  1210   Thu Mar 12 15:17:49 2026 MJ, KDFixedShift summaryLinac Commissionning | Ring Commissioning MONOCHROMATEUR - 12 mars 2026 

Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2 0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 , H-20 , H+20 , V-20

-----------------------------------------------------------------------------------------------------------

Alignement MONO parallele au faisceau : Hexa mono Ry_mono = -0.1 deg

----------------------------------------------------------------------------------------------------------

Fente2 OnAxis

Ry = - 2.6 - 0.1 deg (43.6 keV code Kilperic)  - R_sample = 5.2 deg

Spectres Fentes2 ouvertes ** 1 x 1 mm
                                         ** Max

Ry = - 2.5 - 0.1 deg (44.3 keV code Kilperic)

Spectres Fentes2 ouvertes ** Max
                                         ** 1 x 1 mm
                                         ** 0.5 x 0.5
                                         ** 2 x 2
                                         ** 3 x 3

Ry = - 2.45 - 0.1 deg (46 keV code Kilperic)

Spectres Fentes2 ouvertes ** Max
                                         ** 0.5 x 0.5
                                         ** 2 x 2

Mesure du flux diode calib avec et sans MONO

SANS MONO
    Fentes2 ** 1 x 1 mm 12h50-51
                 ** 2 x 2  12h51-52
                 ** 3 x 3  12h52-53

Avec MONO : IMPOSSIBLE trop de bruit de fond

Mesure du flux avec DECTRIS

Ry = - 2.45 ==> Images 404 et 405 (13h11)
Ry = - 2.5  ==> Images 406 et 407 (13h12)
Ry = - 2.6  ==> Images 408 et 409 (13h13)
REF Ry = - 0.1 ==> Images 410 et 411 (13h18)

 

Fente2 V+40

Ry = - 2.9 - 0.1 deg (39 keV code Kilperic)

Spectres Fentes2 ouvertes ** 1 x 1 mm
                                         ** Max
                                         ** 2 x 2

Mesure du flux avec DECTRIS

Ry = - 2.9 ==> Images 415 et 416 (13h41)
REF Ry = - 0.1 ==> Images 418 et 419 (13h43)

Prise spectre ref a V+40

 

Fente2 V+70

Ry = - 3.8 - 0.1 deg (30 keV code Kilperic)

Spectres Fentes2 ouvertes ** 1 x 1 mm
                                         ** Max
                                         ** 2 x 2
                                         ** 5 x 5
                                         ** et divers autres

Fente2 H-37

Prise spectre ref a H -37

Pour Ry = - 2.9° (angle mono), R_sample = 6.5° (2theta)

Spectres Fentes2 ouvertes ** 2 x 2 mm
                                         ** Max

Fente2 H-64

Prise spectre ref a H -64

Pour Ry = - 3.8° (angle mono), R_sample = 8.5° (2theta) ==> Emean ~ 27keV

Pour Ry = - 3.2° (angle mono), R_sample = 7.3° (2theta) ==> Emean ~ 31.5keV

Fente2 H+36

Prise spectre ref a H +36

Pour Ry = - 2.9° (angle mono), R_sample = 5.5° (2theta) ==> Emean ~ 42keV

Pour Ry = - 3.2° (angle mono), R_sample = 6.1° (2theta) ==> Emean ~ 38keV

 

 

  1212   Sun Mar 15 18:42:53 2026 MJ HG VKFixedShift summaryLinac Commissionning | Ring Commissioning Etudes de points MATCHING - 13 mars 2026 

Programme : Etudes points Matching
==============================

Fentes2 centre faisceau a l’œil [H , V] = [7 , -18]

(Mot Det Ty = 10000 , TX = 0)

Orbites e- : idem que le 12/03 et le 11/03 (plate en Y, tout petit angle en X)

