| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
Text |
 |
|
599
|
Fri Oct 21 08:12:27 2022 |
VC VK IC | Under Process | Shift summary | Ring Commissioning |
|
Commissionning | | 8H15 demarrage chauffage Klystron et chiller
9h15 bunker ouvert (intervention
société extérieure jusqu'à |
|
|
898
|
Tue Aug 6 09:57:48 2024 |
Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 | | Linac | LI | RF D1 |
|
Commissioning section accélératrice | | 9h58 Démarrage Att sec 10dB 3us
25Hz HT = 1200V
On augmente progressivement la |
|
|
1064
|
Fri May 2 17:47:18 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Commissioning Spectro Vortex/FalconX | | 1) Setup (pj 1) : petite sphere "jaune"
devant le vortex (je ne sais pas en quoi
elle est faite, peut-etre un laiton ...) |
  |
|
833
|
Wed Jan 24 08:57:25 2024 |
VC, IC, VK, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Commissioning | | Demmarrage machine à 8h45
IHM ThomX warm-up
8H55 Chauffage klystron, Frigo |
10x |
|
910
|
Wed Sep 11 08:39:18 2024 |
VC KD | Under Process | Shift summary | Linac Commissionning |
|
Commisionning linac set 2024 | | 8h30 démarrage chauffage modulateur
9h: mise en chauffe laser, chiller
et remise SF6 (2.4bars --> 2.6bars) |
|
|
848
|
Wed Feb 28 08:49:30 2024 |
VC, VM, VK | Under Process | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Commintionning RING | | demarrage machine 8H50
Alim
EL/PS/DPI.01 demarrage à |
   |
|
89
|
Tue Oct 5 10:05:21 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021 | Reference Solution | Linac | Laser |
|
Comment éteindre le laser |
| Pour couper le Laser :
il faut arrêter seulement
l'Ampli, et laisser l'oscillateur |
|
|
208
|
Mon Dec 13 17:54:14 2021 |
Entered by Nicolas Delerue from 80.119.21.73 on Mon Dec 13 17:53:57 2021 | Not Fixed | Problem | CC |
|
Clients3 est en panne... | | ssh: connect to host client3.thomx.fr port
22: No route to host
|
|
|
114
|
Tue Oct 12 11:12:51 2021 |
Entered by sophie chance from 134.158.195.142 on Tue Oct 12 11:12:35 2021 | Under Process | Info | Linac Commissionning |
|
Client 1 | | Faisceau en cours
Client 1 ne répond plus |
|
|
572
|
Mon Oct 3 12:51:26 2022 |
Slava, Viktor M, Iryna | Fixed | Problem | Ring Commissioning |
|
Check the QUADs in the ring | | On last Friday, we found that there is
a potential problem with QUAD 9, 10
an 12 as by switching them OFF, we obtained |
|
|
1202
|
Wed Mar 4 08:35:23 2026 |
VM, MJ, DN, RC | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir | | 08h35 Warm-up ThomX: Modulator, Laser,
Fridge
Programme |
7x |
|
1168
|
Fri Dec 12 08:40:50 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Check of the 70 MeV with MRSV, Ring studies | | 08h40 Warm-up ThomX: Modulator, Laser,
Fridge
8h45 Chillers were started, cycling |
    |
|
934
|
Fri Oct 4 12:26:21 2024 |
MJ | | Shift summary | Linac Commissionning |
|
Charge vs soleno : OK ce matin | | Ce matin la charge est parfaitement
transmise de soleno 210 a 250, et decroit
tranquillment ensuite. Je n'ai |
|
|
456
|
Tue May 10 14:09:00 2022 |
CB/HG/SC/HM/JNC | Under Process | Linac | Linac Commissionning |
|
Charge phase | | Atténuateur laser à position
= 450
Modification de l'attenuateur |
    |
|
963
|
Fri Nov 15 12:13:42 2024 |
Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024 | Not Fixed | Info | TL |
|
Charge excess in the TL | | By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached |
 |
|
170
|
Thu Nov 18 11:50:09 2021 |
Entered by Super Team from 134.158.195.141 on Thu Nov 18 11:49:51 2021 | Under Process | Linac | Laser | Linac Commissionning |
|
Charge avec ou sans l'Iris sur le laser |
| Nous avons testé de retirer l'iris
pour mesurer la charge.
la charge max passe de 100 pC max |
  |
|
490
|
Mon Jul 4 10:28:03 2022 |
Entered by SC/AG from 134.158.195.141 on Mon Jul 4 10:27:45 2022 | Fixed | Linac | Linac Commissionning |
|
Changement vis des aimants | | Changement des vis solenoides en cours |
|
|
826
|
Wed Dec 13 11:20:19 2023 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 | | Info | LI | SY |
|
Changement fréquence linac | | Suite à une demande de Jean-Noël,
la fréquence linac a été
changé. |
|
|
825
|
Tue Dec 12 12:48:58 2023 |
Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 | | Info | SY |
|
Changement de frequence linac | | Suite discussion avec Jean-Boel et Vincent,
la frequence linac a ete remise a 2998550000Hz
(nominal). |
|
|
246
|
Fri Jan 14 10:22:17 2022 |
Entered by Super Team from 134.158.195.142 on Fri Jan 14 10:22:05 2022 | Under Process | Linac | Linac Commissionning |
|
Casemate ouverte | | Intervention cavité FP, ouverture
casemate
Alimentation des solénoïdes |
|