936
|
Mon Oct 7 09:31:13 2024 |
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024 | Fixed | Info | Linac Commissionning |
|
| |
pression SF6: 2.3 bar
(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00) |
|
953
|
Tue Nov 5 17:30:10 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024 | Fixed | Info | Laser |
|
Laser-cathode | |
Bonjour, le laser (miroirs du parcours optique) a ete realigne.
L'etat actuel: l'enrgie sur la cathode ~ 80µJ ( Iris 1.3mm, Att 420)
Viktor. |
|
958
|
Tue Nov 12 10:36:39 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024 | Fixed | Info | Laser |
|
Salle laser ThomX | |
Bonjour , l'intervention du Dalkia sur le CTA de la salle laser est terminee.
Viktor. |
|
961
|
Thu Nov 14 09:21:51 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024 | Fixed | Info | Laser |
|
Etat laser | |
Bonjour, rien n'a change au faisceau laser (distribution reste le meme,l'energie sur la cathode =60mkJ, Iris = 1.3mm, Att =420).
J'ai termine les mesures. On peut demarrer.
Viktor. |
|
973
|
Wed Dec 4 10:54:28 2024 |
VC | Fixed | Fix | SY |
|
Frequence anneau et systeme de synchro | |
Rappel:
la fréquence de l'anneau doit etre modifiée avec l'insterface RING RF cavity :
Ring RF doit etre divisible par 15 à 5 chiffres après la virgule (cela fait des pas de 150Hz sur le 500MHz) c'est la limite du matériel qui sert pour la synchro (toutes les solutions de fréquence ne répodant pas à cette limite ne sont pas des solutions viables pour la machine)
en cas de changement de fréquence il faut vérifier que le timing (répétion de la marchine 25 10 ou 1Hz )soit stable sur l'oscilloscope .
si ce n'est pas le cas il faut changer la phase du générateur Rigol 33MHz avec le script (commande) ./phase_shifter_rigol.py --phase "value" (value = nombre) (dans panneaux/synchro)
si cela ne fonctionne pas (pas de solution timing stable ) prévenir l'équipe synchro
Fréquence Ring actuelle 500.09595 MHz => /15= 33.33973MHz
|
|
976
|
Fri Dec 6 11:11:31 2024 |
VC MJ | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Installation du PM dans la X-hucth | |
Le PM est installe dans la X-hutch (PM + gene + ocsillo), on a test que ca fonctionne -
Il manque juste un cable HT plus long pour positionner l'ampli de facon secure (Vincent lundi) |
|
982
|
Tue Dec 17 23:26:45 2024 |
Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024 | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
shift 17/12 - scan vert FPC - 50 MeV | |
8h10 : mise en chauffe de la machine (modulateur, laser, frigo et chiller)
9h30: faisceau dans anneau avec 100pC injecté
Problème modulateur (interlock tension) ==> attendre que la perverance déscende en trig à faible tension pendant 1h (Maher a augmenté la valeur du threshold, le problème ne devrait pas revenir)
9h35 HV is 1214 V, RF Gun phase is 176 dg. Sect. Att. 2.578 dB, Phase is 216 dg. Charges -84 pC, -72 pC, -76 pC
10h40 HV 1215 V
13h24 Linac steerers H [2.65 -4.29], V [-1.8 2.07] RF Gun Phase 175 dg. Sect. Att. 2.564, Phase 217 dg. Charges: -117 pC, -117 pC, -127 pC
synchronisation laser/electron autour de 4ns (trigger, 33MHz CFP).