Check meilleures position de X_fpc 

X_fpc de -1.4 a -1.7 , prise de spectres V+40 et OnAxis 

- Ne change pratiquement rien aux dromadaires V+40

- On se place à X_fpc = -1.7 mm

DISTANCE Hexa_ech - Photonic = 43 cm

Sol = 230, iris=1.3

** Flux ~ 18000 (~ 12000 I3, ~ 6000 I4)

** Spectre OnAxis

** Mesure de taille source Photonic

(Mot Det Ty = 12000 , TX = 18000)
(Fente1 Hpos = -10.5 / Vpos = 2 / Hapert = 6 / Vapert = 5)

LSF [H , V] = [52 , 132]  um

** Long paquet : 87 ps inj à 190 ps (FWHM)

** Quadscan Q1 :

Emit [x , y] = [1.8 , 1.8]
Beta [x , y] = [6.5 , 4.7]
alpha [x , y] = [-2 , -1]

 

Sol = 242, iris=1.0

** Flux ~ 8-9000

** Mesure de taille source Photonic

LSF [H , V] = [69 , 197] um 
LSF [H , V] = [68 , 188]  um               MOINS BON

** PAS de prise de spectre

** Quadscan Q1 :

Emit [x , y] = [2.3 , 3.6]
Beta [x , y] = [54 , 44]
alpha [x , y] = [-11 , -8.5]

Avec autre fit du quadscan Q1 (Sol = 242, iris=1.0)

Emit [x , y] = [3.9 , 5.8]
Beta [x , y] = [32 , 26]
alpha [x , y] = [-7 , -5.4]

** Flux ~ 9000 (6000 I3 , 3000 I4)

** Mesure de taille source Photonic

LSF [H , V]  = [66 , 192] um
LSF [H , V] = [63 , 186] um

** 1 spectre OnAxis

** Long paquet : 100 ps inj à 200 ps (FWHM)

MOINS bien que Sol = 230

 

Sol = 238, iris=1.0

** Quadscan Q1 :

Emit [x , y] = [2.4 , 1.7]
Beta [x , y] = [31 , 40]
alpha [x , y] = [-6 , -8]

** Flux ~ 10000

** 1 spectre ONAxis

On passe l’iris de 1.0 à 1.3, avec même optique

** 1 spectre ONAxis

** Flux ~ 10000

MOINS bien que Sol = 230

 

Retour a Sol = 230, iris = 1.3

** Prise de spectres

V+20 / V-20 /  V-20 H+20 / H+20 / H+20 V+20 / H-20 V+20 / H-20 / H-20 V-20
V-40
V+40
H+40

** Mesure de taille source Photonic

LSF [H , V] = [67 , 168] um

 

  1220   Fri Mar 27 07:41:15 2026 MJ KD IC VM DN RCFixedShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE 70 MeV - 27 mars 2026 

** Programme : Energy-Angle 70 MeV

7h40 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON

==> 70 MeV. F=500.031645 MHz

recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted

11h42 Laser Phase 53.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.177 dB, I_Gun -91.5849 pC, I_Linac -135.8848 pC, I_TL -118.0054 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.

Orbite IP differente de 70 MeV semaine derniere
12h30 Iryna vient en sdc pour retablir l'orbite IP de reference

15h44 Laser Phase 41.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.122 dB, I_Gun -90.9101 pC, I_Linac -134.7212 pC, I_TL -115.0435 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
17h23 Laser Phase 42.3 dg., Sect. Phase 256 dg., Sect. Att. 0.176 dB, I_Gun -89.6772 pC, I_Linac -133.3612 pC, I_TL -113.6226 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.

