  Toutes les notes concernant les Commissionning de ThomX, Page 50 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  599   Fri Oct 21 08:12:27 2022 VC VK ICUnder ProcessShift summaryRing Commissioning Commissionning 8H15 demarrage chauffage Klystron et chiller

9h15 bunker ouvert (intervention
société extérieure jusqu'à
  
  898   Tue Aug 6 09:57:48 2024 Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 LinacLI | RF D1 Commissioning section accélératrice 9h58 Démarrage Att sec 10dB 3us
25Hz HT = 1200V

On augmente progressivement la
  
  1064   Fri May 2 17:47:18 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025 Shift summaryLinac Commissionning | Ring Commissioning Commissioning Spectro Vortex/FalconX 1) Setup (pj 1) : petite sphere "jaune"
devant le vortex (je ne sais pas en quoi
elle est faite, peut-etre un laiton ...)
 setup.jpeg20250502_Pulse_charac_Capture.PNG20250502_acquisition_Capture.PNG 
  833   Wed Jan 24 08:57:25 2024 VC, IC, VK, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Commissioning Demmarrage machine à 8h45

IHM ThomX warm-up

8H55 Chauffage klystron, Frigo 
 10x 
  910   Wed Sep 11 08:39:18 2024 VC KDUnder ProcessShift summaryLinac Commissionning Commisionning linac set 2024 8h30 démarrage chauffage modulateur

9h: mise en chauffe laser, chiller
et remise SF6 (2.4bars --> 2.6bars)
  
  848   Wed Feb 28 08:49:30 2024 VC, VM, VKUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Commintionning RING demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à
 health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png 
  89   Tue Oct 5 10:05:21 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021Reference SolutionLinacLaser Comment éteindre le laser icon3.gif Pour couper le Laser :


il faut arrêter seulement
l'Ampli, et laisser l'oscillateur
  
  208   Mon Dec 13 17:54:14 2021 Entered by Nicolas Delerue from 80.119.21.73 on Mon Dec 13 17:53:57 2021Not FixedProblemCC Clients3 est en panne... ssh: connect to host client3.thomx.fr port
22: No route to host

 
  
  114   Tue Oct 12 11:12:51 2021 Entered by sophie chance from 134.158.195.142 on Tue Oct 12 11:12:35 2021Under ProcessInfoLinac Commissionning Client 1 Faisceau en cours

Client 1 ne répond plus
  
  572   Mon Oct 3 12:51:26 2022 Slava, Viktor M, IrynaFixedProblemRing Commissioning Check the QUADs in the ring On last Friday, we found that there is
a potential problem with QUAD 9, 10
an 12 as by switching them OFF, we obtained
  
  1202   Wed Mar 4 08:35:23 2026 VM, MJ, DN, RCFixedShift summaryLinac Commissionning | Ring Commissioning Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 08h35 Warm-up ThomX: Modulator, Laser,
Fridge

Programme
 7x 
  1168   Fri Dec 12 08:40:50 2025 VM, ICUnder ProcessShift summaryRing Commissioning Check of the 70 MeV with MRSV, Ring studies 08h40 Warm-up ThomX: Modulator, Laser,
Fridge

8h45 Chillers were started, cycling
 Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png 
  934   Fri Oct 4 12:26:21 2024 MJ Shift summaryLinac Commissionning Charge vs soleno : OK ce matin Ce matin la charge est parfaitement
transmise de soleno 210 a 250, et decroit
tranquillment ensuite. Je n'ai
 charge_vs_soleno_screenshot.png 
  456   Tue May 10 14:09:00 2022 CB/HG/SC/HM/JNCUnder ProcessLinacLinac Commissionning Charge phase Atténuateur laser à position
= 450

Modification de l'attenuateur
 charge_phase__at_10-05-2022__14-20-56.jpgAlignement_laser__at_10-05-2022__15-05-16.jpgpointfinal_10052022.pngScan_pos_phase_LIL__at_10-05-2022__21-38-25.pngScan_pos_phase_LIL__at_10-05-2022__21-49-51.png 
  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached
 Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png 
  170   Thu Nov 18 11:50:09 2021 Entered by Super Team from 134.158.195.141 on Thu Nov 18 11:49:51 2021Under ProcessLinacLaser | Linac Commissionning Charge avec ou sans l'Iris sur le laser icon1.gif Nous avons testé de retirer l'iris
pour mesurer la charge.

la charge max passe de 100 pC max
 Laser_noIris.pngcharge_pahse.jpgcharge_pahse_noiris.jpg 
  490   Mon Jul 4 10:28:03 2022 Entered by SC/AG from 134.158.195.141 on Mon Jul 4 10:27:45 2022FixedLinacLinac Commissionning Changement vis des aimants Changement des vis solenoides en cours   
  826   Wed Dec 13 11:20:19 2023 Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 InfoLI | SY Changement fréquence linac Suite à une demande de Jean-Noël,
la fréquence linac a été
changé.
  
  825   Tue Dec 12 12:48:58 2023 Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 InfoSY Changement de frequence linac Suite discussion avec Jean-Boel et Vincent,
la frequence linac a ete remise a 2998550000Hz
(nominal).
 Screenshot_from_2023-12-12_12-57-04.png 
  246   Fri Jan 14 10:22:17 2022 Entered by Super Team from 134.158.195.142 on Fri Jan 14 10:22:05 2022Under ProcessLinacLinac Commissionning Casemate ouverte Intervention cavité FP, ouverture
casemate

Alimentation des solénoïdes
  