** Scan FPC table vertical 50 MeV 10 Hz
aller : 10-57-18.csv ==> sigma_scan = 140 um ==> sigma_e ~ 124 um
retour : 11-09-47.csv ==> sigma_scan = 144 um ==> sigma_e ~ 128 um
** Scan one trig aller 11-19-31.csv ==> sigma_scan = 80 um ==> sigma_e ~ 47 um
** Mesure perte de charge avec BPM en mode one Trig
T_end-T0 ~ 11 minutes
charge T0 ~ 3.8 e^7
charge T_end ~ 4.0 e^6
Baseline ~ 2.8 e^6
--> Q(T0)/Q(T_end) ~ 30
** Viktor optimise l'injection - scan : scan 16-05-16.csv ==> sigma_scan = 133 um ==> sigma_e ~ 116 um
==> gain en flux (facteur 2-3, ~ 15-20 10³ pA à 40 -50 10³ pA)
** Beaucoup de steerers dans la ligne de transfert (~ 10A pour l'horizontal 2 et 3)
** 17h: Scan à "haute" charge (120pC --> 150pC) : scan 17-02-55 ==> sigma_scan = 165 um ==> sigma_e ~ 152 um
** 17h05 : Scan avec iris à 1.3mm --> 1mm (110pC) :
scan 17-13-04 ==> sigma_scan = 152 um ==> sigma_e ~ 137 um
** 17h15 : test single trigger
PS : les flux des 6 scan desynchro en pj sont encore a traiter/comprendre (selon taille e-, charge, iris, optim injection)
|
|
984
|
Wed Dec 18 11:59:49 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024 | Fixed | Info | Laser |
|
Laser-cathode | |
Bonjour, le laser-cathode a ete realigne (miroir M5, miroir dans la salle laser). L'energie UV sur la cathode 55 µJ, Iris =1.3mm; Att=440 |
|
998
|
Thu Jan 16 11:57:51 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025 | Fixed | Shift summary | LI | TL | Ring | Aimants |
|
Resultats Tour de cle Q1-Q3 - Shift 15/01 | |
Prise de donnees axe Q1Q3 du 14/01
Steerers Axe q1q3 : str1[H V] = [2.45 -1.83]
str2 [H V]=[-4.43 2.22]
Axe section : str1[H V] = [1.50 -3.30]
str2 [H V]=[-3.83 4.16]
(section pas bien alignee du tout ... valeurs des steerers = melanges de align_standard et de xopt elog_917 19/09/2024)
Prise de donnees axe Q1Q3 du 15/01 apres tout de cle q1q3 par Alex G. : le but etait de "pousser Q3 vers le MUR"
Steerers Axe q1q3 : str1[H V] = [2.62 -2.06]
str2 [H V]=[-4.52 2.43]
Axe section : idem que 14/01
CONCLUSION :
Axes reconstruits en pj --> Le tour de cle a ete fait dans le mauvais sens (Q3 a ete pousse vers l'anneau ...)
Confirme apres discussion Alex
Et confirme aussi en faisceau : les quads de la TL semblaient apres le tour de cle encore plus desalignes qu'avant par rapport a q1q3 ...
A refaire sem pro dans le bon sens |
|
1001
|
Tue Jan 21 14:24:22 2025 |
MJ KD | Fixed | Shift summary | TL | Ring | Linac Commissionning | Ring Commissioning |
|
align Q1Q3 et pt fonctionnement 61.5 MeV | |
*** Alignement meca Q1Q3
9h30 : 1 tour de cle Q3 vers le mur ( = retour a la position initiale)
Mesure en faiseau Q1Q3 versus Q4Q7 + Mesures confrontees a simu dipole ==> 14h : 1 Tour de cle Q3 vers le mur (+ 1/2 tour Q1 vers le mur, pour voir)
Mesure ==> 15h24 : 1/2 tour Q1 vers anneau
Un peu mieux Q1Q3 versus Q4Q7. On s'arrete la pour align meca
Nouvel alignement axe Q1Q3:
H1 0.76
V1 -3.42
V2 3.45
H2 -2.93
Stockage dans l'anneau (nouvelle align QUAD + derniere recette + rcds)
REMARQUE IL FAUT ARRETER de mettre le SEPTUM et KICKERS a des courant trop bas : il faut mettre SEPTUM a 6A et KICKER a 40 mA
*** TL a 61.5 MeV
Passage jusqu'a SST03 (cf screenshot)
Mesure d'energie avec steerer TL1H : 61.3 a 61.8 selon les mesures
Recette sauvegardee sous TL LE : good_20250121_17_00_31
** Injection 61.5 MeV
Scaling de la recette anneau *1.23 (61.5/50 MeV) + RCDS
Essai d'injection avec ajustement quad anneau "a la main" - cf screenshot
Recette sauvee (injection 61.5 MeV)
** Kicks faiscau
Il nous a semble voir que les kicks sont correles a des pics jauges vides - Prise de donnees sur 15-30 minutes a faire (pas eu le temps aujourd hui)
** Donnees nouvel axe q1q3 prises
fin de shift
|
|
1002
|
Wed Jan 22 13:32:43 2025 |
MJ HG | Fixed | Shift summary | TL | LE | Ring | Linac Commissionning |
|
| |
** Alignement Q1Q3 du jour
str1H 0.69
str1V -3.03
str2H -2.94
str2V 3.39
Passage TL min dispersion (phase sec 214 - att 2.56)
*** Alignement SECTION
str1H 1.64
str1V -1.94
str2H -3.77
str2V 2.87
Avec cet alignement, pour une excursion de phase de 180 a 250, le faisceau bouge seulement de 1 mm sur YagTL1
==> La section est alignee avec ce jeu de steerers (aux kicks faisceau pres ...)