** On-axis a l'oeil

** Check dromadaires

Pas tres bon ==>  Deplacement Horiz table FPC de -1.6 a -1.9 ==> On ne trouve rien de tres bon ... On se place a -1.9 mm (cf screenshot droma_70MeV) 

** Prise de spectres autour de -20/20 en H et V

** Long paquet : ~ 83 ps FWHM ==> 35 ps RMS

** Mesure taille de source X :

LSF [V , H] = [137 , 51]  (image 1000ms0004)  ==> e- [H , V] = [190 , 74]
LSF [V , H] = [142 , 50]  (image 1000ms0005)         e- [H , V] = [204 , 71]
LSF [V , H] = [136 , 53]  (image 700ms0003)           e- [H , V] = [187 , 81]
LSF [V , H] = [141 , 52]  (image 700ms0002)           e- [H , V] = [201 , 78]
LSF [V , H] = [137 ,56 ]  (image 400ms0007)           e- [H , V] = [190 , 93]
LSF [V , H] = [137 , 56]  (image 400ms0006)           e- [H , V] = [190 , 93]

** ENERGY-ANGLE prise de donnees (scan de spectres +40/-30 Horiz - +40/-40 Vert) 

22h30: Stop ThomX, spectrum for 70MeV acquired

  1222   Tue Mar 31 15:42:33 2026 KD MJFixedShift summaryLaser | Linac Commissionning | Ring Commissioning shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV 

/!\ fort impact du moteur Rsample de la ligne X sur la cavité CFP (obligé de le mettre off)

*** Prise mesure Monochromateur ***

* angle initiale mono : Ry_mono(0) = -0.1° (ajouté aux valeurs d'angles pour la position moteur)

* Position fentes initiale [-8;-17]

Point On Axis (problème de référence mono, surement position fentes [-10,-17]), image Pilatus 436 (70keV de threshold) et 439 (30keV de threshold) :

   - Angle Mono 1.33° --> position RSample : 2.92°

   - Angle Mono 1.6° --> position RSample : 3.45°

   - Angle Mono 1.3° --> position RSample : 2.88°

   - Angle Mono 1.23° --> position RSample : 2.73°

H +20mm (position hexapod TX = -13.5):

   - Angle Mono 1.33° --> position RSample : 2.8°

   - Angle Mono 1.6° --> position RSample : 3.3°

H +30mm (position hexapod TX = -24):

   - Angle Mono 1.6° --> position RSample : 3.15°

   - Angle Mono 1.8° --> position RSample : 3.55°

H -20mm (position hexapod TX = 30):

   - Angle Mono 1.23° --> position RSample : 2.95°

   - Angle Mono 1.6° --> position RSample : 3.7°

   - Angle Mono 1.33° --> position RSample : 3.15°

H -30mm (position hexapod TX = 41):

   - Angle Mono 1.33° --> position RSample : 3.25°

   - Angle Mono 1.23° --> position RSample : 3.05°

   - Angle Mono 1.1° --> position RSample : 2.8°

V +20mm (position hexapod TX = 9, TY : 20):

   - Angle Mono 1.33° --> position RSample : 3°

   - Angle Mono 1.6° --> position RSample : 3.55°

   - Angle Mono 1.23° --> position RSample : 2.8°

V -20mm (position hexapod TX = 9, TY : -20):

   - Angle Mono 1.23° --> position RSample : 2.8°

   - Angle Mono 1.6° --> position RSample : 3.55°

   - Angle Mono 1.33° --> position RSample : 3°

 

*** Vers 16h : Passage a 61.5 MeV

Centre faiseau a l'oeil : Fente2 [H , V] = [33 , -18]

Check Dromadaires spectres a V +40 ==> Cf screenshot Dromadaires_61p5_MeV

Vert : Yfpc = - 1.9 mm
Violet            - 1.6    (c'etait la meilleure position pour 50 MeV)
Bleu              - 1.4
Rouge           - 0.8
Noir               - 0.6

On se place a Yfpc = -0.8  car a peu pres correct ... (tres differente du cas 50 MeV)

Re-ouverture des Fente2 pour retrouver le centre faisceau
   ==> Avec Yfpc = -0.8, Plus possible de voir le centre du faisceau dans la config actuelle du Dectris. Cf sceenshot Dectris_centre_faisceau

A suivre demain ...
 

 

  5   Tue Dec 1 09:57:09 2020 Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020 Inforesumes Verrification pour le démarrage a blanc 

Verification de l'état de la Synchro : OK, tout les signaux sont en trigger externe.

