  Toutes les notes concernant les Commissionning de ThomX, Page 46 of 63  Not logged in ThomX    logo
icon4.gif   Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025; Shift ThomX/Xrays : Soucis démarrage  Screenshot-ICTLI.png
Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
Entry   KD; shift du 09 novembre 2023 
8h30 : démarrage machine (laser, klystron, chiller, frigo, aimant)

* Beaucoup de problème de rédémarrage. Les delays au niveau des wavecatcher ne sont toujours pas bons (pas
de signal de charge visible).
Entry   DN, IC, HG, KD, MJ, and Co; X-ray measurement/characterization campaign Q_missed_2025-12-18_13-50-19.png
The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
Entry   VC/SC; Commissionning LE 
8h20 demararage machine

laser PC

Frifo chiller
Entry   MEK , SC, Victor, Vincent ; Conditionnement section 24/05 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf
8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin pour la remise de la chaussette de la clim avec Mohamed, remise en route de la clim à l'initial.
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023; Etat ThomX  
Cavité FP a terminé son intervention

Mise sous vide possible cette après-midi

14h Intervention IHM cavité RF
Entry   all; X detectes aujourd'hui 2023-06-23-Shift.pdf
Aujourd'hui on a detecte des X en mode desynchro (notre signal correspond a ~ 3.10**6 ph/sec)

*** Pour :

- 100 pC stockee pendant 100 ms

- 30 kW dans la cavite

Entry   KD; redémarrage machine 21/08/2023 2023-08-21_15_59_49_li_op_las_02_profile_laser_PC_log_scale_True_despeckle_False_Auto_scale_True.pngScreenshot_from_2023-08-21_17-54-55.png
9h: redémarrage des systèmes.

- pompes boucle de refroidissement (pompe primaire, pompe échangeur, maintien de préssion, pompe cavité RF) ==> la résistivité
est à 720k Ohm 
Entry   VK VC HG SC ME; commitionning 
8h10 rémarrage machine chauffage klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y  (tous les DS redpy baie 17 )

Cycling ok
Entry   VC MJ KD; commissionning 7x
8h45 demarrage machine

modulateur frigo ampli laser chiller et cyclage des aimants

IHM warm-up done (fin chauffage modulateur (9h50)
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024; commissioning 
14h - Mesures SPR radiations accelerateur

Beam shutter securite ne remonte plus --> Mesure SPR X-hutch control impossibles ...... Harold intervient  --> Probleme
regle --> ~ 15h45 : Mesure SPR X-rays dans X-hutch
Entry   VC, VK, VM, IC, ND; redemarage machine après élongation anneau scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png
9H démarrage machine en mode linac

chauffage klystron ok

chiller ok
Entry   VC, VM, VK; Commintionning RING health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png
demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à la main (ATK pannel)
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024; Camera PILATUS: instructions to use CAMERA_PILATUS-Instructions_1.pdf
 
Entry   Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024; Conditionnement section 
sortie PA 120W ---> pas assez pour obtenir la puissance nominale Klystron, sortie puissance PA devrait etre autour de 400 W

Pb resolu : un connecteur etait mal serre sur le synthétiseur change lundi 13mai 2024

impossible de démarrer le DS conditionning
Entry   MEK, HG, DN; Conditionnement section plots_vide_section.png
Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs @1Hz jusqu'à   ? dB
Entry   MEK, RC,VC, VK; Conditionnement section 16/05 vide_cond_16_may_.png
conditionnement démmare à 7.4 dB atténuation section ( ) pour une largeur impulsion RF 1µs et fréquence de repetition
de 1Hz

10h : disjonction du PA @ Att=5.6dB (Pis = 7 MW)
Entry   MEK SC SV DN; Conditionnement section 17/05 
set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V pour 3.9-5dB d'atténuation (Pis = 10 MW)
Entry   MEK, SC, KD, IC, MO; Conditionnement section 21/05 red_pitayafrom_2024-05-21_17-39-23.png
8h15 impossible de mettre " standby" du modulateur ==> la pompe de refroidissement n'est en marche

un message a été envoyé à urgence cvc" <urgence.cvc@ijclab.in2p3.fr> pour intervenir pour mettre en marche
la pompe
Entry   MEK,KD; Conditionnement section 22/05 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png
8h45 : mise en marche de modulateur "set to standby "

9h50 : démarrage, passage en TRIG puis montée en puissance douce.

déscente 1Hz, 2us, 5dB -> 3dB