- Charge transmise vs soleno : ok de 190A a 240 A - cf screenshot
- Mesures d'emittance Q3 section alignee MAIS attention : PAS a la bonne phase section ! (254 au mieu de 214 .....)
** Mesures yagTL1 et bpmTL1 prises pour Alignement section et pour Alignement Q1Q3
*** Kicks faisceau bpmTL1 : Correles a Li/Vac 02 et Li/Vac 03 (screenshot dans data/shared)
20h20 fin de shift
|
|
1036
|
Thu Mar 13 11:25:29 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025 | Fixed | Linac | Laser |
|
Etat laser | |
Bonjour, le parcours optique a ete realigne.
L'enegie UV sur la cathode = 48uJ , Iris = 1.3mm, Att = 410 |
|
1037
|
Thu Mar 13 11:57:19 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025 | Fixed | Info | Laser |
|
Etat laser | |
Voici les distibutions UV laser sur lacathode avant et apres l'alignement |
|
1059
|
Fri Apr 18 08:23:13 2025 |
VM, IC, ND | Fixed | Problem | LI |
|
Measurements 18/4 | |
08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling all magnets
09h32 HV is 'ON'
09h34 Cannot control the section attenuator
09h50 The issue with the section attenuator was fixed: its server was shut down and restarted, but it was set to 0 dB!!
11h17 RF Gun phase 171 dg., Sect phase is 211 dg. Att. 2.62 dB, TL/BPM2 X=2mm, Charges (from BPMs at Att. 31 dB): -77pC, -77pC, -86pC . Linac steerere: H [1.03 -3.47], V [-1.88 2.63]
Contradictions with ICTs: -87 pC, -73 pC, -80 pC
Beam in the ring
11h40 RCDS on injection receipt all_20250418_11_39_40, RF cav. at 100 kV, phase 16.5 dg., screanshots
12h03 Linac was reajusted. RF Gun phase is 166 dg., sect. phase is 210 dg. Att. 2.58 dB, TL/BPM2 X=3 mm RF cav. 100 kV, phase 13.5 dg. screenshots
12h10 Ring dipoles were changed from 160.4 A to 159.3 A, ring quads were adjusted and tune as well was set back to 0.17. TL/BPM2 X = 0. Screenshots
12h25 RF Gun phase was adjusted to 161 dg.
15:24 Initial Synchro delay for streak camera: -6.60us. Injection at delay of +99.3e3us
Measurements incuding single shots
Study of the injection and of long decays with the streak camera, cf images. Horizontal scale is 2ms, vertical scale is 600ps.
Operating the streak camera create instabilities on the ring 500MHz that may cause phase problems.
16h47 RF Gun phase is 149 dg. RF cav. was at 200 kV, phase 10.5 dg.
17h26 Stop thomx |
|
1116
|
Tue Sep 9 15:19:47 2025 |
Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025 | Fixed | Shift summary | LI | TL | LE | Ring |
|
X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source | |
** spectre CdTe avec feuille Au (pour calib)
** Utilisation du script FWHM des spectres, mapping 2D - Enregistrment spectres dans /data/shared (5x5 positions a chaque lancement du script).
** Prise de qq spectres autour de la position on-axis (position estimee juste avant avec le script)
** Mesure taille source "methode fentes 1" (images photonic science) |
|
1124
|
Wed Sep 17 16:56:59 2025 |
HG, MJ | Fixed | Shift summary | LI | TL | LE | Ring |
|
Quads scans Q3 et Q7 + Courbe energie vs Phase section | |
Modulateur HT @600 V 
Question : Quand on switch off le Dipole de la TL (Linac) le faisceau prend un kick ( - 0.1 mm sur le BPMx, et 0.2 mm BPMy) --> déjà observé ?