Verification de l'état des diagnostiques :
- Libera 3 : n'est pas encore cofiguré (pas génant pour le démarrage a blanc)
- Caméra TL/DG/SST.03-CCD.01 : débranché (pas génant pour le démarrage a blanc)
- Moteur des fentes (TL/DG/SRH.01-MoG.01 et TL/DG/SRH.01-MoG.02) éteint (pas génant pour le démarrage a blanc)
-> OK pour le démarrage a blanc

  53   Fri Jul 16 14:33:28 2021 Entered by Maher OMEICH from 134.158.91.212 on Fri Jul 16 14:31:16 2021 LinacLinac Commissionning   
Activité semaine passée Canon -Montage canon sur la poutre fait -Premiers mesures canon bas niveau sur la poutre réaliser -Alignement laser avec la cathode trouée à Kevin Dupraz et Kevin Cassou ( détails sur E-LOG ) -Mise sous vide volume 2 ( en cours ) Modulateur/RF -Pas de suite de fonctionnement klystron à 37 MW ( incompatibilité des tâches en cours, problème vide volume 2 ) -Poursuite la semaine prochaine s’il n’y a pas de pbs Ligne cherenkov fait -Presque terminé à manque monture d’un miroir  Activité semaines prochaines Actions futures •Canon -alignement laser (en cours) -vérification rf bas niveau -MONTAGE D'UN BOUCHON LIL SUR LE CANON -pompage et test d'étanchéïté -raccord réseau d'eau-Modulateur/RF •Modulateur /RF -Poursuite la semaine prochaine s’il n’y a pas de pbs Si tests Modulateur /RF fini en fin de semaine prochaine: -Pompage SF6 du réseau ( ALTO contacté pour, la personne passera lundi 19/07 pour voir, si c’est ok pompage SF6 à la fin des tests Modulateur/RF en suite: -montage fenêtre d'étanchéïté -vérification rf bas niveau -pompage et test d'étanchéïté •Modifications à effectuer pour le long terme (purgeurs, débitmètre) sur la régulation d’eau modulateur -By-pass présent sur le réseau, certainement à régler (à prévoir semaine prochaine) •Retour d’information du panneau ordinateur du modulateur (visu et pilotage) •A testé avec Hayg et prendre décision pour la suite •Homogénéité des installations informatiques à traiter •Remonter les besoins à Hayg pour l’install par Guillaume Philippon
  54   Wed Jul 21 17:52:20 2021 Entered by Maher OMEICH from 134.158.91.212 on Wed Jul 21 17:51:56 2021 LinacLinac Commissionning fonctionnement modulateur / HF 

Mardi 20/07

Problème pour faire la ronde casemate thomx, porte 2 de la camsemate vérouilleée et intervention de IRDS

Fonctionnement du modulateur / RfF à 37 MW avec atténuateur canon réglé à 30 db pour limiter la puissance dans la charge qui remplace le canon,

durée 5h30 ( depuis 14h30 jusqu'à 8h00 )

 

  56   Tue Jul 27 09:58:38 2021 Entered by mohamed el khaldi from 134.158.76.146 on Tue Jul 27 09:58:14 2021 LinacLinac Commissionning tests non effectués à cause de modulateur qui se met off tout seul  

Nous n'avons pas pu faire les tests prévus pour le 26/07/2021 à cause de modulateur qui se met off tout seul (3 fois ==> 3 heures d'attente)

 Donc on a décidé d'arrêter.

