and the beam shape is very strange.

17h50 Finally got the reasonable beam at the ring rntrance

Injection. First turns.

Injection Kicker timing adjusted from -7.23 to -7.4 . Need to scan for optimum.

Few 100s turns in the ring.

18.40End of the Shift.

 

 

 

 

Attachment 1: Scan_Iris_220A.png
Scan_Iris_220A.png
Attachment 2: Scan_Iris_200A.png
Scan_Iris_200A.png
Attachment 3: TLSST3Screenshot_from_2024-10-01_17-44-44.png
TLSST3Screenshot_from_2024-10-01_17-44-44.png
Attachment 4: TLSST3Screenshot_from_2024-10-01_17-48-42.png
TLSST3Screenshot_from_2024-10-01_17-48-42.png
Attachment 5: Screenshot_from_2024-10-01_17-58-36.png
Screenshot_from_2024-10-01_17-58-36.png
Attachment 6: RingScreenshot_from_2024-10-01_18-33-08.png
RingScreenshot_from_2024-10-01_18-33-08.png
Attachment 7: OscScreenshot_from_2024-10-01_18-35-00.png
OscScreenshot_from_2024-10-01_18-35-00.png
Attachment 8: Screenshot_from_2024-10-01_18-38-51.png
Screenshot_from_2024-10-01_18-38-51.png
  1077   Fri May 23 18:54:22 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 Shift summaryLI | Ring Spectro Si VORTEX : Calibration 

Le spectro Si (vortex/falconX) a ete calibre avec une feuille d'etain

Calib checkee avec une feuille d'or

Cf screenshot spectre Sn (rouge) et Au (vert) superposes

Attachment 1: 2025-05-23_17-46-30-VORTEX_Sn_Au.png
2025-05-23_17-46-30-VORTEX_Sn_Au.png