Vers 13h30
Min de dispersion pour phi_Section 246° et Att : 0.15
** Energie vs Ph_sec
Phi246 : Ekin :68.05 (Dispersion min Yag TL2)
Phi248 : Ekin :68.49
Phi250 : Ekin :68.27
Phi252 : Ekin :67.88
Phi254 : Ekin :67.65
Phi256 : Ekin :68.17
Phi258 : Ekin :66.8
Phi260 : Ekin :66.9
Phi264 : Ekin :65.5
244° (avec backlash) pour avoir disp min TL2 - 250.8 dipole pour BPMTL2X = 0
** Quad Scans
Conditions : q1 q2 q3 q4 q5 q6 : -0.25 / 4.9 / -4.77 / 2.94 / 2.94 / -5.6
Scan Q7 a Phi_sec=248
emitX=3.1 (14h04)
emitY=2.2 (13h59)
Dipole OFF - Scan Q3 a Phi_sec=248 (14h56 seulement car probleme de code qui beuguait)
emitX=1.6
emitY=3.9
Dipole ON - Scan Q7 a Phi_sec=248 (bis) 15h08
emitX=2.8
emitY=2.6
Dipole ON - Scan Q7 a Phi_sec=248 (ter) 15h14
emitX=2.8
emitY=2.5
Dipole ON - Scan Q7 a Phi_sec=246 15h17
emitX=2.3
emitY=2.5
Dipole ON - Scan Q7 a Phi_sec=244 15h23
emitX=3.1
emitY=2.4
Dipole ON - Scan Q7 a Phi_sec=246 (bis) 15h35
emitX=2.5
emitY=2.8
Dipole OFF - Scan Q3 a Phi_sec=246 15h39
emitX=1.7
emitY=3.6
** Check min espread ecran TL2 : min espread ph_sec 245-246 (15h43)
** De nouveau Energie vs Ph_sec (q1 q2 q3 = 0) (pour voir precision, effet aller-retour, backlash) (16h)
Data ci-dessous ==> data traitees : cf. pj
Phi245 : Ekin :68.7
Phi246 : Ekin :69.0
Phi247 : Ekin :69.0
Phi248 : Ekin :69.9
Phi249 : Ekin :68.5
Phi250 : Ekin :68.4
Phi252 : Ekin :67.7
Phi254 : Ekin :67.1
Phi256 : Ekin :67.3
Phi260 : Ekin :67.0
Phi264 : Ekin :64.3
Phi267 : Ekin :62.9
Je repars de plus bas et je monte
Phi225 : Ekin :67.4
Phi215 : Ekin :64.5
Phi225 : Ekin :65.2
Phi230 : Ekin :67.5
Phi235 : Ekin :68.2
Phi235bis : Ekin :68.7
Phi235ter : Ekin :68.1
Phi237 : Ekin :67.8
Phi239 : Ekin :68.3
Phi240 : Ekin :69.0
Phi241 : Ekin :68.9
Phi242 : Ekin :69.3
Phi243 : Ekin :68.7
Phi244 : Ekin :69.9
Phi245 : Ekin :69.8
Phi246 : Ekin :69.5
Phi247 : Ekin :69.4
Phi248 : Ekin :68.7
Phi249 : Ekin :68.4
Phi251 : Ekin :68.2
Phi254 : Ekin :64.3
Phi254bis : Ekin :68.3
Phi257 : Ekin :67.9
Phi262 : Ekin :66.7
Je redescends
Phi257 : Ekin :66.0
Phi257bis : Ekin :68.4
Phi257ter : Ekin :66.0
Phi257quatro : Ekin :67.2
Phi254 : Ekin :67.0
Phi251 : Ekin :67.6
Phi248 : Ekin :67.7
Phi248bis : Ekin :67.8
Phi247 : Ekin :69.5
Phi246 : Ekin :69.2
Phi246bis : Ekin :68.3
Phi246ter : Ekin :68.3
Phi246quatro : Ekin :69.9
Phi245 : Ekin :69.3
Phi244 : Ekin :69.8
Phi244bis : Ekin :67.7
Phi244ter : Ekin :67.3
Phi244quatro : Ekin :69.2
Phi243 : Ekin :67.2
Phi242 : Ekin :68.3
Phi241 : Ekin :69.0
Phi240 : Ekin :67.0
Phi237 : Ekin :69.7
Phi235 : Ekin :67.0
Phi232 : Ekin :68.6
Phi232bis : Ekin :68.5
Phi228 : Ekin :66.1
Phi225 : Ekin :66.4
Phi225bis : Ekin :67.2
Phi225ter : Ekin :66.9
Phi225quatro : Ekin :65.5
|
|
1148
|
Mon Nov 10 16:15:53 2025 |
KD, M2 GI | Fixed | Shift summary | LI | TL | Linac Commissionning |
|
shift du 10 novembre 2025 | |
8h: mise en chauffe en remote (modulateur, laser, frigo/chiller)
10h: Démarrage machine
*** Programme TP ***
- mesure charge/phase et Energie/phase du canon
- Mesure beam parameters sortie section + energy et energy spread
|
|
Draft
|
Thu Nov 13 08:00:59 2025 |
KD MJ VM HG | Fixed | Shift summary | LI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X | |
Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc
L'interface SST ne fonctionne pas - URGENT ==> probleme resolu
Libera 2 et 4 reboote une 2eme fois ...