Suggestion: voir ce qui s'est passé lors de la dernière intervention pour déporter le control panel

  57   Tue Jul 27 10:15:39 2021 Entered by Maher OMEICH from 134.158.91.212 on Tue Jul 27 10:15:11 2021 Shift summaryLinac Commissionning   

J'ai contacté Scandinova pour ce problème, j'ai eu un retour et j'ai envoyé les informations demandés, j'attends leur consignes en retour

Maher

  58   Tue Jul 27 10:20:32 2021 Entered by Maher OMEICH from 134.158.91.212 on Tue Jul 27 10:20:02 2021 Shift summaryLinac Commissionning   

J'ai oublié de préciser: le problème apparu le lundi 26/07 ( fonctionnement modulateur/HF demandé pour la section )

Maher

  59   Fri Jul 30 14:13:35 2021 Entered by Maher OMEICH from 134.158.91.212 on Fri Jul 30 14:13:07 2021 Shift summaryLinac Commissionning   

Suite à une panne aléatoire qui arrêtait le modulateur à plusieurs reprises le Mardi 27/07 et le Jeudi 29/07 j'étais en contact avec Scandinova ( constructeur du modulateur ) pour résoudre ce problème, d'après leurs réponses plusieurs choses peuvent être à l'origine de cette panne aléatoire, nous avons vérifier ce qui nous demander et reserrer des borniers de connexions de sécurité extérieures accéssibles et sous notre responsabilité.  et puis nous avons fait fonctionner le modulateur depuis  Jeudi 29/07 à 16h jusquà vendredi 30/07 à 18h00

Je vais faire fonctionner le modulateur la semaine du 02/08 qulques jours pour voir si cette panne est toujours d'actualité ou elle a disparu

  61   Tue Sep 7 12:09:17 2021 Entered by Maher OMEICH from 134.158.91.212 on Tue Sep 7 12:08:31 2021 LinacLinac Commissionning   

Lundi 6/09: Le réseau Thomx est sous SF6, le refroidissement du réseau est en fonctionnement

Le modulateur/klystron est utilisable pour le conditionnement

La commande pour l'intervention de Scandinova est partie, "possibilité" d'intervention de leur part Vendredi 10/09

 

 

 

  62   Thu Sep 9 09:23:27 2021 Entered by Maher OMEICH from 134.158.91.212 on Thu Sep 9 09:23:03 2021 InfoRF D1 intervention Scandinova 

Bonjour

Demain vendredi 10/09 aura lieu une intervention par Scandinova sur le modulateur

  71   Mon Sep 20 10:55:40 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Sep 20 10:55:19 2021 ProblemLinac Commissionning panne modulateur 

Ce matin ( lundi 20/09 ) l'interlock modulateur IntComm\Input missing est réapparu coupant le modulateur qui était prêt à fonctionner, j'ai envoyé un mail à Scandinova pour prévenir et demander une expertise.

  84   Fri Oct 1 16:42:41 2021 Entered by Alexandre Moutardier from 134.158.195.144 on Fri Oct 1 16:42:28 2021 InfoSY Réglage timing RF/Laser 

Le timing du laser et de la RF sont réglés.

Une recette (20211001_1631-sync_premier_faisceau.xml) a était sauvé.

  Draft   Mon Oct 18 11:26:58 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 18 11:26:41 2021    Shift condionnement RF : passage à 5Hz 
  Draft   Mon Oct 25 19:23:51 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 25 19:23:35 2021    , entered from 134.158.195.142 

Passage de la sect

  121   Tue Oct 26 15:19:17 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 15:18:59 2021 InfoRF D1 Image PIC PBC photodiode a l'oscilloscope en salle de controle 

Attenuateur RF canon : 0.25 dB

Orange : Photodiode
Vert : PBC
Jaune : PIC

  154   Mon Nov 8 12:16:13 2021 Entered by sophie chance from 134.158.195.141 on Mon Nov 8 12:15:59 2021 LinacLaser energie laser 

Mesure de 12 uJ avant hublot

  157   Mon Nov 8 18:01:06 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Mon Nov 8 18:00:52 2021 InfoDiag | Linac Commissionning Scan charge phase 

Scan charge ICT linac phase canon fait le 08 Nov 2021

Scan tous les degrés, 10 mesure de charges pars point de 150 à 360 degrés.

(script : $HOME_IHM//mesure_charge_from_raw.py
commande : ipython mesure_charge_from_raw.py 150 360 1 10 li)

ELOG V3.1.4-395e101