Faisceau dans l'anneau
15h15 toujours impossible de locker la cavite FP, pour une raison inconnue ==> Shift reporte
Several manual BBA steps were performed in the Hor. plane for Ri-C1/QP01 to find the offset change in Ri-C1/BPM01.
16h46 Stop ThomX
|
|
1188
|
Thu Feb 5 13:18:03 2026 |
KD, HG, VM | Fixed | Info | LI | TL | LE | Ring | CC | Laser | Opt | MECA | SY | Vide | Electronique |
|
Laser PC status | |
** l'iris a été changée et est opérationnelle
/!\ problème dans l'offset il faut ajouter 0.5mm à la valeur relu par Tango (pour 1.3mm il faut mettre 0.8 mm dans l'ATK panel)
** Laser PC ***
- Sortie Laser: 85 - 90 uJ (avant 250 uJ)
- Injectée ligne transport: 80 uJ (235 uJ)
- Sortie ligne transport: faisceau trop gros pour une mesure correct (188 uJ)
- Sortie Iris (ouverture max): 65 uJ (175 uJ)
- Sortie iris (1.3mm): 28uJ (51 uJ)
- injectée canon (iris 1.3 mm, 420 pas) : 22 uJ (43 uJ)
On a environ 2 fois moins de puissance laser disponible pour les e-, les 100pC devrait etre atteignable
/!\ refaire un alignement cathode ! le point à bougé (ouverture canon, réalignement laser).
*** Synchro ***
non testée pour le feedback de phase.
16h00 HV is on
Section and RF gun processing
17h05 HV 990 V, RF gun att. 0 dB, interlocks
It seems that the brakdowns are in the waveguides, not in the RF gun.
17h31 HV 1010 V, Sect Att. 22 dB, RF gun Att. 10 dB
17h34 HV 1030 V, Sect Att. 22 dB, RF gun Att. 10 dB, interlocks
17h45 Stop ThomX |
|
1202
|
Wed Mar 4 08:35:23 2026 |
VM, MJ, DN, RC | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir | |
08h35 Warm-up ThomX: Modulator, Laser, Fridge
Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir)
08h40 Chillers were started, cycling all magnets.
09h47 HV is on but there are no triggers. Failed to connect to device li/op/opt.02-las.01-asp.01. The photocathode laser control mashine is off.
10h10 The photocathode laser control mashine is on. The laser amplifier was started.
10h29 Misstriggering caused modulator interlocks
10h44 It is OK with triggering, exept the photocathode laser.
11h15 Laser is ok, phase 133 dg.
11h48 The laser spot moves out of the screen, Hayg fixed it
12h35 Transfocator_20260225_17_33_57.txt loaded. Linac steeres were adjusted. Laser phase 127 dg., Sect. att. 2.532 dB, sect. phase 225 dg. linac steerers: H [-0.21 -2.66], V [-2.47 3.32], RF 100 kV, phase -39 dg., charges around -100 pC
On ne voit pas le centre du faisceau X sur DECTRIS - Trop allonge verticalement
Viktor "ajuste" la recette ==> on voit un tout petit petit petit peu mieux le centre ...
Flux < 5000 .....
Scan FPC ==> faisceau enorme cf screenshot 1_scanFPC_recipe_ou_on_voit_le_centre.png
Retour recette du depart orbites a peu pres plates plates
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 2_scanFPC_receipe_FLAT_centre_pas_visible.png
Optimisation phases etc par Viktor
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 3_scanFPC_receipe_FLAT_OPTIM_centre_pas_visible.png
16h58 Standby, removing the additional shunt resistor from the bend #3
17h42 HV is on
18h00 recipe_recipe_LI_TL_RI_all_20260224_14_54_20.txt loaded
Faisceau a peu pres au centre du tube
Flux ~ 20.000
Comparaison avec shift du 24/02 (spectre onaxis et V+40) ==> cf screenshot compar_20260224_20260304_after_cut_resistance.png
==> c'est OK, spectres tres similairees
18h26 ThomX stopped
CONCLUSION : impossible d'obtenir un faisceau electrons correct avec la nouvelle resistance. Retirer la resistance a permis de retrouver les resultats du 24/02
DEMAIN : demarrage des etudes matching a ce point de fonctionnemenet
A 100 pC
- Sol 230
- Sol 242
- Sol 250 100 pC,
puis SOL 230 a 200 pC |